X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274253204002

Well Details

Well ID: 0274253204002
Loading map...
Location: 00/04-32-027-25W4/2
Location Alias: 00/04-32-27-25 W4M
Location Alias 2: 00/04-32-027-25 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 25
Section: 32
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 4-32-27-25
Operator Name: Ember Resources Inc.
License Number: 0184904
License Date: 1996-01-23
License Status: Abandoned
Spud Date: 1996-02-02
Final Drill Date: 1996-02-04
Well Total Depth: 1001.00 m
Surface Hole Latitude: 51.346908
Surface Hole Longitude: -113.496870

For data sources see[1][2]

Well History

Date Event
1996-01-23 Obtained License
1996-02-02 Surface Casing Operation Performed
1996-02-04 Finished Drilling
1996-02-04 Well Mode changed to Drilled and Cased
1996-02-05 Production Casing Operation Performed
1996-02-05 Rig Released
1996-02-09 Well Log Performed
1996-03-06 Perforation Treatment Performed - Jet Perforation
1996-03-07 Perforation Treatment Performed - Fractured
1996-03-09 Perforation Treatment Performed - Jet Perforation
1996-03-10 Perforation Treatment Performed - Fractured
1998-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-18 Plug Back Performed
1998-07-18 Well Log Performed
1998-07-27 Perforation Treatment Performed - Jet Perforation
1998-08-13 Perforation Treatment Performed - Fractured
1999-04-23 Well Began Production
1999-04-23 Well Fluid changed to Gas
1999-04-23 Well Mode changed to Flowing
1999-04-24 Well Fluid changed to Gas
1999-04-24 Well Mode changed to Flowing
2006-01-26 Well Log Performed
2008-01-08 Perforation Treatment Performed - Jet Perforation
2008-01-14 Perforation Treatment Performed - Fractured
2008-02-21 Well Fluid changed to Coalbed Methane-Coals and Other
2008-02-21 Well Mode changed to Flowing
2016-09-15 Well Log Performed
2020-02-21 Perforation Treatment Performed - Jet Perforation
2020-02-21 Well Log Performed
2020-03-02 Perforation Treatment Performed - Cement Plug
2020-03-02 Perforation Treatment Performed - Remedial Casing
2020-03-02 Plug Back Performed
2020-03-02 Well Fluid changed to Gas
2020-03-02 Well Mode changed to Abandoned Zone
2020-03-19 Well Abandoned
2020-03-19 Well Fluid changed to Gas
2020-03-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-06 Perforation 860.00 863.00 7
2008-01-08 Perforation 612.20 612.70 13
2008-01-08 Perforation 607.70 608.20 13
2008-01-08 Perforation 601.70 602.20 13
2008-01-08 Perforation 598.40 598.90 13
2008-01-08 Perforation 585.10 585.60 13
2008-01-08 Perforation 574.90 575.40 13
2008-01-08 Perforation 571.80 573.80 13
2008-01-08 Perforation 560.10 561.10 13
2008-01-08 Perforation 548.30 549.30 13
2008-01-08 Perforation 542.40 542.90 13
1996-03-07 Fracture 860.00 863.00 0
2008-01-08 Perforation 536.00 537.00 13
2008-01-08 Perforation 533.80 534.30 13
2008-01-08 Perforation 503.70 506.70 13
2008-01-08 Perforation 482.90 483.90 13
2008-01-08 Perforation 475.90 476.90 13
2008-01-08 Perforation 456.90 457.40 13
2008-01-08 Perforation 446.50 447.50 13
2008-01-08 Perforation 429.50 430.00 13
2008-01-08 Perforation 425.90 426.40 13
2008-01-14 Fracture 425.90 612.70 0
1996-03-09 Perforation 800.00 803.00 7
2020-02-21 Perforation 54.00 55.00 13
2020-02-21 Perforation 107.00 108.00 13
2020-02-21 Perforation 161.00 162.00 13
2020-02-21 Perforation 172.00 173.00 13
2020-02-21 Perforation 193.50 194.50 13
2020-02-21 Perforation 206.00 207.00 13
2020-02-21 Perforation 242.50 243.50 13
2020-02-21 Perforation 300.80 301.80 13
2020-03-02 Remedial Casing Cementing 54.00 301.80 0
2020-03-02 Cement Plug 15.00 664.80 0
1996-03-09 Perforation 818.00 821.00 7
1996-03-10 Fracture 800.00 821.00 0
1998-07-18 Packing Device Capped w/Cement 840.00 848.00 0
1998-07-18 Packing Device Capped w/Cement 779.00 787.00 0
1998-07-27 Perforation 668.00 672.00 14
1998-08-13 Fracture 668.00 672.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5884 0.0 0.0 0.0
2000 8320 0.0 0.0 0.0
2001 8529 0.0 0.0 0.0
2002 8630 0.0 0.0 0.0
2003 8748 0.0 0.0 0.0
2004 8761 0.0 0.0 0.0
2005 7472 0.0 0.0 0.0
2006 4411 0.0 0.0 0.0
2007 8748 0.0 0.0 0.0
2008 7560 0.0 0.0 0.0
2009 8017 0.0 0.0 0.0
2010 8758 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 4824 0.0 0.0 0.0
2013 8638 0.0 0.0 0.0
2014 8606 0.0 0.0 0.0
2015 8026 0.0 0.0 0.0
2016 7343 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8084 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-15 No Incident Encountered 0.00 0.00
2020-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References