If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265031801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.226273,"lon":-114.397974,"icon":""}]} |
Location: 00/01-18-026-03W5/0 | |
Location Alias: 00/01-18-26-03 W5M | |
Location Alias 2: 00/01-18-026-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 03 | |
Section: 18 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL HZ COCHRANE 1-18-26-3 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0467033 | |
License Date: 2014-06-03 | |
License Status: Issued | |
Spud Date: 2015-08-21 | |
Final Drill Date: 2015-09-06 | |
Well Total Depth: 3865.00 m | |
Surface Hole Latitude: 51.226273 | |
Surface Hole Longitude: -114.397974 |
Date | Event |
---|---|
2014-06-03 | Obtained License |
2015-08-21 | Lost Circulation Occurred |
2015-08-26 | Surface Casing Operation Performed |
2015-08-29 | Direction Drilling Operation Performed - Deviate |
2015-09-01 | Direction Drilling Operation Performed - Horizontal |
2015-09-06 | Finished Drilling |
2015-09-06 | Well Log Performed |
2015-09-06 | Well Mode changed to Drilled and Cased |
2015-09-08 | Liner Casing Operation Performed |
2015-09-08 | Production Casing Operation Performed |
2015-09-10 | Rig Released |
2015-09-16 | Well Log Performed |
2015-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-21 | Perforation Treatment Performed - Open-Hole Completion |
2015-09-26 | Well Log Performed |
2015-10-14 | Well Began Production |
2015-10-14 | Well Fluid changed to Crude Oil |
2015-10-14 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-08-21 | Nabors Drilling Limited | 28 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-08-29 | 748.60 | Deviate (5 - 79 degrees) |
2015-09-01 | 2456.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-21 | Open Hole/Barefoot Completion | 3853.50 | 3865.00 | 0 |
2015-09-21 | Multi-Stage Fracture | 3370.00 | 3370.10 | 0 |
2015-09-21 | Multi-Stage Fracture | 3302.70 | 3302.80 | 0 |
2015-09-21 | Multi-Stage Fracture | 3244.50 | 3244.60 | 0 |
2015-09-21 | Multi-Stage Fracture | 3189.00 | 3189.10 | 0 |
2015-09-21 | Multi-Stage Fracture | 3121.80 | 3121.90 | 0 |
2015-09-21 | Multi-Stage Fracture | 3063.60 | 3063.70 | 0 |
2015-09-21 | Multi-Stage Fracture | 3009.30 | 3009.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 2942.30 | 2942.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 2877.40 | 2877.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2822.30 | 2822.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 3835.00 | 3835.10 | 0 |
2015-09-21 | Multi-Stage Fracture | 2751.30 | 2751.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 2694.50 | 2694.60 | 0 |
2015-09-21 | Multi-Stage Fracture | 2637.50 | 2637.60 | 0 |
2015-09-21 | Multi-Stage Fracture | 2567.90 | 2568.00 | 0 |
2015-09-21 | Multi-Stage Fracture | 3789.70 | 3789.80 | 0 |
2015-09-21 | Multi-Stage Fracture | 3735.00 | 3735.10 | 0 |
2015-09-21 | Multi-Stage Fracture | 3682.60 | 3682.70 | 0 |
2015-09-21 | Multi-Stage Fracture | 3615.70 | 3615.80 | 0 |
2015-09-21 | Multi-Stage Fracture | 3561.50 | 3561.60 | 0 |
2015-09-21 | Multi-Stage Fracture | 3494.30 | 3494.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 3424.90 | 3425.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-21 | 2015-09-21 | 2,352 | 2,678 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.0729 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.0015 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.991 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0133 | N/A | |
Water | 7732-18-5 | 100 | 0.014 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0975 | N/A | |
DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0841 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0853 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0841 | N/A | ||||
Triethylene glycol | 112-27-6 | 100 | 0.0853 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0846 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 1.8737 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0931 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-09-18 | 2015-09-21 | Municipal Water | 3019 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 1318 | 0.0 | 0.0 | 0.0 |
2016 | 8381 | 0.0 | 0.0 | 0.0 |
2017 | 8220 | 0.0 | 0.0 | 0.0 |
2018 | 8325 | 0.0 | 0.0 | 0.0 |
2019 | 8615 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-21 | Lost Circulation | 15.00 | 369.00 |
2015-10-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]