If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274262801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.337609,"lon":-113.601112,"icon":""}]} |
Location: 00/01-28-027-26W4/0 | |
Location Alias: 00/01-28-27-26 W4M | |
Location Alias 2: 00/01-28-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 28 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 1-28-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410334 | |
License Date: 2009-05-04 | |
License Status: Amended | |
Spud Date: 2009-10-03 | |
Final Drill Date: 2009-10-05 | |
Well Total Depth: 1307.00 m | |
Surface Hole Latitude: 51.337609 | |
Surface Hole Longitude: -113.601112 |
Date | Event |
---|---|
2009-05-04 | Obtained License |
2009-10-03 | Surface Casing Operation Performed |
2009-10-04 | Direction Drilling Operation Performed - Deviate |
2009-10-05 | Finished Drilling |
2009-10-05 | Production Casing Operation Performed |
2009-10-05 | Rig Released |
2009-10-05 | Well Mode changed to Drilled and Cased |
2009-10-09 | Well Log Performed |
2009-11-16 | Perforation Treatment Performed - Jet Perforation |
2009-11-25 | Perforation Treatment Performed - Jet Perforation |
2009-12-09 | Perforation Treatment Performed - Fractured |
2009-12-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-12-15 | Well Mode changed to Testing |
2010-01-07 | Well Began Production |
2010-01-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-07 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-10-04 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-16 | Perforation | 880.00 | 884.00 | 13 |
2009-11-25 | Perforation | 689.70 | 690.20 | 13 |
2009-11-25 | Perforation | 759.90 | 761.90 | 13 |
2009-11-25 | Perforation | 770.10 | 771.10 | 13 |
2009-11-25 | Perforation | 737.40 | 737.90 | 13 |
2009-11-25 | Perforation | 744.10 | 744.60 | 13 |
2009-11-25 | Perforation | 686.90 | 687.40 | 13 |
2009-11-25 | Perforation | 447.10 | 447.60 | 13 |
2009-11-25 | Perforation | 450.80 | 451.30 | 13 |
2009-11-25 | Perforation | 300.10 | 301.10 | 13 |
2009-11-25 | Perforation | 310.90 | 311.90 | 13 |
2009-11-16 | Perforation | 671.00 | 674.00 | 13 |
2009-11-25 | Perforation | 653.70 | 654.20 | 13 |
2009-11-25 | Perforation | 659.90 | 660.40 | 13 |
2009-11-25 | Perforation | 463.70 | 464.20 | 13 |
2009-11-25 | Perforation | 619.40 | 620.40 | 13 |
2009-11-25 | Perforation | 774.30 | 775.30 | 13 |
2009-11-25 | Perforation | 497.00 | 499.00 | 13 |
2009-11-25 | Perforation | 531.00 | 535.00 | 13 |
2009-11-25 | Perforation | 391.00 | 394.00 | 13 |
2009-11-25 | Perforation | 401.00 | 403.00 | 13 |
2009-11-25 | Perforation | 612.50 | 616.50 | 13 |
2009-11-16 | Perforation | 607.00 | 609.00 | 13 |
2009-11-25 | Perforation | 705.00 | 707.00 | 13 |
2009-11-25 | Perforation | 565.00 | 567.00 | 13 |
2009-11-25 | Perforation | 573.00 | 576.00 | 13 |
2009-11-25 | Perforation | 372.00 | 374.00 | 13 |
2009-11-25 | Perforation | 793.10 | 793.60 | 13 |
2009-11-25 | Perforation | 780.50 | 781.00 | 13 |
2009-11-25 | Perforation | 795.30 | 795.80 | 13 |
2009-11-25 | Perforation | 360.00 | 362.00 | 13 |
2009-11-25 | Perforation | 331.00 | 334.00 | 13 |
2009-11-25 | Perforation | 325.00 | 327.00 | 13 |
2009-11-16 | Perforation | 1179.00 | 1180.00 | 13 |
2009-12-09 | Fracture | 300.10 | 795.80 | 0 |
2009-12-09 | Fracture | 1179.00 | 1180.00 | 0 |
2009-12-09 | Fracture | 880.00 | 884.00 | 0 |
2009-11-16 | Perforation | 931.00 | 934.00 | 13 |
2009-11-16 | Perforation | 916.00 | 920.00 | 13 |
2009-11-25 | Perforation | 697.40 | 697.90 | 13 |
2009-11-25 | Perforation | 728.40 | 730.40 | 13 |
2009-11-25 | Perforation | 688.60 | 689.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8754 | 0.0 | 0.0 | 0.0 |
2012 | 8638 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8728 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8724 | 0.0 | 0.0 | 0.0 |
2017 | 8579 | 0.0 | 0.0 | 0.0 |
2018 | 8697 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]