If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265033602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.26997,"lon":-114.291798,"icon":""}]} |
Location: 00/02-36-026-03W5/0 | |
Location Alias: 00/02-36-26-03 W5M | |
Location Alias 2: 00/02-36-026-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 03 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL HZ LOCHEND 2-36-26-3 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0431351 | |
License Date: 2011-02-09 | |
License Status: Suspension | |
Spud Date: 2011-02-15 | |
Final Drill Date: 2011-03-04 | |
Well Total Depth: 3378.00 m | |
Surface Hole Latitude: 51.269970 | |
Surface Hole Longitude: -114.291798 |
Date | Event |
---|---|
2011-02-09 | Obtained License |
2011-02-17 | Surface Casing Operation Performed |
2011-02-20 | Direction Drilling Operation Performed - Horizontal |
2011-02-26 | Intermediate Casing Operation Performed |
2011-02-26 | Production Casing Operation Performed |
2011-03-04 | Finished Drilling |
2011-03-04 | Well Mode changed to Drilled and Cased |
2011-03-06 | Liner Casing Operation Performed |
2011-03-06 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-03-07 | Rig Released |
2011-04-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-02 | Perforation Treatment Performed - Open-Hole Completion |
2011-04-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-01 | Well Began Production |
2011-05-01 | Well Fluid changed to Crude Oil |
2011-05-01 | Well Mode changed to Flowing |
2016-04-01 | Well Fluid changed to Crude Oil |
2016-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-20 | 1842.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-06 | Slotted Liner | 2263.40 | 3378.00 | 0 |
2011-04-02 | Multi-Stage Fracture | 2969.50 | 2969.60 | 0 |
2011-04-02 | Multi-Stage Fracture | 2918.40 | 2918.50 | 0 |
2011-04-02 | Multi-Stage Fracture | 2868.00 | 2868.10 | 0 |
2011-04-03 | Multi-Stage Fracture | 2805.40 | 2805.50 | 0 |
2011-04-03 | Multi-Stage Fracture | 2754.50 | 2754.60 | 0 |
2011-04-03 | Multi-Stage Fracture | 2703.60 | 2703.70 | 0 |
2011-04-03 | Multi-Stage Fracture | 2641.60 | 2641.70 | 0 |
2011-04-03 | Multi-Stage Fracture | 2590.80 | 2590.90 | 0 |
2011-04-03 | Multi-Stage Fracture | 2539.60 | 2539.70 | 0 |
2011-04-03 | Multi-Stage Fracture | 2488.20 | 2488.30 | 0 |
2011-04-02 | Open Hole/Barefoot Completion | 3373.00 | 3378.00 | 0 |
2011-04-03 | Multi-Stage Fracture | 2425.90 | 2426.00 | 0 |
2011-04-03 | Multi-Stage Fracture | 2374.90 | 2375.00 | 0 |
2011-04-03 | Multi-Stage Fracture | 2323.70 | 2323.80 | 0 |
2011-04-02 | Multi-Stage Fracture | 3352.30 | 3352.40 | 0 |
2011-04-02 | Multi-Stage Fracture | 3298.90 | 3299.00 | 0 |
2011-04-02 | Multi-Stage Fracture | 3236.20 | 3236.30 | 0 |
2011-04-02 | Multi-Stage Fracture | 3184.90 | 3185.00 | 0 |
2011-04-02 | Multi-Stage Fracture | 3133.90 | 3134.00 | 0 |
2011-04-02 | Multi-Stage Fracture | 3082.80 | 3082.90 | 0 |
2011-04-02 | Multi-Stage Fracture | 3020.30 | 3020.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5586 | 0.0 | 0.0 | 0.0 |
2012 | 8734 | 0.0 | 0.0 | 0.0 |
2013 | 8715 | 0.0 | 0.0 | 0.0 |
2014 | 8649 | 0.0 | 0.0 | 0.0 |
2015 | 4007 | 0.0 | 0.0 | 0.0 |
For data sources see[6]