If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274262608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.335623,"lon":-113.545457,"icon":""}]} |
Location: 00/08-26-027-26W4/0 | |
Location Alias: 00/08-26-27-26 W4M | |
Location Alias 2: 00/08-26-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-26-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0385187 | |
License Date: 2007-11-19 | |
License Status: Issued | |
Spud Date: 2008-01-03 | |
Final Drill Date: 2008-01-05 | |
Well Total Depth: 752.00 m | |
Surface Hole Latitude: 51.335623 | |
Surface Hole Longitude: -113.545457 |
Date | Event |
---|---|
2007-11-19 | Obtained License |
2008-01-03 | Surface Casing Operation Performed |
2008-01-05 | Finished Drilling |
2008-01-05 | Production Casing Operation Performed |
2008-01-05 | Rig Released |
2008-01-05 | Well Mode changed to Drilled and Cased |
2008-01-10 | Well Log Performed |
2008-01-27 | Perforation Treatment Performed - Jet Perforation |
2008-02-04 | Perforation Treatment Performed - Fractured |
2008-02-11 | Well Fluid changed to Gas |
2008-02-11 | Well Mode changed to Testing |
2008-03-27 | Well Began Production |
2008-03-27 | Well Fluid changed to Gas |
2008-03-27 | Well Mode changed to Flowing |
2009-01-08 | Perforation Treatment Performed - Jet Perforation |
2009-01-20 | Perforation Treatment Performed - Fractured |
2009-02-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-20 | Well Mode changed to Flowing |
2009-09-20 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-27 | Perforation | 680.00 | 684.00 | 13 |
2009-01-08 | Perforation | 225.20 | 226.20 | 13 |
2009-01-08 | Perforation | 213.10 | 214.10 | 13 |
2009-01-08 | Perforation | 447.50 | 450.50 | 13 |
2009-01-08 | Perforation | 332.40 | 332.90 | 13 |
2009-01-08 | Perforation | 324.60 | 325.10 | 13 |
2009-01-08 | Perforation | 322.70 | 323.20 | 13 |
2009-01-08 | Perforation | 500.70 | 501.20 | 13 |
2009-01-08 | Perforation | 595.00 | 595.50 | 13 |
2009-01-08 | Perforation | 589.60 | 590.60 | 13 |
2009-01-08 | Perforation | 579.00 | 580.00 | 13 |
2008-02-04 | Fracture | 680.00 | 684.00 | 0 |
2009-01-08 | Perforation | 625.20 | 625.70 | 13 |
2009-01-08 | Perforation | 606.90 | 607.40 | 13 |
2009-01-08 | Perforation | 597.40 | 597.90 | 13 |
2009-01-08 | Perforation | 566.60 | 567.10 | 13 |
2009-01-08 | Perforation | 530.90 | 531.90 | 13 |
2009-01-08 | Perforation | 529.00 | 530.00 | 13 |
2009-01-08 | Perforation | 507.60 | 508.10 | 13 |
2009-01-08 | Perforation | 561.40 | 561.90 | 13 |
2009-01-08 | Perforation | 554.60 | 555.60 | 13 |
2009-01-08 | Perforation | 551.50 | 552.00 | 13 |
2009-01-08 | Perforation | 454.60 | 455.10 | 13 |
2009-01-20 | Fracture | 447.50 | 450.50 | 0 |
2009-01-20 | Fracture | 213.10 | 625.70 | 0 |
2009-01-08 | Perforation | 395.90 | 396.40 | 13 |
2009-01-08 | Perforation | 344.80 | 345.30 | 13 |
2009-01-08 | Perforation | 493.20 | 493.70 | 13 |
2009-01-08 | Perforation | 481.80 | 482.30 | 13 |
2009-01-08 | Perforation | 472.70 | 473.20 | 13 |
2009-01-08 | Perforation | 338.90 | 339.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 6768 | 0.0 | 0.0 | 0.0 |
2009 | 8039 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8722 | 0.0 | 0.0 | 0.0 |
2012 | 8715 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 8625 | 0.0 | 0.0 | 0.0 |
2015 | 8614 | 0.0 | 0.0 | 0.0 |
2016 | 8698 | 0.0 | 0.0 | 0.0 |
2017 | 8544 | 0.0 | 0.0 | 0.0 |
2018 | 8638 | 0.0 | 0.0 | 0.0 |
2019 | 8659 | 0.0 | 0.0 | 0.0 |
2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[5]