X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274261613002

Well Details

Well ID: 0274261613002
Loading map...
Location: 00/13-16-027-26W4/2
Location Alias: 00/13-16-27-26 W4M
Location Alias 2: 00/13-16-027-26 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 16
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 13-16-27-26
Operator Name: Ember Resources Inc.
License Number: 0326205
License Date: 2005-02-11
License Status: Issued
Spud Date: 2005-02-18
Final Drill Date: 2005-02-26
Well Total Depth: 1022.00 m
Surface Hole Latitude: 51.312971
Surface Hole Longitude: -113.612191

For data sources see[1][2]

Well History

Date Event
2005-02-11 Obtained License
2005-02-18 Surface Casing Operation Performed
2005-02-26 Finished Drilling
2005-02-26 Well Mode changed to Drilled and Cased
2005-02-27 Production Casing Operation Performed
2005-02-27 Rig Released
2005-02-28 Well Log Performed
2005-03-11 Perforation Treatment Performed - Jet Perforation
2007-02-08 Perforation Treatment Performed - Jet Perforation
2007-02-14 Perforation Treatment Performed - Fractured
2007-02-17 Well Fluid changed to Gas
2007-02-17 Well Mode changed to Testing
2007-03-06 Perforation Treatment Performed - Jet Perforation
2007-07-04 Perforation Treatment Performed - Fractured
2007-07-17 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-11 Perforation 931.00 934.00 13
2007-03-06 Perforation 597.10 598.10 13
2007-03-06 Perforation 594.80 595.80 13
2007-03-06 Perforation 575.00 576.00 13
2007-03-06 Perforation 568.40 568.90 13
2007-03-06 Perforation 541.20 541.70 13
2007-03-06 Perforation 515.40 515.90 13
2007-03-06 Perforation 514.70 515.20 13
2007-03-06 Perforation 509.20 510.20 13
2007-03-06 Perforation 499.10 500.10 13
2007-03-06 Perforation 441.00 441.50 13
2007-02-08 Perforation 904.00 905.00 13
2007-03-06 Perforation 387.70 388.20 13
2007-03-06 Perforation 376.60 377.10 13
2007-03-06 Perforation 373.50 374.00 13
2007-03-06 Perforation 363.20 363.70 13
2007-03-06 Perforation 307.40 307.90 13
2007-03-06 Perforation 264.60 265.10 13
2007-03-06 Perforation 247.10 247.60 13
2007-03-06 Perforation 245.90 246.40 13
2007-07-04 Fracture 245.90 671.10 0
2007-02-14 Fracture 904.00 905.00 0
2007-03-06 Perforation 670.60 671.10 13
2007-03-06 Perforation 644.60 645.10 13
2007-03-06 Perforation 637.80 638.80 13
2007-03-06 Perforation 623.20 623.70 13
2007-03-06 Perforation 622.00 622.50 13
2007-03-06 Perforation 603.50 604.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 48 0.0 0.0 0.0

For data sources see[5]

References