X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274252411020

Well Details

Well ID: 0274252411020
Loading map...
Location: 02/11-24-027-25W4/0
Location Alias: 02/11-24-27-25 W4M
Location Alias 2: 02/11-24-027-25 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 25
Section: 24
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 11-24-27-25
Operator Name: Ember Resources Inc.
License Number: 0425779
License Date: 2010-11-12
License Status: Issued
Spud Date: 2011-01-23
Final Drill Date: 2011-01-30
Well Total Depth: 929.00 m
Surface Hole Latitude: 51.323702
Surface Hole Longitude: -113.392920

For data sources see[1][2]

Well History

Date Event
2010-11-12 Obtained License
2011-01-24 Surface Casing Operation Performed
2011-01-30 Finished Drilling
2011-01-30 Production Casing Operation Performed
2011-01-30 Well Mode changed to Drilled and Cased
2011-01-31 Rig Released
2011-02-03 Well Log Performed
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-07-25 Perforation Treatment Performed - Fractured
2011-08-25 Perforation Treatment Performed - Jet Perforation
2011-09-08 Perforation Treatment Performed - Fractured
2011-10-17 Well Began Production
2011-10-17 Well Fluid changed to Coalbed Methane-Coals and Other
2011-10-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-23 Perforation 254.00 256.00 13
2011-08-25 Perforation 262.10 262.60 13
2011-08-25 Perforation 268.20 269.20 13
2011-08-25 Perforation 291.00 293.00 13
2011-08-25 Perforation 355.00 357.00 13
2011-08-25 Perforation 368.10 369.10 13
2011-08-25 Perforation 372.20 372.70 13
2011-08-25 Perforation 375.10 375.60 13
2011-08-25 Perforation 389.20 390.20 13
2011-08-25 Perforation 393.00 394.00 13
2011-08-25 Perforation 395.50 396.00 13
2011-02-23 Perforation 332.00 334.00 13
2011-08-25 Perforation 398.20 398.70 13
2011-08-25 Perforation 405.00 407.00 13
2011-08-25 Perforation 415.20 415.70 13
2011-08-25 Perforation 418.20 419.70 13
2011-08-25 Perforation 428.00 428.50 13
2011-08-25 Perforation 438.40 441.40 13
2011-08-25 Perforation 443.50 444.50 13
2011-08-25 Perforation 467.00 469.00 13
2011-08-25 Perforation 471.00 473.00 13
2011-08-25 Perforation 474.30 474.80 13
2011-02-23 Perforation 350.00 352.00 13
2011-08-25 Perforation 481.10 481.60 13
2011-08-25 Perforation 487.90 488.90 13
2011-08-25 Perforation 495.80 497.30 13
2011-08-25 Perforation 503.10 504.10 13
2011-08-25 Perforation 509.70 510.70 13
2011-08-25 Perforation 514.20 514.70 13
2011-08-25 Perforation 520.10 520.60 13
2011-08-25 Perforation 543.60 544.10 13
2011-08-25 Perforation 554.80 555.30 13
2011-08-25 Perforation 620.00 622.00 13
2011-02-23 Perforation 674.50 675.50 13
2011-09-08 Fracture 246.30 622.00 0
2011-07-25 Fracture 332.00 334.00 0
2011-07-25 Fracture 350.00 352.00 0
2011-08-25 Perforation 188.00 190.00 13
2011-08-25 Perforation 197.00 200.00 13
2011-08-25 Perforation 246.30 247.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1803 0.0 0.0 0.0
2012 4964 0.0 0.0 0.0
2013 8733 0.0 0.0 0.0
2014 8718 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8474 0.0 0.0 0.0
2020 2075 0.0 0.0 0.0

For data sources see[5]

References