X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274261605020

Well Details

Well ID: 0274261605020
Loading map...
Location: 02/05-16-027-26W4/0
Location Alias: 02/05-16-27-26 W4M
Location Alias 2: 02/05-16-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 16
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 5-16-27-26
Operator Name: Ember Resources Inc.
License Number: 0265000
License Date: 2001-12-21
License Status: Issued
Spud Date: 2002-01-15
Final Drill Date: 2002-01-16
Well Total Depth: 725.00 m
Surface Hole Latitude: 51.303922
Surface Hole Longitude: -113.609318

For data sources see[1][2]

Well History

Date Event
2001-12-21 Obtained License
2002-01-16 Finished Drilling
2002-01-16 Surface Casing Operation Performed
2002-01-17 Production Casing Operation Performed
2002-01-17 Rig Released
2002-01-17 Well Mode changed to Drilled and Cased
2002-01-22 Well Log Performed
2002-02-05 Perforation Treatment Performed - Jet Perforation
2002-02-08 Perforation Treatment Performed - Fractured
2002-03-03 Well Log Performed
2003-05-28 Well Began Production
2003-05-28 Well Fluid changed to Coalbed Methane-Coals Only
2003-05-28 Well Mode changed to Flowing
2003-11-24 Well Log Performed
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Suspended
2005-05-29 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-05 Perforation 667.60 668.60 13
2002-02-05 Perforation 592.30 593.30 13
2002-02-05 Perforation 572.40 574.40 13
2002-02-05 Perforation 569.90 570.90 13
2002-02-05 Perforation 567.40 568.40 13
2002-02-05 Perforation 547.60 548.60 13
2002-02-05 Perforation 532.40 533.40 13
2002-02-05 Perforation 516.00 517.00 13
2002-02-05 Perforation 510.20 512.20 13
2002-02-05 Perforation 499.60 501.60 13
2002-02-05 Perforation 494.70 495.70 13
2002-02-05 Perforation 653.00 656.00 13
2002-02-05 Perforation 390.40 391.40 13
2002-02-05 Perforation 379.00 380.00 13
2002-02-05 Perforation 376.30 377.30 13
2002-02-05 Perforation 366.40 367.40 13
2002-02-05 Perforation 310.60 311.60 13
2002-02-05 Perforation 266.90 267.90 13
2002-02-05 Perforation 249.40 250.40 13
2002-02-05 Perforation 245.80 246.80 13
2002-02-08 Fracture 245.80 668.80 0
2002-02-05 Perforation 642.70 643.70 13
2002-02-05 Perforation 635.60 636.60 13
2002-02-05 Perforation 631.40 633.40 13
2002-02-05 Perforation 621.90 622.90 13
2002-02-05 Perforation 609.60 610.60 13
2002-02-05 Perforation 603.20 604.20 13
2002-02-05 Perforation 596.80 598.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4263 0.0 0.0 0.0
2005 5123 0.0 0.0 0.0
2006 8743 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8716 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 8621 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8650 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References