If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274260903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.285548,"lon":-113.606141,"icon":""}]} |
Location: 00/03-09-027-26W4/0 | |
Location Alias: 00/03-09-27-26 W4M | |
Location Alias 2: 00/03-09-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 3-9-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0238990 | |
License Date: 2000-06-23 | |
License Status: Issued | |
Spud Date: 2000-11-21 | |
Final Drill Date: 2000-11-27 | |
Well Total Depth: 1061.00 m | |
Surface Hole Latitude: 51.285548 | |
Surface Hole Longitude: -113.606141 |
Date | Event |
---|---|
2000-06-23 | Obtained License |
2000-11-27 | Finished Drilling |
2000-11-27 | Well Log Performed |
2000-11-28 | Conductor Casing Operation Performed |
2000-11-28 | Production Casing Operation Performed |
2000-11-28 | Rig Released |
2000-11-28 | Well Mode changed to Drilled and Cased |
2000-12-05 | Well Log Performed |
2001-01-09 | Perforation Treatment Performed - Jet Perforation |
2002-09-20 | Perforation Treatment Performed - Fractured |
2002-10-03 | Well Began Production |
2002-10-03 | Well Fluid changed to Gas |
2002-10-03 | Well Mode changed to Flowing |
2004-08-10 | Perforation Treatment Performed - Jet Perforation |
2004-08-18 | Perforation Treatment Performed - Fractured |
2006-05-01 | Well Fluid changed to Gas |
2006-05-01 | Well Mode changed to Suspended |
2017-04-24 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-01-09 | Perforation | 780.00 | 783.00 | 7 |
2004-08-10 | Perforation | 362.80 | 363.80 | 13 |
2004-08-10 | Perforation | 370.80 | 371.80 | 13 |
2004-08-10 | Perforation | 373.40 | 374.40 | 13 |
2004-08-10 | Perforation | 384.40 | 385.40 | 13 |
2004-08-10 | Perforation | 391.90 | 392.90 | 13 |
2004-08-10 | Perforation | 400.50 | 401.50 | 13 |
2004-08-10 | Perforation | 499.00 | 500.00 | 13 |
2004-08-10 | Perforation | 514.10 | 515.10 | 13 |
2004-08-10 | Perforation | 547.60 | 548.60 | 13 |
2004-08-10 | Perforation | 551.70 | 552.70 | 13 |
2001-01-09 | Perforation | 774.00 | 777.00 | 7 |
2004-08-10 | Perforation | 555.70 | 556.70 | 13 |
2004-08-10 | Perforation | 575.80 | 576.80 | 13 |
2004-08-10 | Perforation | 583.70 | 584.70 | 13 |
2004-08-10 | Perforation | 605.50 | 606.50 | 13 |
2004-08-10 | Perforation | 615.00 | 616.00 | 13 |
2004-08-10 | Perforation | 621.70 | 622.70 | 13 |
2004-08-10 | Perforation | 646.80 | 647.80 | 13 |
2004-08-10 | Perforation | 657.60 | 658.60 | 13 |
2004-08-10 | Perforation | 662.90 | 663.90 | 13 |
2004-08-10 | Perforation | 669.90 | 670.90 | 13 |
2001-01-09 | Perforation | 769.00 | 773.00 | 7 |
2004-08-10 | Perforation | 682.70 | 684.70 | 13 |
2004-08-10 | Perforation | 698.30 | 699.30 | 13 |
2004-08-10 | Perforation | 701.80 | 702.80 | 13 |
2004-08-10 | Perforation | 703.90 | 705.90 | 13 |
2004-08-10 | Perforation | 707.40 | 708.40 | 13 |
2004-08-10 | Perforation | 710.70 | 711.70 | 13 |
2004-08-18 | Fracture | 216.70 | 711.70 | 0 |
2002-09-20 | Fracture | 769.00 | 783.00 | 0 |
2004-08-10 | Perforation | 216.70 | 217.70 | 13 |
2004-08-10 | Perforation | 218.00 | 219.00 | 13 |
2004-08-10 | Perforation | 231.70 | 232.70 | 13 |
2004-08-10 | Perforation | 236.50 | 237.50 | 13 |
2004-08-10 | Perforation | 239.10 | 240.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 380 | 0.0 | 0.0 | 0.0 |
2003 | 3267 | 0.0 | 0.0 | 0.0 |
2004 | 4857 | 0.0 | 0.0 | 0.0 |
2005 | 2070 | 0.0 | 0.0 | 0.0 |
For data sources see[5]