If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274252609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.339287,"lon":-113.406076,"icon":""}]} |
Location: 00/09-26-027-25W4/0 | |
Location Alias: 00/09-26-27-25 W4M | |
Location Alias 2: 00/09-26-027-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 25 | |
Section: 26 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-26-27-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0223548 | |
License Date: 1999-06-10 | |
License Status: Issued | |
Spud Date: 1999-06-12 | |
Final Drill Date: 1999-06-20 | |
Well Total Depth: 938.00 m | |
Surface Hole Latitude: 51.339287 | |
Surface Hole Longitude: -113.406076 |
Date | Event |
---|---|
1999-06-10 | Obtained License |
1999-06-12 | Surface Casing Operation Performed |
1999-06-20 | Finished Drilling |
1999-06-21 | Production Casing Operation Performed |
1999-06-21 | Rig Released |
1999-06-21 | Well Mode changed to Drilled and Cased |
1999-07-11 | Well Log Performed |
1999-07-23 | Perforation Treatment Performed - Jet Perforation |
1999-07-23 | Well Log Performed |
1999-08-09 | Perforation Treatment Performed - Fractured |
1999-08-24 | Well Began Production |
1999-08-24 | Well Fluid changed to Gas |
1999-08-24 | Well Mode changed to Flowing |
1999-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-16 | Perforation Treatment Performed - Jet Perforation |
1999-10-16 | Plug Back Performed |
1999-10-16 | Well Fluid changed to Gas |
1999-10-16 | Well Log Performed |
1999-10-16 | Well Mode changed to Abandoned Zone |
1999-10-21 | Perforation Treatment Performed - Jet Perforation |
1999-10-21 | Well Log Performed |
2000-03-18 | Perforation Treatment Performed - Jet Perforation |
2000-03-18 | Well Log Performed |
2000-08-01 | Perforation Treatment Performed - Fractured |
2000-08-10 | Perforation Treatment Performed - Jet Perforation |
2000-08-10 | Well Log Performed |
2000-08-23 | Perforation Treatment Performed - Fractured |
2001-02-28 | Well Log Performed |
2019-11-16 | Perforation Treatment Performed - Jet Perforation |
2019-11-16 | Well Log Performed |
2019-12-10 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-07-23 | Perforation | 837.50 | 839.50 | 13 |
2019-11-16 | Perforation | 198.40 | 199.40 | 13 |
2019-11-16 | Perforation | 253.20 | 254.20 | 13 |
2019-11-16 | Perforation | 275.20 | 276.20 | 13 |
2019-11-16 | Perforation | 290.70 | 291.70 | 13 |
2019-11-16 | Perforation | 293.60 | 296.10 | 13 |
2019-11-16 | Perforation | 317.50 | 319.00 | 13 |
2019-11-16 | Perforation | 363.30 | 364.30 | 13 |
2019-11-16 | Perforation | 373.60 | 377.10 | 13 |
2019-11-16 | Perforation | 380.00 | 381.50 | 13 |
2019-11-16 | Perforation | 383.90 | 384.90 | 13 |
1999-08-09 | Fracture | 837.50 | 839.50 | 0 |
2019-11-16 | Perforation | 386.70 | 387.70 | 13 |
2019-11-16 | Perforation | 401.50 | 402.50 | 13 |
2019-11-16 | Perforation | 407.30 | 408.30 | 13 |
2019-11-16 | Perforation | 409.90 | 410.90 | 13 |
2019-11-16 | Perforation | 428.00 | 429.00 | 13 |
2019-11-16 | Perforation | 432.40 | 433.90 | 13 |
2019-11-16 | Perforation | 438.60 | 439.60 | 13 |
2019-11-16 | Perforation | 451.50 | 454.50 | 13 |
2019-11-16 | Perforation | 457.90 | 459.90 | 13 |
2019-11-16 | Perforation | 486.90 | 487.90 | 13 |
1999-10-16 | Packing Device Capped w/Cement | 827.00 | 835.00 | 0 |
2019-11-16 | Perforation | 494.20 | 495.20 | 13 |
2019-11-16 | Perforation | 500.00 | 501.00 | 13 |
2019-11-16 | Perforation | 509.50 | 511.00 | 13 |
2019-11-16 | Perforation | 517.10 | 518.10 | 13 |
2019-11-16 | Perforation | 523.90 | 524.90 | 13 |
2019-11-16 | Perforation | 528.10 | 529.10 | 13 |
2019-11-16 | Perforation | 537.40 | 538.40 | 13 |
2019-11-16 | Perforation | 555.50 | 556.50 | 13 |
2019-11-16 | Perforation | 562.30 | 564.80 | 13 |
2019-11-16 | Perforation | 566.60 | 567.60 | 13 |
1999-10-16 | Perforation | 632.50 | 633.50 | 13 |
2019-11-16 | Perforation | 691.10 | 692.10 | 13 |
2019-12-10 | Fracture | 198.40 | 199.40 | 0 |
2019-12-10 | Fracture | 253.20 | 254.20 | 0 |
2019-12-10 | Fracture | 275.20 | 276.20 | 0 |
2019-12-10 | Fracture | 290.70 | 291.70 | 0 |
2019-12-10 | Fracture | 293.60 | 296.10 | 0 |
2019-12-10 | Fracture | 317.50 | 319.00 | 0 |
2019-12-10 | Fracture | 363.30 | 364.30 | 0 |
2019-12-10 | Fracture | 373.60 | 377.10 | 0 |
2019-12-10 | Fracture | 383.90 | 384.90 | 0 |
1999-10-21 | Perforation | 606.00 | 609.00 | 13 |
2019-12-10 | Fracture | 386.70 | 387.70 | 0 |
2019-12-10 | Fracture | 401.50 | 402.50 | 0 |
2019-12-10 | Fracture | 407.30 | 408.30 | 0 |
2019-12-10 | Fracture | 409.90 | 410.90 | 0 |
2019-12-10 | Fracture | 428.00 | 429.00 | 0 |
2019-12-10 | Fracture | 432.40 | 433.90 | 0 |
2019-12-10 | Fracture | 438.60 | 439.60 | 0 |
2019-12-10 | Fracture | 451.50 | 454.50 | 0 |
2019-12-10 | Fracture | 457.90 | 459.90 | 0 |
2019-12-10 | Fracture | 500.00 | 501.00 | 0 |
2000-03-18 | Perforation | 615.50 | 619.50 | 13 |
2019-12-10 | Fracture | 509.50 | 511.00 | 0 |
2019-12-10 | Fracture | 517.10 | 518.10 | 0 |
2019-12-10 | Fracture | 523.90 | 524.90 | 0 |
2019-12-10 | Fracture | 528.10 | 529.10 | 0 |
2019-12-10 | Fracture | 537.40 | 538.40 | 0 |
2019-12-10 | Fracture | 555.50 | 556.50 | 0 |
2019-12-10 | Fracture | 562.30 | 564.80 | 0 |
2019-12-10 | Fracture | 566.60 | 567.60 | 0 |
2019-12-10 | Fracture | 691.10 | 692.10 | 0 |
2000-08-01 | Fracture | 606.00 | 633.50 | 0 |
2000-08-10 | Perforation | 481.00 | 485.00 | 17 |
2000-08-23 | Fracture | 481.00 | 485.00 | 0 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-12-10 | 2019-12-10 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-12-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]