X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274260903000

Well Details

Well ID: 0274260903000
Loading map...
Location: 00/03-09-027-26W4/0
Location Alias: 00/03-09-27-26 W4M
Location Alias 2: 00/03-09-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 3-9-27-26
Operator Name: Ember Resources Inc.
License Number: 0238990
License Date: 2000-06-23
License Status: Issued
Spud Date: 2000-11-21
Final Drill Date: 2000-11-27
Well Total Depth: 1061.00 m
Surface Hole Latitude: 51.285548
Surface Hole Longitude: -113.606141

For data sources see[1][2]

Well History

Date Event
2000-06-23 Obtained License
2000-11-27 Finished Drilling
2000-11-27 Well Log Performed
2000-11-28 Conductor Casing Operation Performed
2000-11-28 Production Casing Operation Performed
2000-11-28 Rig Released
2000-11-28 Well Mode changed to Drilled and Cased
2000-12-05 Well Log Performed
2001-01-09 Perforation Treatment Performed - Jet Perforation
2002-09-20 Perforation Treatment Performed - Fractured
2002-10-03 Well Began Production
2002-10-03 Well Fluid changed to Gas
2002-10-03 Well Mode changed to Flowing
2004-08-10 Perforation Treatment Performed - Jet Perforation
2004-08-18 Perforation Treatment Performed - Fractured
2006-05-01 Well Fluid changed to Gas
2006-05-01 Well Mode changed to Suspended
2017-04-24 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-09 Perforation 780.00 783.00 7
2004-08-10 Perforation 362.80 363.80 13
2004-08-10 Perforation 370.80 371.80 13
2004-08-10 Perforation 373.40 374.40 13
2004-08-10 Perforation 384.40 385.40 13
2004-08-10 Perforation 391.90 392.90 13
2004-08-10 Perforation 400.50 401.50 13
2004-08-10 Perforation 499.00 500.00 13
2004-08-10 Perforation 514.10 515.10 13
2004-08-10 Perforation 547.60 548.60 13
2004-08-10 Perforation 551.70 552.70 13
2001-01-09 Perforation 774.00 777.00 7
2004-08-10 Perforation 555.70 556.70 13
2004-08-10 Perforation 575.80 576.80 13
2004-08-10 Perforation 583.70 584.70 13
2004-08-10 Perforation 605.50 606.50 13
2004-08-10 Perforation 615.00 616.00 13
2004-08-10 Perforation 621.70 622.70 13
2004-08-10 Perforation 646.80 647.80 13
2004-08-10 Perforation 657.60 658.60 13
2004-08-10 Perforation 662.90 663.90 13
2004-08-10 Perforation 669.90 670.90 13
2001-01-09 Perforation 769.00 773.00 7
2004-08-10 Perforation 682.70 684.70 13
2004-08-10 Perforation 698.30 699.30 13
2004-08-10 Perforation 701.80 702.80 13
2004-08-10 Perforation 703.90 705.90 13
2004-08-10 Perforation 707.40 708.40 13
2004-08-10 Perforation 710.70 711.70 13
2004-08-18 Fracture 216.70 711.70 0
2002-09-20 Fracture 769.00 783.00 0
2004-08-10 Perforation 216.70 217.70 13
2004-08-10 Perforation 218.00 219.00 13
2004-08-10 Perforation 231.70 232.70 13
2004-08-10 Perforation 236.50 237.50 13
2004-08-10 Perforation 239.10 240.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 380 0.0 0.0 0.0
2003 3267 0.0 0.0 0.0
2004 4857 0.0 0.0 0.0
2005 2070 0.0 0.0 0.0

For data sources see[5]

References