X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274260503000

Well Details

Well ID: 0274260503000
Loading map...
Location: 00/03-05-027-26W4/0
Location Alias: 00/03-05-27-26 W4M
Location Alias 2: 00/03-05-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 05
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 3-5-27-26
Operator Name: Ember Resources Inc.
License Number: 0260853
License Date: 2001-10-22
License Status: Issued
Spud Date: 2001-10-25
Final Drill Date: 2001-10-26
Well Total Depth: 820.00 m
Surface Hole Latitude: 51.271513
Surface Hole Longitude: -113.629942

For data sources see[1][2]

Well History

Date Event
2001-10-22 Obtained License
2001-10-25 Surface Casing Operation Performed
2001-10-26 Finished Drilling
2001-10-26 Production Casing Operation Performed
2001-10-26 Rig Released
2001-10-26 Well Mode changed to Drilled and Cased
2001-11-02 Well Log Performed
2001-11-16 Perforation Treatment Performed - Jet Perforation
2001-11-16 Well Log Performed
2001-11-26 Perforation Treatment Performed - Fractured
2002-01-14 Well Began Production
2002-01-14 Well Fluid changed to Gas
2002-01-14 Well Mode changed to Flowing
2007-06-30 Perforation Treatment Performed - Jet Perforation
2007-07-20 Perforation Treatment Performed - Fractured
2007-07-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-11-16 Perforation 758.00 761.50 17
2001-11-26 Fracture 214.00 218.50 0
2007-06-30 Perforation 672.20 672.70 13
2007-06-30 Perforation 647.00 647.50 13
2007-06-30 Perforation 638.10 638.60 13
2007-06-30 Perforation 635.40 635.90 13
2007-06-30 Perforation 626.70 627.20 13
2007-06-30 Perforation 612.00 612.50 13
2007-06-30 Perforation 600.30 601.30 13
2007-06-30 Perforation 593.10 593.60 13
2007-06-30 Perforation 574.30 575.30 13
2001-11-16 Perforation 746.00 750.00 17
2007-06-30 Perforation 566.00 568.00 13
2007-06-30 Perforation 548.80 549.30 13
2007-06-30 Perforation 541.20 541.70 13
2007-06-30 Perforation 524.40 524.90 13
2007-06-30 Perforation 514.30 515.30 13
2007-06-30 Perforation 504.80 505.30 13
2007-06-30 Perforation 501.20 501.70 13
2007-06-30 Perforation 390.40 390.90 13
2007-06-30 Perforation 385.80 386.30 13
2007-06-30 Perforation 377.20 377.70 13
2001-11-16 Perforation 619.00 622.00 17
2007-06-30 Perforation 370.30 370.80 13
2007-06-30 Perforation 369.00 369.50 13
2007-06-30 Perforation 310.80 311.30 13
2007-07-20 Fracture 310.80 672.70 0
2001-11-16 Perforation 613.50 616.00 17
2001-11-16 Perforation 277.00 278.50 17
2001-11-16 Perforation 214.00 218.50 17
2001-11-26 Fracture 758.00 761.50 0
2001-11-26 Fracture 746.00 750.00 0
2001-11-26 Fracture 613.50 622.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 8278 0.0 0.0 0.0
2003 8713 0.0 0.0 0.0
2004 8739 0.0 0.0 0.0
2005 8075 0.0 0.0 0.0
2006 8625 0.0 0.0 0.0
2007 3549 0.0 0.0 0.0

For data sources see[5]

References