If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274260602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.275942,"lon":-113.63163,"icon":""}]} |
Location: 00/02-06-027-26W4/0 | |
Location Alias: 00/02-06-27-26 W4M | |
Location Alias 2: 00/02-06-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 2-6-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438277 | |
License Date: 2011-11-01 | |
License Status: Issued | |
Spud Date: 2012-01-19 | |
Final Drill Date: 2012-01-20 | |
Well Total Depth: 1442.00 m | |
Surface Hole Latitude: 51.275942 | |
Surface Hole Longitude: -113.631630 |
Date | Event |
---|---|
2011-11-01 | Obtained License |
2012-01-19 | Direction Drilling Operation Performed - Deviate |
2012-01-19 | Surface Casing Operation Performed |
2012-01-20 | Finished Drilling |
2012-01-20 | Production Casing Operation Performed |
2012-01-20 | Well Mode changed to Drilled and Cased |
2012-01-21 | Rig Released |
2012-01-25 | Well Log Performed |
2012-02-17 | Perforation Treatment Performed - Jet Perforation |
2012-02-19 | Perforation Treatment Performed - Fractured |
2012-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-24 | Well Mode changed to Testing |
2012-03-02 | Perforation Treatment Performed - Jet Perforation |
2012-03-04 | Perforation Treatment Performed - Fractured |
2012-06-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-06-06 | Well Mode changed to Test Completed |
2013-04-27 | Well Began Production |
2013-04-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-04-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-19 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-19 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-17 | Perforation | 789.00 | 792.00 | 13 |
2012-03-02 | Perforation | 564.80 | 565.30 | 13 |
2012-03-02 | Perforation | 629.30 | 629.80 | 13 |
2012-03-02 | Perforation | 650.00 | 652.50 | 13 |
2012-03-02 | Perforation | 681.00 | 684.00 | 13 |
2012-03-02 | Perforation | 702.20 | 702.70 | 13 |
2012-03-02 | Perforation | 704.00 | 704.50 | 13 |
2012-03-02 | Perforation | 708.60 | 709.10 | 13 |
2012-03-02 | Perforation | 712.70 | 713.20 | 13 |
2012-03-02 | Perforation | 723.10 | 725.10 | 13 |
2012-03-02 | Perforation | 759.40 | 759.90 | 13 |
2012-02-19 | Fracture | 789.00 | 792.00 | 0 |
2012-03-02 | Perforation | 768.30 | 768.80 | 13 |
2012-03-02 | Perforation | 801.50 | 803.50 | 13 |
2012-03-02 | Perforation | 816.00 | 819.00 | 13 |
2012-03-02 | Perforation | 847.50 | 848.50 | 13 |
2012-03-02 | Perforation | 853.80 | 855.80 | 13 |
2012-03-02 | Perforation | 863.10 | 863.60 | 13 |
2012-03-02 | Perforation | 872.20 | 872.70 | 13 |
2012-03-02 | Perforation | 887.70 | 889.70 | 13 |
2012-03-02 | Perforation | 900.60 | 902.10 | 13 |
2012-03-02 | Perforation | 906.30 | 906.80 | 13 |
2012-03-02 | Perforation | 343.60 | 344.10 | 13 |
2012-03-02 | Perforation | 908.50 | 909.00 | 13 |
2012-03-02 | Perforation | 919.10 | 920.10 | 13 |
2012-03-02 | Perforation | 932.60 | 933.10 | 13 |
2012-03-02 | Perforation | 936.40 | 937.40 | 13 |
2012-03-02 | Perforation | 955.10 | 955.60 | 13 |
2012-03-02 | Perforation | 964.20 | 965.20 | 13 |
2012-03-02 | Perforation | 973.20 | 974.20 | 13 |
2012-03-04 | Fracture | 343.60 | 974.20 | 0 |
2012-03-02 | Perforation | 375.30 | 376.30 | 13 |
2012-03-02 | Perforation | 442.40 | 442.90 | 13 |
2012-03-02 | Perforation | 521.10 | 522.10 | 13 |
2012-03-02 | Perforation | 524.50 | 525.00 | 13 |
2012-03-02 | Perforation | 533.30 | 534.30 | 13 |
2012-03-02 | Perforation | 555.80 | 556.30 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 52 | 0.0 | 0.0 | 0.0 |
2013 | 5971 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8652 | 0.0 | 0.0 | 0.0 |
2017 | 8638 | 0.0 | 0.0 | 0.0 |
2018 | 8317 | 0.0 | 0.0 | 0.0 |
2019 | 7970 | 0.0 | 0.0 | 0.0 |
2020 | 2038 | 0.0 | 0.0 | 0.0 |
For data sources see[7]