If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274262809003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.338581,"lon":-113.592165,"icon":""}]} |
Location: 00/09-28-027-26W4/3 | |
Location Alias: 00/09-28-27-26 W4M | |
Location Alias 2: 00/09-28-027-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 28 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-28-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0268063 | |
License Date: 2002-02-26 | |
License Status: Issued | |
Spud Date: 2002-03-02 | |
Final Drill Date: 2002-03-08 | |
Well Total Depth: 1023.00 m | |
Surface Hole Latitude: 51.338581 | |
Surface Hole Longitude: -113.592165 |
Date | Event |
---|---|
2002-02-26 | Obtained License |
2002-03-02 | Conductor Casing Operation Performed |
2002-03-08 | Finished Drilling |
2002-03-08 | Well Mode changed to Drilled and Cased |
2002-03-09 | Production Casing Operation Performed |
2002-03-09 | Rig Released |
2002-03-15 | Well Log Performed |
2002-07-18 | Perforation Treatment Performed - Jet Perforation |
2002-09-29 | Perforation Treatment Performed - Fractured |
2002-11-30 | Perforation Treatment Performed - Jet Perforation |
2003-01-14 | Perforation Treatment Performed - Fractured |
2003-01-29 | Perforation Treatment Performed - Jet Perforation |
2003-03-04 | Well Fluid changed to Gas |
2003-03-04 | Well Mode changed to Testing |
2003-03-14 | Perforation Treatment Performed - Fractured |
2003-06-03 | Perforation Treatment Performed - Jet Perforation |
2003-06-15 | Perforation Treatment Performed - Jet Perforation |
2003-06-22 | Perforation Treatment Performed - Jet Perforation |
2003-07-07 | Perforation Treatment Performed - Fractured |
2005-06-01 | Perforation Treatment Performed - Jet Perforation |
2005-07-08 | Perforation Treatment Performed - Fractured |
2017-04-03 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-07-18 | Perforation | 872.00 | 876.00 | 7 |
2003-06-03 | Perforation | 645.00 | 647.00 | 13 |
2003-06-15 | Perforation | 551.00 | 555.00 | 13 |
2003-06-22 | Perforation | 451.00 | 455.00 | 13 |
2003-07-07 | Fracture | 451.00 | 455.00 | 0 |
2005-06-01 | Perforation | 639.20 | 639.70 | 13 |
2005-06-01 | Perforation | 625.50 | 626.00 | 13 |
2005-06-01 | Perforation | 614.70 | 615.20 | 13 |
2005-06-01 | Perforation | 539.10 | 539.60 | 13 |
2005-06-01 | Perforation | 536.70 | 537.20 | 13 |
2005-06-01 | Perforation | 519.10 | 519.60 | 13 |
2002-09-29 | Fracture | 872.00 | 876.00 | 0 |
2005-06-01 | Perforation | 511.70 | 512.20 | 13 |
2005-06-01 | Perforation | 505.00 | 505.50 | 13 |
2005-06-01 | Perforation | 495.80 | 496.80 | 13 |
2005-06-01 | Perforation | 482.90 | 483.40 | 13 |
2005-06-01 | Perforation | 469.10 | 469.60 | 13 |
2005-06-01 | Perforation | 359.30 | 359.80 | 13 |
2005-06-01 | Perforation | 353.50 | 354.00 | 13 |
2005-06-01 | Perforation | 351.30 | 351.80 | 13 |
2005-06-01 | Perforation | 347.00 | 347.50 | 13 |
2005-06-01 | Perforation | 237.30 | 237.80 | 13 |
2002-11-30 | Perforation | 721.00 | 724.00 | 13 |
2005-06-01 | Perforation | 227.80 | 228.30 | 13 |
2005-07-08 | Fracture | 227.80 | 539.60 | 0 |
2002-11-30 | Perforation | 717.00 | 720.00 | 13 |
2003-01-14 | Fracture | 721.00 | 724.00 | 0 |
2003-01-14 | Fracture | 717.00 | 720.00 | 0 |
2003-01-29 | Perforation | 699.00 | 701.00 | 13 |
2003-01-29 | Perforation | 696.00 | 698.00 | 13 |
2003-03-14 | Fracture | 696.00 | 701.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]