X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274271106003

Well Details

Well ID: 0274271106003
Loading map...
Location: 00/06-11-027-27W4/3
Location Alias: 00/06-11-27-27 W4M
Location Alias 2: 00/06-11-027-27 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 6-11-27-27
Operator Name: Ember Resources Inc.
License Number: 0406322
License Date: 2008-12-16
License Status: Issued
Spud Date: 2009-01-12
Final Drill Date: 2009-01-15
Well Total Depth: 1148.00 m
Surface Hole Latitude: 51.291930
Surface Hole Longitude: -113.699477

For data sources see[1][2]

Well History

Date Event
2008-12-16 Obtained License
2009-01-12 Surface Casing Operation Performed
2009-01-15 Finished Drilling
2009-01-15 Well Mode changed to Drilled and Cased
2009-01-16 Production Casing Operation Performed
2009-01-16 Rig Released
2009-01-16 Well Log Performed
2009-01-26 Well Log Performed
2009-02-08 Perforation Treatment Performed - Jet Perforation
2009-02-28 Perforation Treatment Performed - Jet Perforation
2009-03-09 Perforation Treatment Performed - Fractured
2009-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-18 Perforation Treatment Performed - Jet Perforation
2009-03-18 Plug Back Performed
2009-06-11 Perforation Treatment Performed - Fractured
2009-06-22 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-08 Perforation 1045.50 1047.50 13
2009-03-18 Perforation 503.70 504.20 14
2009-03-18 Perforation 411.70 412.20 14
2009-03-18 Perforation 358.10 358.60 14
2009-03-18 Perforation 436.40 437.40 14
2009-03-18 Perforation 424.10 424.60 14
2009-03-18 Perforation 652.00 654.00 14
2009-03-18 Perforation 713.50 714.00 14
2009-03-18 Perforation 708.80 709.80 14
2009-03-18 Packing Device Capped w/Cement 972.00 979.60 0
2009-03-18 Perforation 723.30 723.80 14
2009-02-28 Perforation 985.50 988.50 13
2009-03-18 Perforation 702.80 703.30 14
2009-03-18 Perforation 666.40 666.90 14
2009-03-18 Perforation 660.70 661.20 14
2009-03-18 Perforation 689.20 690.20 14
2009-03-18 Perforation 680.60 681.60 14
2009-06-11 Fracture 358.10 723.80 0
2009-02-28 Perforation 256.00 259.00 13
2009-03-09 Fracture 985.50 988.50 0
2009-03-09 Fracture 1045.50 1047.50 0
2009-03-18 Perforation 621.00 621.50 14
2009-03-18 Perforation 576.20 576.70 14
2009-03-18 Perforation 631.50 632.00 14
2009-03-18 Perforation 623.30 623.80 14

For data sources see[4]



References