If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274261908002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.318551,"lon":-113.639885,"icon":""}]} |
| Location: 00/08-19-027-26W4/2 | |
| Location Alias: 00/08-19-27-26 W4M | |
| Location Alias 2: 00/08-19-027-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 19 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 8-19-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0308373 | |
| License Date: 2004-05-10 | |
| License Status: Issued | |
| Spud Date: 2004-09-19 | |
| Final Drill Date: 2004-09-27 | |
| Well Total Depth: 804.00 m | |
| Surface Hole Latitude: 51.318551 | |
| Surface Hole Longitude: -113.639885 |
| Date | Event |
|---|---|
| 2004-05-10 | Obtained License |
| 2004-09-19 | Surface Casing Operation Performed |
| 2004-09-27 | Finished Drilling |
| 2004-09-27 | Well Mode changed to Drilled and Cased |
| 2004-09-28 | Production Casing Operation Performed |
| 2004-09-28 | Rig Released |
| 2004-10-16 | Well Log Performed |
| 2004-10-30 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2005-05-23 | Perforation Treatment Performed - Jet Perforation |
| 2005-05-29 | Perforation Treatment Performed - Fractured |
| 2005-07-17 | Well Began Production |
| 2005-07-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2005-07-17 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-10-30 | Perforation | 564.00 | 567.00 | 14 |
| 2005-05-23 | Perforation | 607.00 | 607.50 | 13 |
| 2005-05-23 | Perforation | 586.60 | 587.10 | 13 |
| 2005-05-23 | Perforation | 579.60 | 580.10 | 13 |
| 2005-05-23 | Perforation | 576.50 | 577.00 | 13 |
| 2005-05-23 | Perforation | 556.80 | 557.30 | 13 |
| 2005-05-23 | Perforation | 530.80 | 531.30 | 13 |
| 2005-05-23 | Perforation | 520.00 | 520.50 | 13 |
| 2005-05-23 | Perforation | 517.40 | 517.90 | 13 |
| 2005-05-23 | Perforation | 500.50 | 501.00 | 13 |
| 2005-05-23 | Perforation | 388.80 | 389.30 | 13 |
| 2004-11-18 | Perforation | 512.00 | 515.00 | 14 |
| 2005-05-23 | Perforation | 387.00 | 387.50 | 13 |
| 2005-05-23 | Perforation | 384.90 | 385.40 | 13 |
| 2005-05-23 | Perforation | 316.80 | 317.30 | 13 |
| 2005-05-23 | Perforation | 275.60 | 276.10 | 13 |
| 2005-05-23 | Perforation | 267.40 | 267.90 | 13 |
| 2005-05-23 | Perforation | 261.50 | 262.00 | 13 |
| 2005-05-23 | Perforation | 259.70 | 260.70 | 13 |
| 2005-05-23 | Perforation | 239.40 | 239.90 | 13 |
| 2005-05-23 | Perforation | 234.00 | 234.50 | 13 |
| 2005-05-23 | Perforation | 232.20 | 232.70 | 13 |
| 2005-05-23 | Perforation | 682.80 | 683.30 | 13 |
| 2005-05-23 | Perforation | 229.50 | 230.00 | 13 |
| 2005-05-29 | Fracture | 229.20 | 683.30 | 0 |
| 2005-05-23 | Perforation | 679.50 | 680.00 | 13 |
| 2005-05-23 | Perforation | 677.20 | 677.70 | 13 |
| 2005-05-23 | Perforation | 667.10 | 667.60 | 13 |
| 2005-05-23 | Perforation | 648.60 | 649.10 | 13 |
| 2005-05-23 | Perforation | 632.90 | 633.40 | 13 |
| 2005-05-23 | Perforation | 613.90 | 614.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 4027 | 0.0 | 0.0 | 0.0 |
| 2006 | 8751 | 0.0 | 0.0 | 0.0 |
| 2007 | 8576 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8743 | 0.0 | 0.0 | 0.0 |
| 2011 | 8754 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8728 | 0.0 | 0.0 | 0.0 |
| 2015 | 8694 | 0.0 | 0.0 | 0.0 |
| 2016 | 8724 | 0.0 | 0.0 | 0.0 |
| 2017 | 8580 | 0.0 | 0.0 | 0.0 |
| 2018 | 8697 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]