X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274261609000

Well Details

Well ID: 0274261609000
Loading map...
Location: 00/09-16-027-26W4/0
Location Alias: 00/09-16-27-26 W4M
Location Alias 2: 00/09-16-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 16
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-16-27-26
Operator Name: Ember Resources Inc.
License Number: 0326236
License Date: 2005-02-11
License Status: Issued
Spud Date: 2005-02-18
Final Drill Date: 2005-02-27
Well Total Depth: 805.00 m
Surface Hole Latitude: 51.307578
Surface Hole Longitude: -113.596671

For data sources see[1][2]

Well History

Date Event
2005-02-11 Obtained License
2005-02-18 Surface Casing Operation Performed
2005-02-27 Finished Drilling
2005-02-27 Production Casing Operation Performed
2005-02-27 Rig Released
2005-02-27 Well Mode changed to Drilled and Cased
2005-02-28 Well Log Performed
2005-03-15 Well Log Performed
2005-03-21 Perforation Treatment Performed - Jet Perforation
2005-04-10 Perforation Treatment Performed - Fractured
2005-04-14 Well Fluid changed to Gas
2005-04-14 Well Mode changed to Testing
2005-05-29 Well Began Production
2005-05-29 Well Fluid changed to Gas
2005-05-29 Well Mode changed to Flowing
2005-09-26 Perforation Treatment Performed - Jet Perforation
2005-10-15 Perforation Treatment Performed - Fractured
2005-11-02 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-21 Perforation 586.00 590.00 14
2005-09-26 Perforation 567.30 567.80 13
2005-09-26 Perforation 565.60 566.10 13
2005-09-26 Perforation 560.20 560.70 13
2005-09-26 Perforation 503.10 503.60 13
2005-09-26 Perforation 498.20 498.70 13
2005-09-26 Perforation 492.10 493.10 13
2005-09-26 Perforation 487.60 488.10 13
2005-09-26 Perforation 384.40 384.90 13
2005-09-26 Perforation 373.20 373.70 13
2005-09-26 Perforation 369.70 370.70 13
2005-04-10 Fracture 586.00 590.00 0
2005-09-26 Perforation 363.80 364.30 13
2005-09-26 Perforation 304.10 304.60 13
2005-09-26 Perforation 261.20 261.70 13
2005-09-26 Perforation 260.40 260.90 13
2005-09-26 Perforation 249.50 250.00 13
2005-09-26 Perforation 248.00 248.50 13
2005-10-15 Fracture 248.00 665.80 0
2005-09-26 Perforation 665.30 665.80 13
2005-09-26 Perforation 650.00 650.50 13
2005-09-26 Perforation 640.50 641.00 13
2005-09-26 Perforation 633.30 633.80 13
2005-09-26 Perforation 629.90 630.90 13
2005-09-26 Perforation 620.30 620.80 13
2005-09-26 Perforation 601.40 601.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2656 0.0 0.0 0.0

For data sources see[5]

References