If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274260606002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.277315,"lon":-113.663306,"icon":""}]} |
Location: 00/06-06-027-26W4/2 | |
Location Alias: 00/06-06-27-26 W4M | |
Location Alias 2: 00/06-06-027-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 6-6-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0406341 | |
License Date: 2008-12-16 | |
License Status: Issued | |
Spud Date: 2009-01-06 | |
Final Drill Date: 2009-01-07 | |
Well Total Depth: 1170.00 m | |
Surface Hole Latitude: 51.277315 | |
Surface Hole Longitude: -113.663306 |
Date | Event |
---|---|
2008-12-16 | Obtained License |
2009-01-06 | Direction Drilling Operation Performed - Deviate |
2009-01-06 | Surface Casing Operation Performed |
2009-01-07 | Finished Drilling |
2009-01-07 | Well Mode changed to Drilled and Cased |
2009-01-09 | Production Casing Operation Performed |
2009-01-10 | Rig Released |
2009-01-17 | Well Log Performed |
2009-01-29 | Perforation Treatment Performed - Jet Perforation |
2009-02-12 | Perforation Treatment Performed - Fractured |
2009-03-02 | Perforation Treatment Performed - Jet Perforation |
2009-03-12 | Perforation Treatment Performed - Fractured |
2009-03-26 | Well Began Production |
2009-03-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-26 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-06 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-29 | Perforation | 707.00 | 710.00 | 13 |
2009-03-02 | Perforation | 919.20 | 921.20 | 14 |
2009-03-02 | Perforation | 903.40 | 903.90 | 14 |
2009-03-02 | Perforation | 891.30 | 891.80 | 14 |
2009-03-02 | Perforation | 884.00 | 885.00 | 14 |
2009-03-02 | Perforation | 878.30 | 878.80 | 14 |
2009-03-02 | Perforation | 848.40 | 849.40 | 14 |
2009-03-02 | Perforation | 838.30 | 839.30 | 14 |
2009-03-02 | Perforation | 835.90 | 836.90 | 14 |
2009-03-02 | Perforation | 806.90 | 807.40 | 14 |
2009-03-02 | Perforation | 796.70 | 797.20 | 14 |
2009-02-12 | Fracture | 707.00 | 710.00 | 0 |
2009-03-02 | Perforation | 752.80 | 753.80 | 14 |
2009-03-02 | Perforation | 751.30 | 752.30 | 14 |
2009-03-02 | Perforation | 742.50 | 743.00 | 14 |
2009-03-02 | Perforation | 701.40 | 701.90 | 14 |
2009-03-02 | Perforation | 579.50 | 580.00 | 14 |
2009-03-02 | Perforation | 566.00 | 566.50 | 14 |
2009-03-02 | Perforation | 555.30 | 556.30 | 14 |
2009-03-02 | Perforation | 542.70 | 543.70 | 14 |
2009-03-02 | Perforation | 463.30 | 463.80 | 14 |
2009-03-12 | Fracture | 463.30 | 1008.60 | 0 |
2009-03-02 | Perforation | 1008.10 | 1008.60 | 14 |
2009-03-02 | Perforation | 970.30 | 970.80 | 14 |
2009-03-02 | Perforation | 998.80 | 999.30 | 14 |
2009-03-02 | Perforation | 951.40 | 952.40 | 14 |
2009-03-02 | Perforation | 941.70 | 942.20 | 14 |
2009-03-02 | Perforation | 938.90 | 939.40 | 14 |
2009-03-02 | Perforation | 933.00 | 934.00 | 14 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6720 | 0.0 | 0.0 | 0.0 |
2010 | 8578 | 0.0 | 0.0 | 0.0 |
2011 | 8671 | 0.0 | 0.0 | 0.0 |
2012 | 4704 | 0.0 | 0.0 | 0.0 |
2013 | 8638 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8642 | 0.0 | 0.0 | 0.0 |
2016 | 8658 | 0.0 | 0.0 | 0.0 |
2017 | 8461 | 0.0 | 0.0 | 0.0 |
2018 | 8502 | 0.0 | 0.0 | 0.0 |
2019 | 7649 | 0.0 | 0.0 | 0.0 |
2020 | 2083 | 0.0 | 0.0 | 0.0 |
For data sources see[6]