If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274262915002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.341873,"lon":-113.625866,"icon":""}]} |
Location: 00/15-29-027-26W4/2 | |
Location Alias: 00/15-29-27-26 W4M | |
Location Alias 2: 00/15-29-027-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 15-29-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0406324 | |
License Date: 2008-12-16 | |
License Status: Issued | |
Spud Date: 2009-01-13 | |
Final Drill Date: 2009-01-16 | |
Well Total Depth: 1074.00 m | |
Surface Hole Latitude: 51.341873 | |
Surface Hole Longitude: -113.625866 |
Date | Event |
---|---|
2008-12-16 | Obtained License |
2009-01-13 | Surface Casing Operation Performed |
2009-01-16 | Finished Drilling |
2009-01-16 | Well Mode changed to Drilled and Cased |
2009-01-17 | Production Casing Operation Performed |
2009-01-17 | Rig Released |
2009-01-20 | Well Log Performed |
2009-01-29 | Perforation Treatment Performed - Jet Perforation |
2009-02-13 | Perforation Treatment Performed - Fractured |
2010-01-07 | Perforation Treatment Performed - Jet Perforation |
2010-01-23 | Perforation Treatment Performed - Jet Perforation |
2010-01-25 | Well Began Production |
2010-01-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-25 | Well Mode changed to Flowing |
2010-02-02 | Perforation Treatment Performed - Fractured |
2010-05-19 | Well Log Performed |
2010-11-03 | Well Log Performed |
2017-04-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-04-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-29 | Perforation | 961.00 | 963.00 | 13 |
2010-01-23 | Perforation | 574.00 | 574.50 | 13 |
2010-01-23 | Perforation | 571.90 | 572.40 | 13 |
2010-01-23 | Perforation | 567.90 | 568.40 | 13 |
2010-01-23 | Perforation | 545.10 | 545.60 | 13 |
2010-01-23 | Perforation | 518.40 | 518.90 | 13 |
2010-01-23 | Perforation | 516.50 | 517.00 | 13 |
2010-01-23 | Perforation | 508.10 | 508.60 | 13 |
2010-01-23 | Perforation | 380.30 | 380.80 | 13 |
2010-01-23 | Perforation | 316.10 | 316.60 | 13 |
2010-01-23 | Perforation | 271.90 | 273.90 | 13 |
2009-02-13 | Fracture | 961.00 | 963.00 | 0 |
2010-01-23 | Perforation | 265.60 | 266.60 | 13 |
2010-01-23 | Perforation | 264.40 | 264.90 | 13 |
2010-01-23 | Perforation | 622.00 | 624.00 | 13 |
2010-01-23 | Perforation | 584.00 | 587.00 | 13 |
2010-01-23 | Perforation | 495.00 | 498.00 | 13 |
2010-01-23 | Perforation | 484.00 | 487.00 | 13 |
2010-01-23 | Perforation | 459.00 | 461.00 | 13 |
2010-01-23 | Perforation | 228.00 | 232.00 | 13 |
2010-02-02 | Fracture | 264.40 | 677.90 | 0 |
2010-02-02 | Fracture | 228.00 | 624.00 | 0 |
2010-01-07 | Perforation | 824.00 | 826.00 | 13 |
2010-01-23 | Perforation | 677.40 | 677.90 | 13 |
2010-01-23 | Perforation | 663.70 | 664.70 | 13 |
2010-01-23 | Perforation | 646.30 | 646.80 | 13 |
2010-01-23 | Perforation | 642.70 | 643.20 | 13 |
2010-01-23 | Perforation | 633.70 | 634.70 | 13 |
2010-01-23 | Perforation | 600.90 | 602.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 8167 | 0.0 | 0.0 | 0.0 |
2011 | 8754 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8728 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8724 | 0.0 | 0.0 | 0.0 |
2017 | 8580 | 0.0 | 0.0 | 0.0 |
2018 | 8697 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]