X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274263604002

Well Details

Well ID: 0274263604002
Loading map...
Location: 00/04-36-027-26W4/2
Location Alias: 00/04-36-27-26 W4M
Location Alias 2: 00/04-36-027-26 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 26
Section: 36
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 4-36-27-26
Operator Name: Ember Resources Inc.
License Number: 0309443
License Date: 2004-06-01
License Status: Issued
Spud Date: 2004-06-27
Final Drill Date: 2004-07-12
Well Total Depth: 751.00 m
Surface Hole Latitude: 51.345210
Surface Hole Longitude: -113.539464

For data sources see[1][2]

Well History

Date Event
2004-06-01 Obtained License
2004-06-27 Surface Casing Operation Performed
2004-07-12 Finished Drilling
2004-07-12 Well Mode changed to Drilled and Cased
2004-07-13 Production Casing Operation Performed
2004-07-13 Rig Released
2004-07-22 Well Log Performed
2004-08-13 Perforation Treatment Performed - Jet Perforation
2004-09-07 Perforation Treatment Performed - Jet Perforation
2005-06-23 Perforation Treatment Performed - Jet Perforation
2005-07-20 Perforation Treatment Performed - Fractured
2005-08-01 Well Fluid changed to Coalbed Methane-Coals and Other
2005-08-01 Well Mode changed to Testing
2005-08-05 Well Began Production
2005-08-05 Well Fluid changed to Coalbed Methane-Coals and Other
2005-08-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-08-13 Perforation 550.00 553.00 13
2005-06-23 Perforation 580.80 581.30 13
2005-06-23 Perforation 567.70 568.20 13
2005-06-23 Perforation 561.50 562.00 13
2005-06-23 Perforation 555.40 555.90 13
2005-06-23 Perforation 529.10 529.60 13
2005-06-23 Perforation 524.70 525.20 13
2005-06-23 Perforation 507.60 508.10 13
2005-06-23 Perforation 499.20 499.70 13
2005-06-23 Perforation 493.70 494.20 13
2005-06-23 Perforation 481.10 481.60 13
2004-09-07 Perforation 533.00 536.00 13
2005-06-23 Perforation 471.30 471.80 13
2005-06-23 Perforation 454.80 455.30 13
2005-06-23 Perforation 452.10 452.60 13
2005-06-23 Perforation 351.50 352.00 13
2005-06-23 Perforation 346.40 346.90 13
2005-06-23 Perforation 331.60 332.10 13
2005-06-23 Perforation 322.00 322.50 13
2005-06-23 Perforation 268.40 268.90 13
2005-06-23 Perforation 225.40 225.90 13
2005-06-23 Perforation 213.90 214.40 13
2005-06-23 Perforation 629.00 629.50 13
2005-06-23 Perforation 195.40 195.90 13
2005-06-23 Perforation 192.10 192.60 13
2005-07-20 Fracture 192.10 629.50 0
2005-06-23 Perforation 627.30 627.80 13
2005-06-23 Perforation 608.70 609.20 13
2005-06-23 Perforation 599.50 600.00 13
2005-06-23 Perforation 596.40 596.90 13
2005-06-23 Perforation 593.50 594.00 13
2005-06-23 Perforation 581.70 582.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3560 0.0 0.0 0.0
2006 8712 0.0 0.0 0.0
2007 8689 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8763 0.0 0.0 0.0
2013 8752 0.0 0.0 0.0
2014 8625 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[5]

References