X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274271301020

Well Details

Well ID: 0274271301020
Loading map...
Location: 02/01-13-027-27W4/0
Location Alias: 02/01-13-27-27 W4M
Location Alias 2: 02/01-13-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 13
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 1-13-27-27
Operator Name: Ember Resources Inc.
License Number: 0265743
License Date: 2002-01-09
License Status: Issued
Spud Date: 2002-01-17
Final Drill Date: 2002-01-18
Well Total Depth: 747.00 m
Surface Hole Latitude: 51.300267
Surface Hole Longitude: -113.662580

For data sources see[1][2]

Well History

Date Event
2002-01-09 Obtained License
2002-01-17 Surface Casing Operation Performed
2002-01-18 Finished Drilling
2002-01-18 Production Casing Operation Performed
2002-01-18 Rig Released
2002-01-18 Well Mode changed to Drilled and Cased
2002-01-22 Well Log Performed
2002-02-06 Perforation Treatment Performed - Jet Perforation
2002-02-09 Perforation Treatment Performed - Fractured
2002-03-04 Well Log Performed
2005-05-13 Well Began Production
2005-05-13 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-06 Perforation 689.40 690.40 13
2002-02-06 Perforation 580.50 582.50 13
2002-02-06 Perforation 568.10 569.10 13
2002-02-06 Perforation 535.50 536.50 13
2002-02-06 Perforation 532.40 533.40 13
2002-02-06 Perforation 527.70 528.70 13
2002-02-06 Perforation 519.60 520.60 13
2002-02-06 Perforation 516.70 517.70 13
2002-02-06 Perforation 404.00 406.00 13
2002-02-06 Perforation 394.70 395.70 13
2002-02-06 Perforation 390.50 391.50 13
2002-02-06 Perforation 675.30 677.30 13
2002-02-06 Perforation 386.70 387.70 13
2002-02-06 Perforation 380.30 382.30 13
2002-02-06 Perforation 326.30 327.30 13
2002-02-06 Perforation 283.30 284.30 13
2002-02-06 Perforation 280.70 281.70 13
2002-02-06 Perforation 263.30 264.30 13
2002-02-06 Perforation 248.70 249.70 13
2002-02-09 Fracture 248.70 690.40 0
2002-02-06 Perforation 651.90 653.90 13
2002-02-06 Perforation 642.90 644.90 13
2002-02-06 Perforation 629.30 630.30 13
2002-02-06 Perforation 624.50 625.50 13
2002-02-06 Perforation 617.20 620.20 13
2002-02-06 Perforation 591.20 592.20 13
2002-02-06 Perforation 583.30 584.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5507 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 8576 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8719 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 8621 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8650 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References