If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274261109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.295088,"lon":-113.549318,"icon":""}]} |
Location: 00/09-11-027-26W4/0 | |
Location Alias: 00/09-11-27-26 W4M | |
Location Alias 2: 00/09-11-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-11-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0366451 | |
License Date: 2006-11-21 | |
License Status: Issued | |
Spud Date: 2006-11-24 | |
Final Drill Date: 2006-11-26 | |
Well Total Depth: 745.00 m | |
Surface Hole Latitude: 51.295088 | |
Surface Hole Longitude: -113.549318 |
Date | Event |
---|---|
2006-11-21 | Obtained License |
2006-11-25 | Surface Casing Operation Performed |
2006-11-26 | Finished Drilling |
2006-11-26 | Production Casing Operation Performed |
2006-11-26 | Rig Released |
2006-11-26 | Well Mode changed to Drilled and Cased |
2006-12-03 | Well Log Performed |
2006-12-07 | Perforation Treatment Performed - Jet Perforation |
2006-12-12 | Perforation Treatment Performed - Fractured |
2006-12-12 | Perforation Treatment Performed - Jet Perforation |
2006-12-20 | Well Began Production |
2006-12-20 | Well Fluid changed to Gas |
2006-12-20 | Well Mode changed to Flowing |
2008-12-21 | Perforation Treatment Performed - Jet Perforation |
2008-12-28 | Well Fluid changed to Gas |
2008-12-28 | Well Mode changed to Flowing |
2019-09-22 | Perforation Treatment Performed - Jet Perforation |
2019-09-22 | Well Log Performed |
2019-11-21 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-12-07 | Perforation | 713.00 | 714.00 | 17 |
2008-12-21 | Perforation | 673.50 | 675.00 | 17 |
2008-12-21 | Perforation | 508.00 | 510.00 | 17 |
2008-12-21 | Perforation | 391.00 | 393.00 | 17 |
2008-12-21 | Perforation | 358.00 | 360.00 | 17 |
2008-12-21 | Perforation | 180.00 | 183.00 | 17 |
2019-09-22 | Perforation | 327.30 | 328.30 | 13 |
2019-09-22 | Perforation | 341.30 | 342.30 | 13 |
2019-09-22 | Perforation | 449.50 | 451.00 | 13 |
2019-09-22 | Perforation | 463.30 | 464.30 | 13 |
2019-09-22 | Perforation | 488.70 | 489.70 | 13 |
2006-12-07 | Perforation | 703.50 | 704.50 | 17 |
2019-09-22 | Perforation | 517.10 | 519.10 | 13 |
2019-09-22 | Perforation | 540.70 | 542.20 | 13 |
2019-09-22 | Perforation | 552.50 | 553.50 | 13 |
2019-09-22 | Perforation | 561.80 | 562.80 | 13 |
2019-09-22 | Perforation | 576.40 | 577.40 | 13 |
2019-09-22 | Perforation | 585.30 | 586.30 | 13 |
2019-09-22 | Perforation | 589.60 | 590.60 | 13 |
2019-09-22 | Perforation | 606.00 | 607.00 | 13 |
2019-09-22 | Perforation | 624.30 | 625.30 | 13 |
2019-09-22 | Perforation | 630.30 | 631.30 | 13 |
2006-12-07 | Perforation | 543.70 | 544.70 | 17 |
2019-11-21 | Fracture | 327.30 | 328.30 | 0 |
2019-11-21 | Fracture | 341.30 | 342.30 | 0 |
2019-11-21 | Fracture | 449.50 | 451.00 | 0 |
2019-11-21 | Fracture | 463.30 | 464.30 | 0 |
2019-11-21 | Fracture | 488.70 | 489.70 | 0 |
2019-11-21 | Fracture | 517.10 | 519.10 | 0 |
2019-11-21 | Fracture | 540.70 | 542.20 | 0 |
2019-11-21 | Fracture | 552.50 | 553.50 | 0 |
2019-11-21 | Fracture | 561.80 | 562.80 | 0 |
2019-11-21 | Fracture | 576.40 | 577.40 | 0 |
2006-12-12 | Perforation | 702.00 | 702.50 | 17 |
2019-11-21 | Fracture | 585.30 | 586.30 | 0 |
2019-11-21 | Fracture | 589.60 | 590.60 | 0 |
2019-11-21 | Fracture | 606.00 | 607.00 | 0 |
2019-11-21 | Fracture | 624.30 | 625.30 | 0 |
2019-11-21 | Fracture | 630.30 | 631.30 | 0 |
2006-12-12 | Perforation | 694.20 | 695.20 | 17 |
2006-12-12 | Fracture | 713.00 | 714.00 | 0 |
2006-12-12 | Fracture | 702.00 | 704.50 | 0 |
2006-12-12 | Fracture | 694.20 | 695.20 | 0 |
2006-12-12 | Fracture | 543.70 | 544.70 | 0 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-11-21 | 2019-11-21 | 0 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 279 | 0.0 | 0.0 | 0.0 |
2007 | 8452 | 0.0 | 0.0 | 0.0 |
2008 | 8342 | 0.0 | 0.0 | 0.0 |
2009 | 8529 | 0.0 | 0.0 | 0.0 |
2010 | 8645 | 0.0 | 0.0 | 0.0 |
2011 | 4492 | 0.0 | 0.0 | 0.0 |
2012 | 4704 | 0.0 | 0.0 | 0.0 |
2013 | 8638 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 7127 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-11-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]