If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274263405020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.353972,"lon":-113.581435,"icon":""}]} |
Location: 02/05-34-027-26W4/0 | |
Location Alias: 02/05-34-27-26 W4M | |
Location Alias 2: 02/05-34-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 5-34-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411053 | |
License Date: 2009-06-23 | |
License Status: Issued | |
Spud Date: 2010-02-14 | |
Final Drill Date: 2010-02-14 | |
Well Total Depth: 1064.00 m | |
Surface Hole Latitude: 51.353972 | |
Surface Hole Longitude: -113.581435 |
Date | Event |
---|---|
2009-06-23 | Obtained License |
2010-02-14 | Direction Drilling Operation Performed - Deviate |
2010-02-14 | Finished Drilling |
2010-02-14 | Surface Casing Operation Performed |
2010-02-14 | Well Mode changed to Drilled and Cased |
2010-02-15 | Production Casing Operation Performed |
2010-02-15 | Rig Released |
2010-02-19 | Well Log Performed |
2010-05-17 | Perforation Treatment Performed - Jet Perforation |
2010-11-06 | Perforation Treatment Performed - Jet Perforation |
2010-11-27 | Perforation Treatment Performed - Fractured |
2010-12-14 | Well Began Production |
2010-12-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-14 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-14 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-05-17 | Perforation | 898.40 | 898.90 | 13 |
2010-11-06 | Perforation | 303.00 | 306.00 | 13 |
2010-11-06 | Perforation | 712.00 | 715.00 | 13 |
2010-11-06 | Perforation | 744.00 | 747.00 | 13 |
2010-11-06 | Perforation | 514.00 | 517.00 | 13 |
2010-11-06 | Perforation | 381.00 | 383.00 | 13 |
2010-11-06 | Perforation | 388.00 | 390.00 | 13 |
2010-11-06 | Perforation | 357.00 | 359.00 | 13 |
2010-11-06 | Perforation | 372.00 | 375.00 | 13 |
2010-11-06 | Perforation | 406.00 | 409.00 | 13 |
2010-11-06 | Perforation | 482.00 | 485.00 | 13 |
2010-05-17 | Perforation | 880.60 | 881.10 | 13 |
2010-11-06 | Perforation | 504.00 | 507.00 | 13 |
2010-11-06 | Perforation | 427.00 | 429.00 | 13 |
2010-11-06 | Perforation | 430.00 | 432.00 | 13 |
2010-11-06 | Perforation | 799.10 | 802.10 | 13 |
2010-11-06 | Perforation | 812.00 | 812.50 | 13 |
2010-11-06 | Perforation | 756.10 | 756.60 | 13 |
2010-11-06 | Perforation | 766.50 | 767.00 | 13 |
2010-11-06 | Perforation | 837.60 | 838.10 | 13 |
2010-11-06 | Perforation | 857.00 | 858.00 | 13 |
2010-11-06 | Perforation | 863.50 | 864.00 | 13 |
2010-05-17 | Perforation | 879.00 | 880.00 | 13 |
2010-11-06 | Perforation | 838.70 | 839.20 | 13 |
2010-11-06 | Perforation | 853.30 | 854.30 | 13 |
2010-11-06 | Perforation | 731.60 | 732.10 | 13 |
2010-11-06 | Perforation | 396.50 | 397.00 | 13 |
2010-11-06 | Perforation | 492.60 | 493.10 | 13 |
2010-11-06 | Perforation | 324.90 | 325.90 | 13 |
2010-11-06 | Perforation | 334.50 | 336.50 | 13 |
2010-11-06 | Perforation | 496.00 | 496.50 | 13 |
2010-11-06 | Perforation | 699.80 | 700.30 | 13 |
2010-11-06 | Perforation | 724.00 | 724.50 | 13 |
2010-11-06 | Perforation | 601.00 | 603.00 | 13 |
2010-11-06 | Perforation | 664.40 | 664.90 | 13 |
2010-11-06 | Perforation | 683.90 | 685.90 | 13 |
2010-11-27 | Fracture | 303.00 | 778.00 | 0 |
2010-11-27 | Fracture | 324.90 | 898.90 | 0 |
2010-11-06 | Perforation | 621.00 | 623.00 | 13 |
2010-11-06 | Perforation | 530.00 | 532.00 | 13 |
2010-11-06 | Perforation | 544.00 | 546.00 | 13 |
2010-11-06 | Perforation | 677.00 | 679.00 | 13 |
2010-11-06 | Perforation | 775.00 | 778.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 432 | 0.0 | 0.0 | 0.0 |
2011 | 8011 | 0.0 | 0.0 | 0.0 |
2012 | 8614 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8728 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8724 | 0.0 | 0.0 | 0.0 |
2017 | 8580 | 0.0 | 0.0 | 0.0 |
2018 | 8697 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]