If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274271406020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.30666,"lon":-113.697929,"icon":""}]} |
Location: 02/06-14-027-27W4/0 | |
Location Alias: 02/06-14-27-27 W4M | |
Location Alias 2: 02/06-14-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 14 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 6-14-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0385989 | |
License Date: 2007-11-29 | |
License Status: Issued | |
Spud Date: 2007-12-04 | |
Final Drill Date: 2007-12-06 | |
Well Total Depth: 1079.00 m | |
Surface Hole Latitude: 51.306660 | |
Surface Hole Longitude: -113.697929 |
Date | Event |
---|---|
2007-11-29 | Obtained License |
2007-12-04 | Surface Casing Operation Performed |
2007-12-06 | Finished Drilling |
2007-12-06 | Well Mode changed to Drilled and Cased |
2007-12-07 | Production Casing Operation Performed |
2007-12-07 | Rig Released |
2007-12-16 | Well Log Performed |
2008-01-26 | Perforation Treatment Performed - Jet Perforation |
2008-02-06 | Perforation Treatment Performed - Fractured |
2008-02-19 | Well Fluid changed to Gas |
2008-02-19 | Well Mode changed to Testing |
2008-02-23 | Perforation Treatment Performed - Jet Perforation |
2008-03-07 | Well Began Production |
2008-03-07 | Well Fluid changed to Gas |
2008-03-07 | Well Mode changed to Flowing |
2010-01-07 | Perforation Treatment Performed - Jet Perforation |
2010-01-21 | Perforation Treatment Performed - Jet Perforation |
2010-03-16 | Well Structure changed to Commingled |
2010-06-30 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-26 | Perforation | 911.00 | 912.00 | 13 |
2010-01-21 | Perforation | 683.30 | 683.80 | 13 |
2010-01-21 | Perforation | 682.30 | 682.80 | 13 |
2010-01-21 | Perforation | 667.80 | 668.30 | 13 |
2010-01-21 | Perforation | 662.20 | 662.70 | 13 |
2010-01-21 | Perforation | 654.40 | 656.40 | 13 |
2010-01-21 | Perforation | 634.10 | 634.60 | 13 |
2010-01-21 | Perforation | 632.20 | 632.70 | 13 |
2010-01-21 | Perforation | 628.90 | 629.40 | 13 |
2010-01-21 | Perforation | 574.30 | 574.80 | 13 |
2010-01-21 | Perforation | 566.10 | 566.60 | 13 |
2008-02-06 | Fracture | 911.00 | 912.00 | 0 |
2010-01-21 | Perforation | 559.10 | 559.60 | 13 |
2010-01-21 | Perforation | 490.30 | 490.80 | 13 |
2010-01-21 | Perforation | 440.20 | 440.70 | 13 |
2010-01-21 | Perforation | 429.70 | 430.20 | 13 |
2010-01-21 | Perforation | 426.30 | 426.80 | 13 |
2010-01-21 | Perforation | 420.50 | 421.00 | 13 |
2010-01-21 | Perforation | 417.70 | 418.80 | 13 |
2010-01-21 | Perforation | 360.70 | 361.20 | 13 |
2010-01-21 | Perforation | 296.90 | 297.40 | 13 |
2010-01-21 | Perforation | 534.00 | 536.00 | 13 |
2008-02-23 | Perforation | 861.00 | 862.00 | 13 |
2010-01-21 | Perforation | 518.00 | 521.00 | 13 |
2010-06-30 | Fracture | 296.90 | 726.40 | 0 |
2010-01-07 | Perforation | 1051.50 | 1052.50 | 13 |
2010-01-21 | Perforation | 725.90 | 726.40 | 13 |
2010-01-21 | Perforation | 716.40 | 716.90 | 13 |
2010-01-21 | Perforation | 714.10 | 715.10 | 13 |
2010-01-21 | Perforation | 696.40 | 696.90 | 13 |
2010-01-21 | Perforation | 690.70 | 691.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7200 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]