If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274250604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.274152,"lon":-113.518821,"icon":""}]} |
| Location: 00/04-06-027-25W4/0 | |
| Location Alias: 00/04-06-27-25 W4M | |
| Location Alias 2: 00/04-06-027-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 06 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 4-6-27-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0421439 | |
| License Date: 2010-06-30 | |
| License Status: Issued | |
| Spud Date: 2010-10-12 | |
| Final Drill Date: 2010-11-02 | |
| Well Total Depth: 938.00 m | |
| Surface Hole Latitude: 51.274152 | |
| Surface Hole Longitude: -113.518821 |
| Date | Event |
|---|---|
| 2010-06-30 | Obtained License |
| 2010-10-13 | Surface Casing Operation Performed |
| 2010-11-02 | Finished Drilling |
| 2010-11-02 | Production Casing Operation Performed |
| 2010-11-02 | Rig Released |
| 2010-11-02 | Well Mode changed to Drilled and Cased |
| 2010-11-05 | Well Log Performed |
| 2010-12-18 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-03 | Perforation Treatment Performed - Fractured |
| 2011-02-22 | Well Began Production |
| 2011-02-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-22 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-18 | Perforation | 529.00 | 531.00 | 13 |
| 2011-01-22 | Perforation | 545.10 | 545.60 | 13 |
| 2011-01-22 | Perforation | 554.70 | 555.20 | 13 |
| 2011-01-22 | Perforation | 504.50 | 505.10 | 13 |
| 2011-01-22 | Perforation | 539.20 | 539.70 | 13 |
| 2011-01-22 | Perforation | 473.80 | 474.30 | 13 |
| 2011-01-22 | Perforation | 323.70 | 324.20 | 13 |
| 2011-01-22 | Perforation | 331.50 | 332.50 | 13 |
| 2011-01-22 | Perforation | 254.60 | 255.10 | 13 |
| 2011-01-22 | Perforation | 311.70 | 312.20 | 13 |
| 2011-01-22 | Perforation | 341.30 | 341.80 | 13 |
| 2010-12-18 | Perforation | 506.50 | 508.50 | 13 |
| 2011-01-22 | Perforation | 459.30 | 459.80 | 13 |
| 2011-01-22 | Perforation | 463.80 | 464.30 | 13 |
| 2011-01-22 | Perforation | 437.70 | 439.20 | 13 |
| 2011-01-22 | Perforation | 455.00 | 456.00 | 13 |
| 2011-01-22 | Perforation | 536.50 | 538.50 | 13 |
| 2011-01-22 | Perforation | 685.00 | 687.00 | 13 |
| 2011-01-22 | Perforation | 218.50 | 220.50 | 13 |
| 2011-01-22 | Perforation | 338.50 | 340.50 | 13 |
| 2011-01-22 | Perforation | 845.00 | 846.00 | 13 |
| 2011-01-22 | Perforation | 860.00 | 862.00 | 13 |
| 2010-12-18 | Perforation | 676.00 | 678.00 | 13 |
| 2011-01-22 | Perforation | 753.00 | 755.00 | 13 |
| 2011-01-22 | Perforation | 813.00 | 814.50 | 13 |
| 2011-01-22 | Perforation | 565.00 | 566.00 | 13 |
| 2011-01-22 | Perforation | 575.90 | 576.90 | 13 |
| 2011-01-22 | Perforation | 570.90 | 572.40 | 13 |
| 2011-01-22 | Perforation | 618.80 | 619.30 | 13 |
| 2011-01-22 | Perforation | 613.00 | 614.00 | 13 |
| 2011-02-03 | Fracture | 613.00 | 619.30 | 0 |
| 2011-02-03 | Fracture | 254.60 | 332.50 | 0 |
| 2011-02-03 | Fracture | 539.20 | 576.90 | 0 |
| 2010-12-18 | Perforation | 591.50 | 593.50 | 13 |
| 2011-02-03 | Fracture | 341.30 | 505.10 | 0 |
| 2011-02-03 | Fracture | 506.50 | 538.50 | 0 |
| 2011-02-03 | Fracture | 753.00 | 862.00 | 0 |
| 2011-02-03 | Fracture | 676.00 | 687.00 | 0 |
| 2011-02-03 | Fracture | 591.50 | 593.50 | 0 |
| 2011-02-03 | Fracture | 218.50 | 220.50 | 0 |
| 2011-02-03 | Fracture | 338.50 | 340.50 | 0 |
| 2011-01-22 | Perforation | 487.70 | 488.20 | 13 |
| 2011-01-22 | Perforation | 501.60 | 502.10 | 13 |
| 2011-01-22 | Perforation | 480.70 | 481.20 | 13 |
| 2011-01-22 | Perforation | 483.00 | 483.50 | 13 |
| 2011-01-22 | Perforation | 502.40 | 502.90 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7497 | 0.0 | 0.0 | 0.0 |
| 2012 | 8739 | 0.0 | 0.0 | 0.0 |
| 2013 | 8752 | 0.0 | 0.0 | 0.0 |
| 2014 | 8625 | 0.0 | 0.0 | 0.0 |
| 2015 | 8614 | 0.0 | 0.0 | 0.0 |
| 2016 | 8697 | 0.0 | 0.0 | 0.0 |
| 2017 | 8402 | 0.0 | 0.0 | 0.0 |
| 2018 | 8637 | 0.0 | 0.0 | 0.0 |
| 2019 | 8659 | 0.0 | 0.0 | 0.0 |
| 2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]