If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274251207002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.291986,"lon":-113.391505,"icon":""}]} |
Location: 00/07-12-027-25W4/2 | |
Location Alias: 00/07-12-27-25 W4M | |
Location Alias 2: 00/07-12-027-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 25 | |
Section: 12 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 7-12-27-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0276992 | |
License Date: 2002-11-29 | |
License Status: Issued | |
Spud Date: 2003-01-18 | |
Final Drill Date: 2003-01-19 | |
Well Total Depth: 700.00 m | |
Surface Hole Latitude: 51.291986 | |
Surface Hole Longitude: -113.391505 |
Date | Event |
---|---|
2002-11-29 | Obtained License |
2003-01-04 | Surface Casing Operation Performed |
2003-01-19 | Finished Drilling |
2003-01-19 | Production Casing Operation Performed |
2003-01-19 | Rig Released |
2003-01-19 | Well Mode changed to Drilled and Cased |
2003-01-29 | Well Log Performed |
2003-02-01 | Perforation Treatment Performed - Jet Perforation |
2003-02-08 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2003-02-09 | Perforation Treatment Performed - Fractured |
2003-02-11 | Well Began Production |
2003-02-11 | Well Fluid changed to Gas |
2003-02-11 | Well Mode changed to Flowing |
2017-01-28 | Perforation Treatment Performed - Jet Perforation |
2017-01-28 | Well Log Performed |
2017-02-03 | Perforation Treatment Performed - Fractured |
2017-03-28 | Well Fluid changed to Gas |
2017-03-28 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-02-01 | Perforation | 604.00 | 607.00 | 17 |
2017-01-28 | Perforation | 381.00 | 382.00 | 13 |
2017-01-28 | Perforation | 387.80 | 389.80 | 13 |
2017-01-28 | Perforation | 393.20 | 394.20 | 13 |
2017-01-28 | Perforation | 437.10 | 438.10 | 13 |
2017-01-28 | Perforation | 444.50 | 447.50 | 13 |
2017-01-28 | Perforation | 448.50 | 450.50 | 13 |
2017-01-28 | Perforation | 494.00 | 495.00 | 13 |
2017-01-28 | Perforation | 500.30 | 501.30 | 13 |
2017-01-28 | Perforation | 509.20 | 510.20 | 13 |
2017-01-28 | Perforation | 516.60 | 517.60 | 13 |
2003-02-01 | Perforation | 472.00 | 478.50 | 17 |
2017-01-28 | Perforation | 522.40 | 523.40 | 13 |
2017-01-28 | Perforation | 526.90 | 527.90 | 13 |
2017-01-28 | Perforation | 557.00 | 558.00 | 13 |
2017-01-28 | Perforation | 568.20 | 569.20 | 13 |
2017-02-03 | Fracture | 265.00 | 267.50 | 0 |
2017-02-03 | Fracture | 277.50 | 280.00 | 0 |
2017-02-03 | Fracture | 306.00 | 308.00 | 0 |
2017-02-03 | Fracture | 369.00 | 371.00 | 0 |
2017-02-03 | Fracture | 377.70 | 378.70 | 0 |
2017-02-03 | Fracture | 381.00 | 382.00 | 0 |
2003-02-08 | Bridge Plug, No Cement | 595.00 | 596.00 | 0 |
2017-02-03 | Fracture | 387.80 | 389.80 | 0 |
2017-02-03 | Fracture | 393.20 | 394.20 | 0 |
2017-02-03 | Fracture | 437.10 | 438.10 | 0 |
2017-02-03 | Fracture | 444.50 | 447.50 | 0 |
2017-02-03 | Fracture | 448.50 | 450.50 | 0 |
2017-02-03 | Fracture | 494.00 | 495.00 | 0 |
2017-02-03 | Fracture | 500.30 | 501.30 | 0 |
2017-02-03 | Fracture | 509.20 | 510.20 | 0 |
2017-02-03 | Fracture | 516.60 | 517.60 | 0 |
2017-02-03 | Fracture | 522.40 | 523.40 | 0 |
2003-02-09 | Fracture | 472.00 | 478.50 | 0 |
2017-02-03 | Fracture | 526.90 | 527.90 | 0 |
2017-02-03 | Fracture | 557.00 | 558.00 | 0 |
2017-02-03 | Fracture | 568.20 | 569.20 | 0 |
2017-01-28 | Perforation | 265.00 | 267.50 | 13 |
2017-01-28 | Perforation | 277.50 | 280.00 | 13 |
2017-01-28 | Perforation | 306.00 | 308.00 | 13 |
2017-01-28 | Perforation | 369.00 | 371.00 | 13 |
2017-01-28 | Perforation | 377.70 | 378.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 7749 | 0.0 | 0.0 | 0.0 |
2004 | 8764 | 0.0 | 0.0 | 0.0 |
2005 | 8632 | 0.0 | 0.0 | 0.0 |
2006 | 8366 | 0.0 | 0.0 | 0.0 |
2007 | 8406 | 0.0 | 0.0 | 0.0 |
2008 | 8577 | 0.0 | 0.0 | 0.0 |
2009 | 8402 | 0.0 | 0.0 | 0.0 |
2010 | 8398 | 0.0 | 0.0 | 0.0 |
2011 | 8388 | 0.0 | 0.0 | 0.0 |
2012 | 4176 | 0.0 | 0.0 | 0.0 |
2013 | 8638 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8255 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]