X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274250110000

Well Details

Well ID: 0274250110000
Loading map...
Location: 00/10-01-027-25W4/0
Location Alias: 00/10-01-27-25 W4M
Location Alias 2: 00/10-01-027-25 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 25
Section: 01
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 10-1-27-25
Operator Name: Ember Resources Inc.
License Number: 0401732
License Date: 2008-10-02
License Status: Issued
Spud Date: 2008-10-20
Final Drill Date: 2008-10-21
Well Total Depth: 700.00 m
Surface Hole Latitude: 51.278322
Surface Hole Longitude: -113.387396

For data sources see[1][2]

Well History

Date Event
2008-10-02 Obtained License
2008-10-20 Surface Casing Operation Performed
2008-10-21 Finished Drilling
2008-10-21 Production Casing Operation Performed
2008-10-21 Rig Released
2008-10-21 Well Log Performed
2008-10-21 Well Mode changed to Drilled and Cased
2008-10-24 Well Log Performed
2008-11-08 Perforation Treatment Performed - Jet Perforation
2008-11-26 Perforation Treatment Performed - Jet Perforation
2008-12-02 Perforation Treatment Performed - Fractured
2009-03-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-11-08 Perforation 514.00 517.00 13
2008-11-26 Perforation 466.50 469.50 13
2008-11-26 Perforation 454.00 454.50 13
2008-11-26 Perforation 444.10 444.60 13
2008-11-26 Perforation 434.10 434.60 13
2008-11-26 Perforation 426.60 427.10 13
2008-11-26 Perforation 422.10 424.10 13
2008-11-26 Perforation 405.80 406.30 13
2008-11-26 Perforation 402.00 402.50 13
2008-11-26 Perforation 361.30 361.80 13
2008-11-26 Perforation 354.20 354.70 13
2008-11-26 Perforation 586.90 587.40 13
2008-11-26 Perforation 309.60 310.10 13
2008-11-26 Perforation 304.40 304.90 13
2008-11-26 Perforation 290.60 291.10 13
2008-11-26 Perforation 284.20 285.20 13
2008-11-26 Perforation 229.80 230.30 13
2008-12-02 Fracture 229.80 587.40 0
2008-11-26 Perforation 582.80 583.30 13
2008-11-26 Perforation 546.60 547.10 13
2008-11-26 Perforation 543.20 543.70 13
2008-11-26 Perforation 536.80 537.80 13
2008-11-26 Perforation 529.80 530.80 13
2008-11-26 Perforation 522.40 522.90 13
2008-11-26 Perforation 497.50 498.00 13

For data sources see[4]



References