If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265041103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.227728,"lon":-114.461953,"icon":""}]} |
Location: 00/03-11-026-04W5/0 | |
Location Alias: 00/03-11-26-04 W5M | |
Location Alias 2: 00/03-11-026-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 04 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: RIDGEBACK COCHRANE 3-11-26-4 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0466947 | |
License Date: 2014-05-29 | |
License Status: Issued | |
Spud Date: 2014-08-13 | |
Final Drill Date: 2014-09-04 | |
Well Total Depth: 5512.00 m | |
Surface Hole Latitude: 51.227728 | |
Surface Hole Longitude: -114.461953 |
Date | Event |
---|---|
2014-05-29 | Obtained License |
2014-08-14 | Surface Casing Operation Performed |
2014-08-19 | Direction Drilling Operation Performed - Deviate |
2014-08-20 | Direction Drilling Operation Performed - Horizontal |
2014-08-21 | Well Log Performed |
2014-08-29 | Production Casing Operation Performed |
2014-09-04 | Finished Drilling |
2014-09-04 | Perforation Treatment Performed - Open-Hole Completion |
2014-09-04 | Well Log Performed |
2014-09-04 | Well Mode changed to Drilled and Cased |
2014-09-10 | Rig Released |
2014-09-29 | Well Log Performed |
2014-10-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-10-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-10-11 | Well Began Production |
2014-10-11 | Well Fluid changed to Crude Oil |
2014-10-11 | Well Mode changed to Flowing |
2014-10-21 | Well Log Performed |
2014-11-05 | Well Fluid changed to Crude Oil |
2014-11-05 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-08-13 | Precision Drilling Corporation | 309 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-08-19 | 1983.00 | Deviate (5 - 79 degrees) |
2014-08-20 | 2587.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-09-04 | Open Hole/Barefoot Completion | 5506.00 | 5512.00 | 0 |
2014-10-07 | Multi-Stage Fracture | 4868.80 | 4868.90 | 0 |
2014-10-07 | Multi-Stage Fracture | 4789.20 | 4789.30 | 0 |
2014-10-08 | Multi-Stage Fracture | 4709.90 | 4710.00 | 0 |
2014-10-08 | Multi-Stage Fracture | 4617.40 | 4617.50 | 0 |
2014-10-08 | Multi-Stage Fracture | 4538.50 | 4538.60 | 0 |
2014-10-08 | Multi-Stage Fracture | 4459.20 | 4459.30 | 0 |
2014-10-08 | Multi-Stage Fracture | 4379.40 | 4379.50 | 0 |
2014-10-08 | Multi-Stage Fracture | 4300.50 | 4300.60 | 0 |
2014-10-08 | Multi-Stage Fracture | 4221.10 | 4221.20 | 0 |
2014-10-08 | Multi-Stage Fracture | 4142.30 | 4142.40 | 0 |
2014-10-07 | Multi-Stage Fracture | 5494.50 | 5494.60 | 0 |
2014-10-08 | Multi-Stage Fracture | 4063.30 | 4063.40 | 0 |
2014-10-08 | Multi-Stage Fracture | 3983.80 | 3983.90 | 0 |
2014-10-08 | Multi-Stage Fracture | 3904.30 | 3904.40 | 0 |
2014-10-08 | Multi-Stage Fracture | 3825.40 | 3825.50 | 0 |
2014-10-08 | Multi-Stage Fracture | 3745.70 | 3745.80 | 0 |
2014-10-08 | Multi-Stage Fracture | 3665.90 | 3666.00 | 0 |
2014-10-08 | Multi-Stage Fracture | 3586.10 | 3586.20 | 0 |
2014-10-08 | Multi-Stage Fracture | 3506.60 | 3506.70 | 0 |
2014-10-08 | Multi-Stage Fracture | 3426.60 | 3426.70 | 0 |
2014-10-08 | Multi-Stage Fracture | 3348.00 | 3348.10 | 0 |
2014-10-07 | Multi-Stage Fracture | 5424.40 | 5424.50 | 0 |
2014-10-08 | Multi-Stage Fracture | 3268.00 | 3268.10 | 0 |
2014-10-08 | Multi-Stage Fracture | 3188.30 | 3188.40 | 0 |
2014-10-08 | Multi-Stage Fracture | 3110.00 | 3110.10 | 0 |
2014-10-08 | Multi-Stage Fracture | 3030.40 | 3030.50 | 0 |
2014-10-08 | Multi-Stage Fracture | 2950.30 | 2950.40 | 0 |
2014-10-08 | Multi-Stage Fracture | 2871.10 | 2871.20 | 0 |
2014-10-08 | Multi-Stage Fracture | 2776.80 | 2776.90 | 0 |
2014-10-08 | Multi-Stage Fracture | 2697.50 | 2697.60 | 0 |
2014-10-07 | Multi-Stage Fracture | 5344.60 | 5344.70 | 0 |
2014-10-07 | Multi-Stage Fracture | 5265.60 | 5265.70 | 0 |
2014-10-07 | Multi-Stage Fracture | 5186.40 | 5186.50 | 0 |
2014-10-07 | Multi-Stage Fracture | 5106.50 | 5106.60 | 0 |
2014-10-07 | Multi-Stage Fracture | 5027.00 | 5027.10 | 0 |
2014-10-07 | Multi-Stage Fracture | 4948.30 | 4948.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-07 | 2014-10-08 | 2,403 | 6,219 | N/A |
2 | 2014-10-08 | 2014-10-08 | 2,403 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.3572 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.4203 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0072 | N/A | |
Water | 7732-18-5 | 100 | 0.0078 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1175 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0545 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0565 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0548 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.073 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0545 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0562 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0565 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.3429 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0561 | N/A | |
2 | 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.2291 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-09-29 | 2014-09-30 | Surface Water - Lake | 3385 |
2014-09-29 | 2014-09-30 | Municipal Water | 3085 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1385 | 0.0 | 0.0 | 0.0 |
2015 | 8439 | 0.0 | 0.0 | 0.0 |
2016 | 8632 | 0.0 | 0.0 | 0.0 |
2017 | 8394 | 0.0 | 0.0 | 0.0 |
2018 | 8490 | 0.0 | 0.0 | 0.0 |
2019 | 8680 | 0.0 | 0.0 | 0.0 |
2020 | 2094 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-09-10 | No Incident Encountered | 0.00 | 0.00 |
2014-10-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]