X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274263115020

Well Details

Well ID: 0274263115020
Loading map...
Location: 02/15-31-027-26W4/0
Location Alias: 02/15-31-27-26 W4M
Location Alias 2: 02/15-31-027-26 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 31
County/Municipality: Rocky View County
Well Name: EMBER 102 HZ ENTICE 15-31-27-26
Operator Name: Ember Resources Inc.
License Number: 0296782
License Date: 2003-11-24
License Status: Abandoned
Spud Date: 2003-12-03
Final Drill Date: 2003-12-27
Well Total Depth: 3085.00 m
Surface Hole Latitude: 51.344237
Surface Hole Longitude: -113.646338

For data sources see[1][2]

Well History

Date Event
2003-11-24 Obtained License
2003-12-04 Surface Casing Operation Performed
2003-12-07 Direction Drilling Operation Performed - Horizontal
2003-12-12 Well Log Performed
2003-12-13 Intermediate Casing Operation Performed
2003-12-15 Well Log Performed
2003-12-27 Finished Drilling
2003-12-27 Well Mode changed to Drilled and Cased
2003-12-28 Perforation Treatment Performed - Open-Hole Completion
2003-12-28 Rig Released
2003-12-28 Well Log Performed
2004-01-23 Well Fluid changed to Gas
2004-01-23 Well Mode changed to Testing
2004-02-14 Perforation Treatment Performed - Jet Perforation
2004-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-11 Perforation Treatment Performed - Jet Perforation
2004-03-11 Well Log Performed
2004-03-15 Perforation Treatment Performed - Cement Squeeze
2004-03-19 Perforation Treatment Performed - Jet Perforation
2004-03-19 Well Log Performed
2004-03-20 Perforation Treatment Performed - Cement Squeeze
2004-03-20 Well Log Performed
2004-03-23 Well Log Performed
2004-03-24 Perforation Treatment Performed - Jet Perforation
2004-03-25 Perforation Treatment Performed - Cement Squeeze
2004-05-24 Well Log Performed
2006-12-22 Well Began Production
2006-12-22 Well Fluid changed to Gas
2006-12-22 Well Mode changed to Flowing
2015-07-01 Well Fluid changed to Gas
2015-07-01 Well Mode changed to Suspended
2018-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-23 Plug Back Performed
2018-07-23 Well Fluid changed to Gas
2018-07-23 Well Mode changed to Abandoned Zone
2018-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-30 Well Abandoned
2018-07-30 Well Fluid changed to Gas
2018-07-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-12-07 1770.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-28 Open Hole/Barefoot Completion 2082.00 3085.00 0
2018-07-23 Packing Device Capped w/Cement 1902.00 1977.80 0
2018-07-24 Packing Device Capped w/Cement 680.80 688.80 0
2018-07-24 Packing Device Capped w/Cement 484.80 492.80 0
2004-02-14 Perforation 2030.50 2040.50 17
2004-02-16 Acid Treatment 2030.50 2040.50 0
2004-03-11 Perforation 695.00 696.00 17
2004-03-15 Cement Squeeze 695.00 696.00 0
2004-03-19 Perforation 600.00 601.00 17
2004-03-20 Cement Squeeze 600.00 601.00 0
2004-03-24 Perforation 499.00 500.00 14
2004-03-25 Cement Squeeze 499.00 500.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 24 0.0 0.0 0.0
2008 2903 0.0 0.0 0.0
2009 1464 0.0 0.0 0.0
2010 1590 0.0 0.0 0.0
2011 239 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-04 No Incident Encountered 0.00 0.00
2013-07-05 No Incident Encountered 0.00 0.00
2018-07-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References