If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274262514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.341526,"lon":-113.535172,"icon":""}]} |
| Location: 00/14-25-027-26W4/0 | |
| Location Alias: 00/14-25-27-26 W4M | |
| Location Alias 2: 00/14-25-027-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 25 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 14-25-27-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0421931 | |
| License Date: 2010-07-19 | |
| License Status: Amended | |
| Spud Date: 2011-01-16 | |
| Final Drill Date: 2011-01-18 | |
| Well Total Depth: 962.00 m | |
| Surface Hole Latitude: 51.341526 | |
| Surface Hole Longitude: -113.535172 |
| Date | Event |
|---|---|
| 2010-07-19 | Obtained License |
| 2011-01-16 | Surface Casing Operation Performed |
| 2011-01-18 | Finished Drilling |
| 2011-01-18 | Well Mode changed to Drilled and Cased |
| 2011-01-19 | Production Casing Operation Performed |
| 2011-01-19 | Rig Released |
| 2011-01-26 | Well Log Performed |
| 2011-02-11 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-23 | Perforation Treatment Performed - Fractured |
| 2011-02-26 | Well Fluid changed to Gas |
| 2011-02-26 | Well Mode changed to Testing |
| 2011-03-10 | Perforation Treatment Performed - Jet Perforation |
| 2011-04-07 | Well Began Production |
| 2011-04-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-04-07 | Well Mode changed to Flowing |
| 2011-06-14 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-11 | Perforation | 677.50 | 679.50 | 13 |
| 2011-03-10 | Perforation | 588.60 | 589.60 | 13 |
| 2011-03-10 | Perforation | 577.90 | 578.40 | 13 |
| 2011-03-10 | Perforation | 576.70 | 577.20 | 13 |
| 2011-03-10 | Perforation | 563.00 | 563.50 | 13 |
| 2011-03-10 | Perforation | 557.60 | 558.10 | 13 |
| 2011-03-10 | Perforation | 551.20 | 552.70 | 13 |
| 2011-03-10 | Perforation | 527.20 | 528.20 | 13 |
| 2011-03-10 | Perforation | 523.70 | 525.70 | 13 |
| 2011-03-10 | Perforation | 503.80 | 504.80 | 13 |
| 2011-03-10 | Perforation | 497.30 | 497.80 | 13 |
| 2011-02-11 | Perforation | 665.00 | 667.00 | 13 |
| 2011-03-10 | Perforation | 489.70 | 490.20 | 13 |
| 2011-03-10 | Perforation | 479.00 | 479.50 | 13 |
| 2011-03-10 | Perforation | 471.90 | 472.40 | 13 |
| 2011-03-10 | Perforation | 467.10 | 468.10 | 13 |
| 2011-03-10 | Perforation | 455.20 | 455.70 | 13 |
| 2011-03-10 | Perforation | 451.90 | 452.40 | 13 |
| 2011-03-10 | Perforation | 347.90 | 348.40 | 13 |
| 2011-03-10 | Perforation | 336.80 | 337.30 | 13 |
| 2011-03-10 | Perforation | 329.90 | 330.40 | 13 |
| 2011-03-10 | Perforation | 323.40 | 323.90 | 13 |
| 2011-02-23 | Fracture | 677.50 | 679.50 | 0 |
| 2011-03-10 | Perforation | 321.10 | 321.60 | 13 |
| 2011-03-10 | Perforation | 265.20 | 265.70 | 13 |
| 2011-03-10 | Perforation | 222.40 | 223.90 | 13 |
| 2011-03-10 | Perforation | 211.70 | 212.70 | 13 |
| 2011-03-10 | Perforation | 572.00 | 574.00 | 13 |
| 2011-03-10 | Perforation | 568.00 | 570.00 | 13 |
| 2011-03-10 | Perforation | 520.00 | 522.00 | 13 |
| 2011-03-10 | Perforation | 516.00 | 518.00 | 13 |
| 2011-03-10 | Perforation | 432.00 | 435.00 | 13 |
| 2011-03-10 | Perforation | 427.00 | 428.00 | 13 |
| 2011-02-23 | Fracture | 665.00 | 667.00 | 0 |
| 2011-03-10 | Perforation | 414.00 | 416.00 | 13 |
| 2011-03-10 | Perforation | 410.00 | 411.00 | 13 |
| 2011-03-10 | Perforation | 391.00 | 394.00 | 13 |
| 2011-03-10 | Perforation | 381.00 | 383.00 | 13 |
| 2011-03-10 | Perforation | 367.00 | 370.00 | 13 |
| 2011-03-10 | Perforation | 232.00 | 234.00 | 13 |
| 2011-03-10 | Perforation | 219.00 | 220.00 | 13 |
| 2011-06-14 | Fracture | 211.70 | 622.20 | 0 |
| 2011-06-14 | Fracture | 219.00 | 574.00 | 0 |
| 2011-03-10 | Perforation | 621.70 | 622.20 | 13 |
| 2011-03-10 | Perforation | 607.10 | 607.60 | 13 |
| 2011-03-10 | Perforation | 605.10 | 606.10 | 13 |
| 2011-03-10 | Perforation | 595.40 | 595.90 | 13 |
| 2011-03-10 | Perforation | 592.10 | 593.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6446 | 0.0 | 0.0 | 0.0 |
| 2012 | 8763 | 0.0 | 0.0 | 0.0 |
| 2013 | 8752 | 0.0 | 0.0 | 0.0 |
| 2014 | 8625 | 0.0 | 0.0 | 0.0 |
| 2015 | 8614 | 0.0 | 0.0 | 0.0 |
| 2016 | 8698 | 0.0 | 0.0 | 0.0 |
| 2017 | 8544 | 0.0 | 0.0 | 0.0 |
| 2018 | 8638 | 0.0 | 0.0 | 0.0 |
| 2019 | 8659 | 0.0 | 0.0 | 0.0 |
| 2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]