If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274250616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.281587,"lon":-113.498534,"icon":""}]} |
Location: 00/16-06-027-25W4/0 | |
Location Alias: 00/16-06-27-25 W4M | |
Location Alias 2: 00/16-06-027-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-6-27-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423053 | |
License Date: 2010-08-30 | |
License Status: Amended | |
Spud Date: 2010-12-11 | |
Final Drill Date: 2010-12-16 | |
Well Total Depth: 940.00 m | |
Surface Hole Latitude: 51.281587 | |
Surface Hole Longitude: -113.498534 |
Date | Event |
---|---|
2010-08-30 | Obtained License |
2010-12-12 | Surface Casing Operation Performed |
2010-12-16 | Finished Drilling |
2010-12-16 | Well Mode changed to Drilled and Cased |
2010-12-17 | Production Casing Operation Performed |
2010-12-17 | Rig Released |
2010-12-20 | Well Log Performed |
2011-01-28 | Perforation Treatment Performed - Jet Perforation |
2011-02-23 | Perforation Treatment Performed - Fractured |
2011-02-26 | Well Fluid changed to Gas |
2011-02-26 | Well Mode changed to Testing |
2011-03-07 | Perforation Treatment Performed - Jet Perforation |
2011-03-11 | Perforation Treatment Performed - Fractured |
2011-04-01 | Well Began Production |
2011-04-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-28 | Perforation | 748.00 | 750.00 | 13 |
2011-03-07 | Perforation | 500.00 | 502.00 | 13 |
2011-03-07 | Perforation | 320.20 | 320.70 | 13 |
2011-03-07 | Perforation | 323.30 | 323.80 | 13 |
2011-03-07 | Perforation | 256.20 | 256.70 | 13 |
2011-03-07 | Perforation | 314.40 | 314.90 | 13 |
2011-03-07 | Perforation | 406.00 | 408.00 | 13 |
2011-03-07 | Perforation | 261.00 | 263.00 | 13 |
2011-03-07 | Perforation | 284.00 | 285.00 | 13 |
2011-03-07 | Perforation | 223.00 | 225.00 | 13 |
2011-03-07 | Perforation | 233.00 | 235.00 | 13 |
2011-01-28 | Perforation | 605.00 | 607.00 | 13 |
2011-03-07 | Perforation | 390.00 | 392.00 | 13 |
2011-03-07 | Perforation | 394.00 | 396.00 | 13 |
2011-03-07 | Perforation | 348.00 | 350.00 | 13 |
2011-03-07 | Perforation | 361.00 | 362.00 | 13 |
2011-03-07 | Perforation | 334.10 | 334.60 | 13 |
2011-03-07 | Perforation | 536.30 | 536.80 | 13 |
2011-03-07 | Perforation | 544.80 | 545.80 | 13 |
2011-03-07 | Perforation | 530.60 | 531.60 | 13 |
2011-03-07 | Perforation | 476.80 | 477.30 | 13 |
2011-03-07 | Perforation | 494.70 | 497.20 | 13 |
2011-01-28 | Perforation | 421.00 | 424.00 | 13 |
2011-03-07 | Perforation | 558.30 | 559.30 | 13 |
2011-03-07 | Perforation | 585.20 | 586.20 | 13 |
2011-03-07 | Perforation | 601.70 | 602.70 | 13 |
2011-03-07 | Perforation | 573.60 | 574.10 | 13 |
2011-03-07 | Perforation | 564.40 | 565.90 | 13 |
2011-03-07 | Perforation | 569.30 | 570.30 | 13 |
2011-03-07 | Perforation | 429.50 | 431.00 | 13 |
2011-03-07 | Perforation | 450.80 | 451.30 | 13 |
2011-03-07 | Perforation | 469.60 | 470.10 | 13 |
2011-03-07 | Perforation | 455.40 | 455.90 | 13 |
2011-02-23 | Fracture | 748.00 | 750.00 | 0 |
2011-03-07 | Perforation | 446.30 | 447.30 | 13 |
2011-03-07 | Perforation | 462.80 | 463.30 | 13 |
2011-03-11 | Fracture | 223.00 | 235.00 | 0 |
2011-03-11 | Fracture | 500.00 | 502.00 | 0 |
2011-03-11 | Fracture | 481.00 | 483.00 | 0 |
2011-03-11 | Fracture | 348.00 | 408.00 | 0 |
2011-03-11 | Fracture | 261.00 | 285.00 | 0 |
2011-03-11 | Fracture | 429.50 | 477.30 | 0 |
2011-03-11 | Fracture | 314.40 | 334.60 | 0 |
2011-03-11 | Fracture | 203.70 | 214.90 | 0 |
2011-02-23 | Fracture | 605.00 | 607.00 | 0 |
2011-03-11 | Fracture | 494.70 | 497.20 | 0 |
2011-03-11 | Fracture | 256.20 | 256.70 | 0 |
2011-03-11 | Fracture | 601.70 | 602.70 | 0 |
2011-03-11 | Fracture | 530.60 | 586.20 | 0 |
2011-02-23 | Fracture | 421.00 | 424.00 | 0 |
2011-03-07 | Perforation | 203.70 | 204.20 | 13 |
2011-03-07 | Perforation | 213.90 | 214.90 | 13 |
2011-03-07 | Perforation | 481.00 | 483.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6590 | 0.0 | 0.0 | 0.0 |
2012 | 8763 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 8626 | 0.0 | 0.0 | 0.0 |
2015 | 8614 | 0.0 | 0.0 | 0.0 |
2016 | 8698 | 0.0 | 0.0 | 0.0 |
2017 | 8544 | 0.0 | 0.0 | 0.0 |
2018 | 8638 | 0.0 | 0.0 | 0.0 |
2019 | 8659 | 0.0 | 0.0 | 0.0 |
2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]