X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274260912W03

Well Details

Well ID: 0274260912W03
Loading map...
Location: W0/12-09-027-26W4/3
Location Alias: W0/12-09-27-26 W4M
Location Alias 2: W0/12-09-027-26 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER 1W0 ENTICE 12-9-27-26
Operator Name: Ember Resources Inc.
License Number: 0268712
License Date: 2002-03-18
License Status: Amended
Spud Date: 2002-03-25
Final Drill Date: 2002-04-01
Well Total Depth: 1979.00 m
Surface Hole Latitude: 51.294865
Surface Hole Longitude: -113.609869

For data sources see[1][2]

Well History

Date Event
2002-03-18 Obtained License
2002-03-26 Surface Casing Operation Performed
2002-03-28 Direction Drilling Operation Performed - Deviate
2002-04-01 Finished Drilling
2002-04-01 Well Log Performed
2002-04-01 Well Mode changed to Drilled and Cased
2002-04-02 Production Casing Operation Performed
2002-04-03 Rig Released
2002-08-07 Well Log Performed
2002-08-08 Well Log Performed
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-15 Perforation Treatment Performed - Jet Perforation
2002-08-15 Plug Back Performed
2002-09-05 Perforation Treatment Performed - Fractured
2003-06-13 Well Log Performed
2003-06-19 Perforation Treatment Performed - Jet Perforation
2003-06-26 Perforation Treatment Performed - Jet Perforation
2003-08-16 Perforation Treatment Performed - Jet Perforation
2005-07-26 Perforation Treatment Performed - Jet Perforation
2005-07-26 Well Log Performed
2005-07-29 Perforation Treatment Performed - Fractured
2019-01-28 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-28 1050.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-09 Perforation 1946.00 1948.50 17
2005-07-26 Perforation 684.80 685.30 13
2005-07-26 Perforation 669.70 670.20 13
2005-07-26 Perforation 649.00 649.50 13
2005-07-26 Perforation 647.70 648.20 13
2005-07-26 Perforation 637.50 638.00 13
2005-07-26 Perforation 632.10 632.60 13
2005-07-26 Perforation 627.80 628.30 13
2005-07-26 Perforation 618.90 619.40 13
2005-07-26 Perforation 617.70 618.20 13
2005-07-26 Perforation 604.30 604.80 13
2002-08-09 Perforation 1942.00 1943.00 17
2005-07-26 Perforation 596.80 597.30 13
2005-07-26 Perforation 589.60 590.10 13
2005-07-26 Perforation 588.60 589.10 13
2005-07-26 Perforation 586.00 586.50 13
2005-07-26 Perforation 567.20 567.70 13
2005-07-26 Perforation 562.70 563.20 13
2005-07-26 Perforation 561.70 562.20 13
2005-07-26 Perforation 541.10 541.60 13
2005-07-26 Perforation 538.50 539.00 13
2005-07-26 Perforation 534.10 534.60 13
2002-08-15 Packing Device Capped w/Cement 1931.00 1939.00 0
2005-07-26 Perforation 527.10 527.60 13
2005-07-26 Perforation 516.70 517.20 13
2005-07-26 Perforation 506.60 507.10 13
2005-07-26 Perforation 496.10 496.60 13
2005-07-26 Perforation 493.00 493.50 13
2005-07-26 Perforation 488.00 488.50 13
2005-07-26 Perforation 470.90 471.40 13
2005-07-26 Perforation 389.90 390.40 13
2005-07-26 Perforation 384.70 385.20 13
2005-07-26 Perforation 375.00 375.50 13
2002-08-15 Perforation 1639.50 1642.50 17
2005-07-26 Perforation 372.10 372.60 13
2005-07-26 Perforation 364.80 365.30 13
2005-07-26 Perforation 363.10 363.60 13
2005-07-29 Fracture 363.20 686.10 0
2002-09-05 Fracture 1639.50 1642.50 0
2003-06-19 Perforation 953.00 958.00 13
2003-06-26 Perforation 932.00 934.00 13
2003-08-16 Perforation 744.00 746.00 13
2005-07-26 Perforation 685.60 686.10 13

For data sources see[5]



References