X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265041103000

Well Details

Well ID: 0265041103000
Loading map...
Location: 00/03-11-026-04W5/0
Location Alias: 00/03-11-26-04 W5M
Location Alias 2: 00/03-11-026-04 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 04
Section: 11
County/Municipality: Rocky View County
Well Name: RIDGEBACK COCHRANE 3-11-26-4
Operator Name: Ridgeback Resources Inc.
License Number: 0466947
License Date: 2014-05-29
License Status: Issued
Spud Date: 2014-08-13
Final Drill Date: 2014-09-04
Well Total Depth: 5512.00 m
Surface Hole Latitude: 51.227728
Surface Hole Longitude: -114.461953

For data sources see[1][2]

Well History

Date Event
2014-05-29 Obtained License
2014-08-14 Surface Casing Operation Performed
2014-08-19 Direction Drilling Operation Performed - Deviate
2014-08-20 Direction Drilling Operation Performed - Horizontal
2014-08-21 Well Log Performed
2014-08-29 Production Casing Operation Performed
2014-09-04 Finished Drilling
2014-09-04 Perforation Treatment Performed - Open-Hole Completion
2014-09-04 Well Log Performed
2014-09-04 Well Mode changed to Drilled and Cased
2014-09-10 Rig Released
2014-09-29 Well Log Performed
2014-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-11 Well Began Production
2014-10-11 Well Fluid changed to Crude Oil
2014-10-11 Well Mode changed to Flowing
2014-10-21 Well Log Performed
2014-11-05 Well Fluid changed to Crude Oil
2014-11-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-13 Precision Drilling Corporation 309 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-19 1983.00 Deviate (5 - 79 degrees)
2014-08-20 2587.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-04 Open Hole/Barefoot Completion 5506.00 5512.00 0
2014-10-07 Multi-Stage Fracture 4868.80 4868.90 0
2014-10-07 Multi-Stage Fracture 4789.20 4789.30 0
2014-10-08 Multi-Stage Fracture 4709.90 4710.00 0
2014-10-08 Multi-Stage Fracture 4617.40 4617.50 0
2014-10-08 Multi-Stage Fracture 4538.50 4538.60 0
2014-10-08 Multi-Stage Fracture 4459.20 4459.30 0
2014-10-08 Multi-Stage Fracture 4379.40 4379.50 0
2014-10-08 Multi-Stage Fracture 4300.50 4300.60 0
2014-10-08 Multi-Stage Fracture 4221.10 4221.20 0
2014-10-08 Multi-Stage Fracture 4142.30 4142.40 0
2014-10-07 Multi-Stage Fracture 5494.50 5494.60 0
2014-10-08 Multi-Stage Fracture 4063.30 4063.40 0
2014-10-08 Multi-Stage Fracture 3983.80 3983.90 0
2014-10-08 Multi-Stage Fracture 3904.30 3904.40 0
2014-10-08 Multi-Stage Fracture 3825.40 3825.50 0
2014-10-08 Multi-Stage Fracture 3745.70 3745.80 0
2014-10-08 Multi-Stage Fracture 3665.90 3666.00 0
2014-10-08 Multi-Stage Fracture 3586.10 3586.20 0
2014-10-08 Multi-Stage Fracture 3506.60 3506.70 0
2014-10-08 Multi-Stage Fracture 3426.60 3426.70 0
2014-10-08 Multi-Stage Fracture 3348.00 3348.10 0
2014-10-07 Multi-Stage Fracture 5424.40 5424.50 0
2014-10-08 Multi-Stage Fracture 3268.00 3268.10 0
2014-10-08 Multi-Stage Fracture 3188.30 3188.40 0
2014-10-08 Multi-Stage Fracture 3110.00 3110.10 0
2014-10-08 Multi-Stage Fracture 3030.40 3030.50 0
2014-10-08 Multi-Stage Fracture 2950.30 2950.40 0
2014-10-08 Multi-Stage Fracture 2871.10 2871.20 0
2014-10-08 Multi-Stage Fracture 2776.80 2776.90 0
2014-10-08 Multi-Stage Fracture 2697.50 2697.60 0
2014-10-07 Multi-Stage Fracture 5344.60 5344.70 0
2014-10-07 Multi-Stage Fracture 5265.60 5265.70 0
2014-10-07 Multi-Stage Fracture 5186.40 5186.50 0
2014-10-07 Multi-Stage Fracture 5106.50 5106.60 0
2014-10-07 Multi-Stage Fracture 5027.00 5027.10 0
2014-10-07 Multi-Stage Fracture 4948.30 4948.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-07 2014-10-08 2,403 6,219 N/A
2 2014-10-08 2014-10-08 2,403 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.3572 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.4203 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0072 N/A
Water 7732-18-5 100 0.0078 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1175 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0545 N/A
Ethoxylated phenolic resin 8300 100 0.0565 N/A
Isobutyl ketone 8300 100 0.0548 N/A
Non-Hazardous Ingredients Trade Secret 100 0.073 N/A
Organic acid salts 1 8300 100 0.0545 N/A
Organic acid salts 2 8300 100 0.0562 N/A
Organic acid salts 3 8300 100 0.0565 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 6.3429 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0561 N/A
2 20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 7.2291 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-29 2014-09-30 Surface Water - Lake 3385
2014-09-29 2014-09-30 Municipal Water 3085

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1385 0.0 0.0 0.0
2015 8439 0.0 0.0 0.0
2016 8632 0.0 0.0 0.0
2017 8394 0.0 0.0 0.0
2018 8490 0.0 0.0 0.0
2019 8680 0.0 0.0 0.0
2020 2094 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-10 No Incident Encountered 0.00 0.00
2014-10-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References