X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265031406002

Well Details

Well ID: 0265031406002
Loading map...
Location: 00/06-14-026-03W5/2
Location Alias: 00/06-14-26-03 W5M
Location Alias 2: 00/06-14-026-03 W5/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 03
Section: 14
County/Municipality: Rocky View County
Well Name: NAL LOCHEND 6-14-26-3
Operator Name: NAL Resources Limited
License Number: 0083259
License Date: 1980-06-05
License Status: Abandoned
Spud Date: 1980-06-15
Final Drill Date: 1980-08-10
Well Total Depth: 2896.00 m
Surface Hole Latitude: 51.216161
Surface Hole Longitude: -114.321163

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-05 Obtained License
1980-07-20 Drill Stem Test Performed
1980-07-24 Well Log Performed
1980-08-10 Finished Drilling
1980-08-10 Well Mode changed to Drilled and Cased
1980-08-11 Well Log Performed
1980-08-12 Drill Stem Test Performed
1980-08-13 Drill Stem Test Performed
1980-08-15 Liner Casing Operation Performed
1980-09-11 Perforation Treatment Performed - Jet Perforation
1980-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-13 Perforation Treatment Performed - Jet Perforation
1980-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-27 Plug Back Performed
1980-09-28 Perforation Treatment Performed - Jet Perforation
1980-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-01 Perforation Treatment Performed - Jet Perforation
1980-10-01 Plug Back Performed
1980-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-08 Plug Back Performed
1980-10-09 Perforation Treatment Performed - Jet Perforation
1980-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-15 Plug Back Performed
1980-10-16 Perforation Treatment Performed - Jet Perforation
1980-10-20 Perforation Treatment Performed - Fractured
1982-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-28 Well Log Performed
2009-03-30 Perforation Treatment Performed - Cement Plug
2009-03-30 Plug Back Performed
2009-03-30 Well Log Performed
2009-03-31 Perforation Treatment Performed - Jet Perforation
2009-03-31 Well Log Performed
2009-04-01 Perforation Treatment Performed - Cement Squeeze
2009-04-01 Plug Back Performed
2009-04-29 Perforation Treatment Performed - Jet Perforation
2009-04-30 Perforation Treatment Performed - Cement Squeeze
2009-04-30 Plug Back Performed
2009-05-30 Perforation Treatment Performed - Cement Plug
2009-05-30 Plug Back Performed
2009-05-30 Well Mode changed to Abandoned Zone
2009-06-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-11 Perforation 2798.00 2799.50 13
1980-10-01 Perforation 2751.50 2752.80 6
1980-10-01 Perforation 2755.50 2757.60 6
1980-10-03 Acid Treatment 2751.50 2757.60 0
1980-10-06 Acid Treatment 2751.50 2757.60 0
1980-10-08 Packing Device Capped w/Cement 2740.00 2748.00 0
1980-10-09 Perforation 2494.00 2495.30 13
1980-10-09 Perforation 2496.00 2497.30 13
1980-10-10 Acid Treatment 2494.00 2497.30 0
1980-10-15 Packing Device Capped w/Cement 2483.00 2491.00 0
1980-10-16 Perforation 2220.30 2223.00 13
1980-09-12 Acid Treatment 2798.00 2799.50 0
1980-10-20 Fracture 2220.30 2223.00 0
1982-12-12 Acid Treatment 2220.00 2223.00 0
2009-03-30 Cement Plug 2240.00 2248.00 0
2009-03-31 Perforation 885.00 886.00 13
2009-04-01 Cement Squeeze 870.00 901.00 0
2009-04-29 Perforation 515.00 525.00 13
2009-04-30 Cement Squeeze 515.00 525.00 0
2009-05-30 Cement Plug 449.00 541.40 0
1980-09-13 Perforation 2797.50 2800.50 13
1980-09-13 Acid Treatment 2797.50 2800.50 0
1980-09-27 Packing Device Capped w/Cement 2789.00 2796.00 0
1980-09-28 Perforation 2781.20 2782.10 13
1980-09-28 Perforation 2782.90 2784.50 13
1980-09-29 Acid Treatment 2781.20 2784.50 0
1980-10-01 Packing Device Capped w/Cement 2773.00 2779.00 0

For data sources see[4]



References