If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274263511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.351817,"lon":-113.557937,"icon":""}]} |
Location: 00/11-35-027-26W4/0 | |
Location Alias: 00/11-35-27-26 W4M | |
Location Alias 2: 00/11-35-027-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 26 | |
Section: 35 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 11-35-27-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0239022 | |
License Date: 2000-06-23 | |
License Status: Issued | |
Spud Date: 2000-06-28 | |
Final Drill Date: 2000-07-05 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 51.351817 | |
Surface Hole Longitude: -113.557937 |
Date | Event |
---|---|
2000-06-23 | Obtained License |
2000-06-29 | Surface Casing Operation Performed |
2000-07-05 | Finished Drilling |
2000-07-05 | Production Casing Operation Performed |
2000-07-05 | Rig Released |
2000-07-05 | Well Mode changed to Drilled and Cased |
2000-07-09 | Well Log Performed |
2000-08-21 | Perforation Treatment Performed - Jet Perforation |
2000-09-10 | Perforation Treatment Performed - Jet Perforation |
2000-09-16 | Perforation Treatment Performed - Jet Perforation |
2000-09-28 | Perforation Treatment Performed - Fractured |
2000-10-12 | Perforation Treatment Performed - Jet Perforation |
2002-07-08 | Perforation Treatment Performed - Jet Perforation |
2005-05-23 | Perforation Treatment Performed - Jet Perforation |
2005-07-13 | Perforation Treatment Performed - Fractured |
2005-07-25 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-08-21 | Perforation | 900.00 | 903.00 | 7 |
2005-05-23 | Perforation | 631.50 | 632.00 | 13 |
2005-05-23 | Perforation | 628.50 | 629.00 | 13 |
2005-05-23 | Perforation | 614.20 | 615.20 | 13 |
2005-05-23 | Perforation | 607.40 | 608.40 | 13 |
2005-05-23 | Perforation | 605.60 | 606.60 | 13 |
2005-05-23 | Perforation | 603.10 | 603.60 | 13 |
2005-05-23 | Perforation | 590.00 | 591.00 | 13 |
2005-05-23 | Perforation | 578.00 | 578.50 | 13 |
2005-05-23 | Perforation | 569.90 | 570.40 | 13 |
2005-05-23 | Perforation | 563.40 | 564.40 | 13 |
2000-09-10 | Perforation | 877.50 | 880.50 | 7 |
2005-05-23 | Perforation | 561.30 | 561.80 | 13 |
2005-05-23 | Perforation | 542.30 | 542.80 | 13 |
2005-05-23 | Perforation | 538.10 | 541.10 | 13 |
2005-05-23 | Perforation | 516.20 | 517.20 | 13 |
2005-05-23 | Perforation | 509.60 | 510.10 | 13 |
2005-05-23 | Perforation | 502.10 | 502.60 | 13 |
2005-05-23 | Perforation | 490.40 | 490.90 | 13 |
2005-05-23 | Perforation | 484.40 | 484.90 | 13 |
2005-05-23 | Perforation | 483.90 | 484.40 | 13 |
2005-05-23 | Perforation | 480.20 | 481.20 | 13 |
2000-09-16 | Perforation | 718.00 | 723.00 | 7 |
2005-05-23 | Perforation | 459.70 | 460.20 | 13 |
2005-05-23 | Perforation | 458.50 | 459.00 | 13 |
2005-05-23 | Perforation | 377.50 | 378.00 | 13 |
2005-05-23 | Perforation | 359.10 | 359.60 | 13 |
2005-05-23 | Perforation | 351.90 | 352.40 | 13 |
2005-05-23 | Perforation | 344.50 | 345.00 | 13 |
2005-05-23 | Perforation | 342.20 | 342.70 | 13 |
2005-05-23 | Perforation | 339.60 | 340.10 | 13 |
2005-05-23 | Perforation | 326.90 | 327.40 | 13 |
2005-05-23 | Perforation | 320.90 | 321.40 | 13 |
2000-09-28 | Fracture | 718.00 | 723.00 | 0 |
2005-05-23 | Perforation | 271.80 | 272.30 | 13 |
2005-05-23 | Perforation | 229.70 | 230.70 | 13 |
2005-05-23 | Perforation | 222.10 | 222.60 | 13 |
2005-05-23 | Perforation | 220.60 | 221.10 | 13 |
2005-05-23 | Perforation | 201.70 | 202.20 | 13 |
2005-05-23 | Perforation | 199.50 | 200.50 | 13 |
2005-05-23 | Perforation | 198.40 | 198.90 | 13 |
2005-05-23 | Perforation | 197.40 | 197.90 | 13 |
2005-07-13 | Fracture | 197.40 | 637.90 | 0 |
2000-10-12 | Perforation | 680.00 | 683.00 | 7 |
2002-07-08 | Perforation | 468.00 | 474.00 | 7 |
2005-05-23 | Perforation | 637.40 | 637.90 | 13 |
2005-05-23 | Perforation | 635.10 | 635.60 | 13 |
2005-05-23 | Perforation | 633.90 | 634.40 | 13 |
For data sources see[4]