X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274262608000

Well Details

Well ID: 0274262608000
Loading map...
Location: 00/08-26-027-26W4/0
Location Alias: 00/08-26-27-26 W4M
Location Alias 2: 00/08-26-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 26
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 8-26-27-26
Operator Name: Ember Resources Inc.
License Number: 0385187
License Date: 2007-11-19
License Status: Issued
Spud Date: 2008-01-03
Final Drill Date: 2008-01-05
Well Total Depth: 752.00 m
Surface Hole Latitude: 51.335623
Surface Hole Longitude: -113.545457

For data sources see[1][2]

Well History

Date Event
2007-11-19 Obtained License
2008-01-03 Surface Casing Operation Performed
2008-01-05 Finished Drilling
2008-01-05 Production Casing Operation Performed
2008-01-05 Rig Released
2008-01-05 Well Mode changed to Drilled and Cased
2008-01-10 Well Log Performed
2008-01-27 Perforation Treatment Performed - Jet Perforation
2008-02-04 Perforation Treatment Performed - Fractured
2008-02-11 Well Fluid changed to Gas
2008-02-11 Well Mode changed to Testing
2008-03-27 Well Began Production
2008-03-27 Well Fluid changed to Gas
2008-03-27 Well Mode changed to Flowing
2009-01-08 Perforation Treatment Performed - Jet Perforation
2009-01-20 Perforation Treatment Performed - Fractured
2009-02-20 Well Fluid changed to Coalbed Methane-Coals and Other
2009-02-20 Well Mode changed to Flowing
2009-09-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-27 Perforation 680.00 684.00 13
2009-01-08 Perforation 225.20 226.20 13
2009-01-08 Perforation 213.10 214.10 13
2009-01-08 Perforation 447.50 450.50 13
2009-01-08 Perforation 332.40 332.90 13
2009-01-08 Perforation 324.60 325.10 13
2009-01-08 Perforation 322.70 323.20 13
2009-01-08 Perforation 500.70 501.20 13
2009-01-08 Perforation 595.00 595.50 13
2009-01-08 Perforation 589.60 590.60 13
2009-01-08 Perforation 579.00 580.00 13
2008-02-04 Fracture 680.00 684.00 0
2009-01-08 Perforation 625.20 625.70 13
2009-01-08 Perforation 606.90 607.40 13
2009-01-08 Perforation 597.40 597.90 13
2009-01-08 Perforation 566.60 567.10 13
2009-01-08 Perforation 530.90 531.90 13
2009-01-08 Perforation 529.00 530.00 13
2009-01-08 Perforation 507.60 508.10 13
2009-01-08 Perforation 561.40 561.90 13
2009-01-08 Perforation 554.60 555.60 13
2009-01-08 Perforation 551.50 552.00 13
2009-01-08 Perforation 454.60 455.10 13
2009-01-20 Fracture 447.50 450.50 0
2009-01-20 Fracture 213.10 625.70 0
2009-01-08 Perforation 395.90 396.40 13
2009-01-08 Perforation 344.80 345.30 13
2009-01-08 Perforation 493.20 493.70 13
2009-01-08 Perforation 481.80 482.30 13
2009-01-08 Perforation 472.70 473.20 13
2009-01-08 Perforation 338.90 339.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 6768 0.0 0.0 0.0
2009 8039 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8715 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8625 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8638 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[5]

References