X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274261615000

Well Details

Well ID: 0274261615000
Loading map...
Location: 00/15-16-027-26W4/0
Location Alias: 00/15-16-27-26 W4M
Location Alias 2: 00/15-16-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 16
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 15-16-27-26
Operator Name: Ember Resources Inc.
License Number: 0395173
License Date: 2008-03-06
License Status: Issued
Spud Date: 2008-08-03
Final Drill Date: 2008-08-04
Well Total Depth: 1118.00 m
Surface Hole Latitude: 51.307583
Surface Hole Longitude: -113.596254

For data sources see[1][2]

Well History

Date Event
2008-03-06 Obtained License
2008-08-03 Direction Drilling Operation Performed - Deviate
2008-08-03 Surface Casing Operation Performed
2008-08-04 Finished Drilling
2008-08-04 Well Mode changed to Drilled and Cased
2008-08-05 Production Casing Operation Performed
2008-08-05 Rig Released
2008-08-23 Well Log Performed
2008-09-03 Perforation Treatment Performed - Jet Perforation
2008-09-12 Perforation Treatment Performed - Jet Perforation
2008-09-15 Perforation Treatment Performed - Fractured
2008-09-23 Well Began Production
2008-09-23 Well Fluid changed to Coalbed Methane-Coals and Other
2008-09-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-08-03 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-03 Perforation 1049.50 1053.50 13
2008-09-12 Perforation 804.30 806.30 13
2008-09-12 Perforation 793.40 793.90 13
2008-09-12 Perforation 755.50 756.00 13
2008-09-12 Perforation 722.60 723.60 13
2008-09-12 Perforation 715.40 716.40 13
2008-09-12 Perforation 706.90 707.40 13
2008-09-12 Perforation 698.50 700.50 13
2008-09-12 Perforation 549.00 549.50 13
2008-09-12 Perforation 540.00 543.00 13
2008-09-12 Perforation 531.40 531.90 13
2008-09-12 Perforation 920.80 921.30 13
2008-09-12 Perforation 527.10 527.60 13
2008-09-12 Perforation 432.70 433.20 13
2008-09-12 Perforation 373.00 375.00 13
2008-09-12 Perforation 358.00 358.50 13
2008-09-12 Perforation 355.70 356.20 13
2008-09-12 Perforation 316.00 319.00 13
2008-09-15 Fracture 316.00 921.30 0
2008-09-12 Perforation 917.80 918.30 13
2008-09-12 Perforation 894.70 895.70 13
2008-09-12 Perforation 891.60 892.10 13
2008-09-12 Perforation 878.40 878.90 13
2008-09-12 Perforation 875.80 876.30 13
2008-09-12 Perforation 851.50 852.00 13
2008-09-12 Perforation 839.80 841.80 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2400 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8012 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8716 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 8621 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8650 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[6]

References