If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274253507020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.347777,"lon":-113.415072,"icon":""}]} |
Location: 02/07-35-027-25W4/0 | |
Location Alias: 02/07-35-27-25 W4M | |
Location Alias 2: 02/07-35-027-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 25 | |
Section: 35 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 7-35-27-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0279474 | |
License Date: 2002-12-23 | |
License Status: Issued | |
Spud Date: 2003-01-15 | |
Final Drill Date: 2003-01-16 | |
Well Total Depth: 704.00 m | |
Surface Hole Latitude: 51.347777 | |
Surface Hole Longitude: -113.415072 |
Date | Event |
---|---|
2002-12-23 | Obtained License |
2003-01-02 | Surface Casing Operation Performed |
2003-01-16 | Finished Drilling |
2003-01-16 | Production Casing Operation Performed |
2003-01-16 | Rig Released |
2003-01-16 | Well Mode changed to Drilled and Cased |
2003-01-28 | Well Log Performed |
2003-01-31 | Perforation Treatment Performed - Jet Perforation |
2003-02-07 | Perforation Treatment Performed - Fractured |
2011-08-06 | Perforation Treatment Performed - Jet Perforation |
2011-08-12 | Perforation Treatment Performed - Fractured |
2011-09-21 | Well Began Production |
2011-09-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-09-21 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-01-31 | Perforation | 636.00 | 638.50 | 17 |
2011-08-06 | Perforation | 299.80 | 300.80 | 13 |
2011-08-06 | Perforation | 315.00 | 317.00 | 13 |
2011-08-06 | Perforation | 319.50 | 322.50 | 13 |
2011-08-06 | Perforation | 346.10 | 346.60 | 13 |
2011-08-06 | Perforation | 359.50 | 362.00 | 13 |
2011-08-06 | Perforation | 365.50 | 367.50 | 13 |
2011-08-06 | Perforation | 394.50 | 395.00 | 13 |
2011-08-06 | Perforation | 398.50 | 400.50 | 13 |
2011-08-06 | Perforation | 411.00 | 412.00 | 13 |
2011-08-06 | Perforation | 414.60 | 416.10 | 13 |
2003-01-31 | Perforation | 496.00 | 501.00 | 17 |
2011-08-06 | Perforation | 420.10 | 421.10 | 13 |
2011-08-06 | Perforation | 424.80 | 425.80 | 13 |
2011-08-06 | Perforation | 443.60 | 444.10 | 13 |
2011-08-06 | Perforation | 448.60 | 450.10 | 13 |
2011-08-06 | Perforation | 453.50 | 454.00 | 13 |
2011-08-06 | Perforation | 463.40 | 464.90 | 13 |
2011-08-06 | Perforation | 468.10 | 469.60 | 13 |
2011-08-06 | Perforation | 507.60 | 508.60 | 13 |
2011-08-06 | Perforation | 513.50 | 514.00 | 13 |
2011-08-06 | Perforation | 524.60 | 525.60 | 13 |
2003-02-07 | Fracture | 636.00 | 638.50 | 0 |
2011-08-06 | Perforation | 532.10 | 533.10 | 13 |
2011-08-06 | Perforation | 539.70 | 540.70 | 13 |
2011-08-06 | Perforation | 542.70 | 543.20 | 13 |
2011-08-06 | Perforation | 549.40 | 549.90 | 13 |
2011-08-06 | Perforation | 552.00 | 554.00 | 13 |
2011-08-06 | Perforation | 570.00 | 570.50 | 13 |
2011-08-06 | Perforation | 578.70 | 579.20 | 13 |
2011-08-12 | Fracture | 214.00 | 579.20 | 0 |
2003-02-07 | Fracture | 496.00 | 501.00 | 0 |
2011-08-06 | Perforation | 214.00 | 214.50 | 13 |
2011-08-06 | Perforation | 236.00 | 237.00 | 13 |
2011-08-06 | Perforation | 269.40 | 270.40 | 13 |
2011-08-06 | Perforation | 284.00 | 286.00 | 13 |
2011-08-06 | Perforation | 290.70 | 291.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2208 | 0.0 | 0.0 | 0.0 |
2012 | 4680 | 0.0 | 0.0 | 0.0 |
2013 | 8638 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]