If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265032904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.271739,"lon":-114.399007,"icon":""}]} |
Location: 00/04-29-026-03W5/0 | |
Location Alias: 00/04-29-26-03 W5M | |
Location Alias 2: 00/04-29-026-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 03 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: TAC 4-5 HZ LOCHEND 4-29-26-3 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0493676 | |
License Date: 2019-02-01 | |
License Status: Issued | |
Spud Date: 2019-03-06 | |
Final Drill Date: 2019-03-15 | |
Well Total Depth: 5676.00 m | |
Surface Hole Latitude: 51.271739 | |
Surface Hole Longitude: -114.399007 |
Date | Event |
---|---|
2019-02-01 | Obtained License |
2019-03-07 | Surface Casing Operation Performed |
2019-03-10 | Direction Drilling Operation Performed - Deviate |
2019-03-11 | Direction Drilling Operation Performed - Horizontal |
2019-03-15 | Finished Drilling |
2019-03-15 | Well Log Performed |
2019-03-15 | Well Mode changed to Drilled and Cased |
2019-03-16 | Well Log Performed |
2019-03-17 | Production Casing Operation Performed |
2019-03-17 | Rig Released |
2019-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-08 | Well Began Production |
2019-04-08 | Well Fluid changed to Crude Oil |
2019-04-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-03-06 | Twilight Drilling Ltd. | 2 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-10 | 2069.30 | Deviate (5 - 79 degrees) |
2019-03-11 | 2455.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-24 | Multi-Stage Fracture | 5618.00 | 5618.10 | 0 |
2019-03-24 | Multi-Stage Fracture | 5171.20 | 5171.30 | 0 |
2019-03-24 | Multi-Stage Fracture | 5123.50 | 5123.60 | 0 |
2019-03-24 | Multi-Stage Fracture | 5076.60 | 5076.70 | 0 |
2019-03-24 | Multi-Stage Fracture | 5030.00 | 5030.10 | 0 |
2019-03-24 | Multi-Stage Fracture | 4983.00 | 4983.10 | 0 |
2019-03-24 | Multi-Stage Fracture | 4937.10 | 4937.20 | 0 |
2019-03-24 | Multi-Stage Fracture | 4891.20 | 4891.30 | 0 |
2019-03-24 | Multi-Stage Fracture | 4844.60 | 4844.70 | 0 |
2019-03-24 | Multi-Stage Fracture | 4783.60 | 4783.70 | 0 |
2019-03-24 | Multi-Stage Fracture | 4736.40 | 4736.50 | 0 |
2019-03-24 | Multi-Stage Fracture | 5571.90 | 5572.00 | 0 |
2019-03-24 | Multi-Stage Fracture | 4691.40 | 4691.50 | 0 |
2019-03-25 | Multi-Stage Fracture | 4644.00 | 4644.10 | 0 |
2019-03-25 | Multi-Stage Fracture | 4597.30 | 4597.40 | 0 |
2019-03-25 | Multi-Stage Fracture | 4535.20 | 4535.30 | 0 |
2019-03-25 | Multi-Stage Fracture | 4487.40 | 4487.50 | 0 |
2019-03-25 | Multi-Stage Fracture | 4439.40 | 4439.50 | 0 |
2019-03-25 | Multi-Stage Fracture | 4392.70 | 4392.80 | 0 |
2019-03-25 | Multi-Stage Fracture | 4345.00 | 4345.10 | 0 |
2019-03-25 | Multi-Stage Fracture | 4282.60 | 4282.70 | 0 |
2019-03-25 | Multi-Stage Fracture | 4235.80 | 4235.90 | 0 |
2019-03-24 | Multi-Stage Fracture | 5510.20 | 5510.30 | 0 |
2019-03-25 | Multi-Stage Fracture | 4174.80 | 4174.90 | 0 |
2019-03-25 | Multi-Stage Fracture | 4128.30 | 4128.40 | 0 |
2019-03-25 | Multi-Stage Fracture | 4081.30 | 4081.40 | 0 |
2019-03-25 | Multi-Stage Fracture | 4019.80 | 4019.90 | 0 |
2019-03-25 | Multi-Stage Fracture | 3972.10 | 3972.20 | 0 |
2019-03-25 | Multi-Stage Fracture | 3925.00 | 3925.10 | 0 |
2019-03-25 | Multi-Stage Fracture | 3867.10 | 3867.20 | 0 |
2019-03-25 | Multi-Stage Fracture | 3820.90 | 3821.00 | 0 |
2019-03-25 | Multi-Stage Fracture | 3766.10 | 3766.20 | 0 |
2019-03-25 | Multi-Stage Fracture | 3717.80 | 3717.90 | 0 |
2019-03-24 | Multi-Stage Fracture | 5462.40 | 5462.50 | 0 |
2019-03-25 | Multi-Stage Fracture | 3662.50 | 3662.60 | 0 |
2019-03-25 | Multi-Stage Fracture | 3611.30 | 3611.40 | 0 |
2019-03-25 | Multi-Stage Fracture | 3556.70 | 3556.80 | 0 |
2019-03-25 | Multi-Stage Fracture | 3504.60 | 3504.70 | 0 |
2019-03-25 | Multi-Stage Fracture | 3447.70 | 3447.80 | 0 |
2019-03-25 | Multi-Stage Fracture | 3399.30 | 3399.40 | 0 |
2019-03-25 | Multi-Stage Fracture | 3339.10 | 3339.20 | 0 |
2019-03-25 | Multi-Stage Fracture | 3290.70 | 3290.80 | 0 |
2019-03-25 | Multi-Stage Fracture | 3227.90 | 3228.00 | 0 |
2019-03-25 | Multi-Stage Fracture | 3179.60 | 3179.70 | 0 |
2019-03-24 | Multi-Stage Fracture | 5414.70 | 5414.80 | 0 |
2019-03-25 | Multi-Stage Fracture | 3116.80 | 3116.90 | 0 |
2019-03-25 | Multi-Stage Fracture | 3068.50 | 3068.60 | 0 |
2019-03-25 | Multi-Stage Fracture | 3020.20 | 3020.30 | 0 |
2019-03-25 | Multi-Stage Fracture | 2957.50 | 2957.60 | 0 |
2019-03-25 | Multi-Stage Fracture | 2909.20 | 2909.30 | 0 |
2019-03-25 | Multi-Stage Fracture | 2861.10 | 2861.20 | 0 |
2019-03-25 | Multi-Stage Fracture | 2812.30 | 2812.40 | 0 |
2019-03-25 | Multi-Stage Fracture | 2764.10 | 2764.20 | 0 |
2019-03-26 | Multi-Stage Fracture | 2702.10 | 2702.20 | 0 |
2019-03-26 | Multi-Stage Fracture | 2654.00 | 2654.10 | 0 |
2019-03-24 | Multi-Stage Fracture | 5369.90 | 5370.00 | 0 |
2019-03-26 | Multi-Stage Fracture | 2605.70 | 2605.80 | 0 |
2019-03-24 | Multi-Stage Fracture | 5322.40 | 5322.50 | 0 |
2019-03-24 | Multi-Stage Fracture | 5261.40 | 5261.50 | 0 |
2019-03-24 | Multi-Stage Fracture | 5215.90 | 5216.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-03-24 | 2019-03-26 | 2,343 | 7,287 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | 7647-01-0 | 100 | 0.7686 | N/A | |||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.7648 | N/A | ||||
Water | 7732-18-5 | 100 | 95.5119 | N/A | ||||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.9392 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.5811 | N/A | ||
ELEAS-1 Antisludge Agent | Element | Acid | 2-Propanol | 67-63-0 | 100 | 0.0034 | N/A | |
Dodecyl benzene sulfonic acid | 27176-87-0 | 100 | 0.0034 | N/A | ||||
Sulfuric acid | 7664-93-9 | 100 | 0.0034 | N/A | ||||
ELECA-1 Coupling Agent | Element | Acid | Amides. coco. N-[3-(dimethylamino)propyl]. alkylation products with chloroacetic acid. sodium salts |
70851-07-9 | 100 | 0.0008 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0008 | N/A | ||||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0065 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0065 | N/A | ||||
ELEBR-4 | Element | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0029 | N/A | |
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0733 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0733 | N/A | ||||
ELECI-4 Corrosion Inhibitor | Element | Corrosion Inhibitor | 2-Propanol | 67-63-0 | 100 | 0.0025 | N/A | |
Acetic acid | 64-19-7 | 100 | 0.0025 | N/A | ||||
Cinnamaldehyde | 104-55-2 | 100 | 0.0025 | N/A | ||||
Ethylene glycol | 107-21-1 | 100 | 0.0025 | N/A | ||||
Formic acid | 64-18-6 | 100 | 0.0025 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alpha-[tris(1-phenylethyl)phenyl]- omega -hydroxy- |
99734-09-5 | 100 | 0.0025 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0694 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0694 | N/A | ||||
ELEIR-1 Iron Control | Element | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.0025 | N/A | |
Ammonium chloride | 12125-02-9 | 100 | 0.0025 | N/A | ||||
Ammonium hydroxide | 1336-21-6 | 100 | 0.0025 | N/A | ||||
Copper(I) chloride | 7758-89-6 | 100 | 0.0025 | N/A | ||||
Ethanol. 2.2'-dithiodi | 1892-29-1 | 100 | 0.0025 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0017 | N/A | |
Methanol | 67-56-1 | 100 | 0.0017 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0017 | N/A | ||||
ELEFE-4 IFTR | Element | Surfactant | Alkylbenzenesulfonic acid | Trade Secret | 100 | 0.0629 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0629 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0629 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0629 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-03-23 | 2019-03-26 | Surface Water - Runoff | 7667 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6480 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-17 | No Incident Encountered | 0.00 | 0.00 |
2019-03-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]