If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274250614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.283453,"lon":-113.511856,"icon":""}]} |
Location: 00/14-06-027-25W4/0 | |
Location Alias: 00/14-06-27-25 W4M | |
Location Alias 2: 00/14-06-027-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 14-6-27-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425654 | |
License Date: 2010-11-09 | |
License Status: Issued | |
Spud Date: 2011-01-16 | |
Final Drill Date: 2011-01-20 | |
Well Total Depth: 713.00 m | |
Surface Hole Latitude: 51.283453 | |
Surface Hole Longitude: -113.511856 |
Date | Event |
---|---|
2010-11-09 | Obtained License |
2011-01-16 | Surface Casing Operation Performed |
2011-01-20 | Finished Drilling |
2011-01-20 | Production Casing Operation Performed |
2011-01-20 | Well Mode changed to Drilled and Cased |
2011-01-21 | Rig Released |
2011-01-30 | Well Log Performed |
2011-03-07 | Perforation Treatment Performed - Jet Perforation |
2011-03-12 | Perforation Treatment Performed - Fractured |
2011-05-27 | Well Began Production |
2011-05-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-05-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-07 | Perforation | 496.10 | 499.10 | 13 |
2011-03-07 | Perforation | 605.20 | 605.70 | 13 |
2011-03-07 | Perforation | 560.00 | 561.00 | 13 |
2011-03-07 | Perforation | 567.20 | 568.20 | 13 |
2011-03-07 | Perforation | 571.90 | 572.90 | 13 |
2011-03-07 | Perforation | 330.10 | 330.60 | 13 |
2011-03-07 | Perforation | 335.90 | 336.40 | 13 |
2011-03-07 | Perforation | 337.40 | 337.90 | 13 |
2011-03-07 | Perforation | 210.60 | 211.60 | 13 |
2011-03-07 | Perforation | 309.90 | 310.40 | 13 |
2011-03-07 | Perforation | 315.90 | 316.40 | 13 |
2011-03-07 | Perforation | 534.90 | 535.40 | 13 |
2011-03-07 | Perforation | 378.00 | 378.50 | 13 |
2011-03-07 | Perforation | 455.10 | 455.60 | 13 |
2011-03-07 | Perforation | 459.10 | 459.60 | 13 |
2011-03-07 | Perforation | 468.20 | 468.70 | 13 |
2011-03-07 | Perforation | 432.00 | 432.50 | 13 |
2011-03-07 | Perforation | 433.00 | 434.00 | 13 |
2011-03-07 | Perforation | 449.30 | 450.30 | 13 |
2011-03-07 | Perforation | 610.90 | 611.40 | 13 |
2011-03-07 | Perforation | 350.00 | 353.00 | 13 |
2011-03-07 | Perforation | 409.00 | 411.00 | 13 |
2011-03-07 | Perforation | 539.90 | 540.40 | 13 |
2011-03-07 | Perforation | 421.00 | 423.00 | 13 |
2011-03-07 | Perforation | 307.00 | 309.00 | 13 |
2011-03-07 | Perforation | 313.00 | 314.00 | 13 |
2011-03-07 | Perforation | 325.00 | 328.00 | 13 |
2011-03-07 | Perforation | 530.00 | 533.00 | 13 |
2011-03-07 | Perforation | 585.00 | 586.00 | 13 |
2011-03-07 | Perforation | 675.00 | 677.00 | 13 |
2011-03-07 | Perforation | 440.00 | 442.00 | 13 |
2011-03-07 | Perforation | 500.00 | 502.00 | 13 |
2011-03-07 | Perforation | 522.00 | 524.00 | 13 |
2011-03-07 | Perforation | 472.90 | 473.40 | 13 |
2011-03-07 | Perforation | 281.00 | 283.00 | 13 |
2011-03-07 | Perforation | 225.00 | 226.00 | 13 |
2011-03-07 | Perforation | 373.00 | 376.00 | 13 |
2011-03-07 | Perforation | 244.00 | 246.00 | 13 |
2011-03-07 | Perforation | 228.00 | 230.00 | 13 |
2011-03-12 | Fracture | 315.90 | 316.40 | 0 |
2011-03-12 | Fracture | 309.90 | 310.40 | 0 |
2011-03-12 | Fracture | 432.00 | 434.00 | 0 |
2011-03-12 | Fracture | 210.60 | 211.60 | 0 |
2011-03-12 | Fracture | 330.10 | 337.90 | 0 |
2011-03-07 | Perforation | 478.50 | 479.50 | 13 |
2011-03-12 | Fracture | 586.30 | 587.30 | 0 |
2011-03-12 | Fracture | 534.90 | 577.00 | 0 |
2011-03-12 | Fracture | 378.00 | 378.50 | 0 |
2011-03-12 | Fracture | 449.30 | 499.10 | 0 |
2011-03-12 | Fracture | 605.20 | 605.70 | 0 |
2011-03-12 | Fracture | 350.00 | 376.00 | 0 |
2011-03-12 | Fracture | 409.00 | 423.00 | 0 |
2011-03-12 | Fracture | 313.00 | 314.00 | 0 |
2011-03-12 | Fracture | 325.00 | 328.00 | 0 |
2011-03-12 | Fracture | 440.00 | 442.00 | 0 |
2011-03-07 | Perforation | 479.50 | 480.00 | 13 |
2011-03-12 | Fracture | 675.00 | 677.00 | 0 |
2011-03-12 | Fracture | 225.00 | 309.00 | 0 |
2011-03-12 | Fracture | 500.00 | 533.00 | 0 |
2011-03-12 | Fracture | 585.00 | 586.00 | 0 |
2011-03-07 | Perforation | 547.60 | 548.10 | 13 |
2011-03-07 | Perforation | 576.50 | 577.00 | 13 |
2011-03-07 | Perforation | 586.30 | 587.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5218 | 0.0 | 0.0 | 0.0 |
2012 | 8763 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 8625 | 0.0 | 0.0 | 0.0 |
2015 | 8614 | 0.0 | 0.0 | 0.0 |
2016 | 8698 | 0.0 | 0.0 | 0.0 |
2017 | 8544 | 0.0 | 0.0 | 0.0 |
2018 | 8638 | 0.0 | 0.0 | 0.0 |
2019 | 8659 | 0.0 | 0.0 | 0.0 |
2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]