X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274262410003

Well Details

Well ID: 0274262410003
Loading map...
Location: 00/10-24-027-26W4/3
Location Alias: 00/10-24-27-26 W4M
Location Alias 2: 00/10-24-027-26 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 24
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 10-24-27-26
Operator Name: Ember Resources Inc.
License Number: 0390061
License Date: 2007-12-27
License Status: Issued
Spud Date: 2008-01-11
Final Drill Date: 2008-01-13
Well Total Depth: 738.00 m
Surface Hole Latitude: 51.323916
Surface Hole Longitude: -113.529170

For data sources see[1][2]

Well History

Date Event
2007-12-27 Obtained License
2008-01-11 Surface Casing Operation Performed
2008-01-13 Finished Drilling
2008-01-13 Production Casing Operation Performed
2008-01-13 Rig Released
2008-01-13 Well Mode changed to Drilled and Cased
2008-01-20 Well Log Performed
2008-01-31 Perforation Treatment Performed - Jet Perforation
2008-02-06 Perforation Treatment Performed - Jet Perforation
2008-02-14 Perforation Treatment Performed - Fractured
2008-02-22 Perforation Treatment Performed - Jet Perforation
2008-02-27 Perforation Treatment Performed - Fractured
2008-03-07 Well Fluid changed to Gas
2008-03-07 Well Mode changed to Testing
2008-04-15 Well Structure changed to Commingled
2011-08-09 Perforation Treatment Performed - Jet Perforation
2011-08-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-31 Perforation 690.50 693.50 13
2011-08-09 Perforation 214.20 215.20 13
2011-08-09 Perforation 312.70 313.20 13
2011-08-09 Perforation 318.40 318.90 13
2011-08-09 Perforation 325.70 326.20 13
2011-08-09 Perforation 383.10 383.60 13
2011-08-09 Perforation 439.80 441.30 13
2011-08-09 Perforation 449.10 449.60 13
2011-08-09 Perforation 455.90 456.90 13
2011-08-09 Perforation 467.00 467.50 13
2011-08-09 Perforation 475.70 476.20 13
2008-02-06 Perforation 675.00 677.00 13
2011-08-09 Perforation 482.40 482.90 13
2011-08-09 Perforation 487.20 488.20 13
2011-08-09 Perforation 510.50 511.50 13
2011-08-09 Perforation 532.30 532.80 13
2011-08-09 Perforation 536.10 537.10 13
2011-08-09 Perforation 542.50 543.00 13
2011-08-09 Perforation 548.40 548.90 13
2011-08-09 Perforation 561.10 561.60 13
2011-08-09 Perforation 569.20 570.20 13
2011-08-09 Perforation 576.50 577.50 13
2008-02-14 Fracture 675.00 677.00 0
2011-08-09 Perforation 578.60 579.10 13
2011-08-09 Perforation 587.90 588.90 13
2011-08-09 Perforation 273.00 275.00 13
2011-08-09 Perforation 357.50 360.50 13
2011-08-09 Perforation 398.50 401.50 13
2011-08-09 Perforation 416.00 419.00 13
2011-08-09 Perforation 423.00 424.00 13
2011-08-09 Perforation 428.50 430.50 13
2011-08-09 Perforation 459.00 461.00 13
2011-08-23 Fracture 202.80 607.40 0
2008-02-22 Perforation 660.00 663.00 13
2008-02-27 Fracture 660.00 663.00 0
2011-08-09 Perforation 557.00 559.00 13
2011-08-09 Perforation 606.40 607.40 13
2011-08-09 Perforation 202.80 203.80 13
2011-08-09 Perforation 204.10 205.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 48 0.0 0.0 0.0

For data sources see[5]

References