If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274270913003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.297909,"lon":-113.752939,"icon":""}]} |
Location: 00/13-09-027-27W4/3 | |
Location Alias: 00/13-09-27-27 W4M | |
Location Alias 2: 00/13-09-027-27 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 09 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 13-9-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0338616 | |
License Date: 2005-09-20 | |
License Status: Issued | |
Spud Date: 2005-10-26 | |
Final Drill Date: 2005-11-02 | |
Well Total Depth: 921.00 m | |
Surface Hole Latitude: 51.297909 | |
Surface Hole Longitude: -113.752939 |
Date | Event |
---|---|
2005-09-20 | Obtained License |
2005-10-26 | Surface Casing Operation Performed |
2005-11-02 | Finished Drilling |
2005-11-02 | Production Casing Operation Performed |
2005-11-02 | Rig Released |
2005-11-02 | Well Mode changed to Drilled and Cased |
2005-11-11 | Well Log Performed |
2005-11-24 | Perforation Treatment Performed - Jet Perforation |
2006-01-16 | Perforation Treatment Performed - Fractured |
2006-02-01 | Perforation Treatment Performed - Jet Perforation |
2006-02-15 | Perforation Treatment Performed - Fractured |
2008-07-23 | Perforation Treatment Performed - Jet Perforation |
2008-07-29 | Perforation Treatment Performed - Fractured |
2008-07-30 | Perforation Treatment Performed - Fractured |
2008-08-06 | Well Began Production |
2008-08-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-08-06 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-11-24 | Perforation | 682.50 | 684.50 | 13 |
2008-07-23 | Perforation | 788.10 | 788.60 | 13 |
2008-07-23 | Perforation | 778.80 | 779.30 | 13 |
2008-07-23 | Perforation | 777.00 | 778.00 | 13 |
2008-07-23 | Perforation | 770.70 | 771.20 | 13 |
2008-07-23 | Perforation | 759.20 | 759.70 | 13 |
2008-07-23 | Perforation | 755.10 | 755.60 | 13 |
2008-07-23 | Perforation | 747.40 | 747.90 | 13 |
2008-07-23 | Perforation | 731.10 | 731.60 | 13 |
2008-07-23 | Perforation | 724.90 | 725.40 | 13 |
2008-07-23 | Perforation | 718.60 | 719.10 | 13 |
2006-01-16 | Fracture | 682.50 | 684.50 | 0 |
2008-07-23 | Perforation | 717.00 | 718.00 | 13 |
2008-07-23 | Perforation | 695.30 | 697.30 | 13 |
2008-07-23 | Perforation | 691.10 | 691.60 | 13 |
2008-07-23 | Perforation | 688.50 | 689.00 | 13 |
2008-07-23 | Perforation | 627.00 | 627.50 | 13 |
2008-07-23 | Perforation | 624.50 | 625.00 | 13 |
2008-07-23 | Perforation | 615.10 | 615.60 | 13 |
2008-07-23 | Perforation | 611.30 | 611.80 | 13 |
2008-07-23 | Perforation | 561.30 | 561.80 | 13 |
2008-07-29 | Fracture | 561.30 | 796.60 | 0 |
2006-02-01 | Perforation | 603.00 | 606.00 | 13 |
2008-07-30 | Fracture | 341.00 | 377.50 | 0 |
2008-07-30 | Fracture | 225.50 | 312.50 | 0 |
2006-02-15 | Fracture | 603.00 | 606.00 | 0 |
2008-07-23 | Perforation | 375.50 | 377.50 | 13 |
2008-07-23 | Perforation | 341.00 | 344.00 | 13 |
2008-07-23 | Perforation | 310.50 | 312.50 | 13 |
2008-07-23 | Perforation | 225.50 | 228.50 | 13 |
2008-07-23 | Perforation | 796.10 | 796.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 3552 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]