If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274271516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.31264,"lon":-113.711934,"icon":""}]} |
Location: 00/16-15-027-27W4/0 | |
Location Alias: 00/16-15-27-27 W4M | |
Location Alias 2: 00/16-15-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 15 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-15-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423731 | |
License Date: 2010-09-22 | |
License Status: Issued | |
Spud Date: 2010-10-30 | |
Final Drill Date: 2010-11-22 | |
Well Total Depth: 1092.60 m | |
Surface Hole Latitude: 51.312640 | |
Surface Hole Longitude: -113.711934 |
Date | Event |
---|---|
2010-09-22 | Obtained License |
2010-10-30 | Surface Casing Operation Performed |
2010-11-22 | Finished Drilling |
2010-11-22 | Well Mode changed to Drilled and Cased |
2010-11-23 | Production Casing Operation Performed |
2010-11-23 | Rig Released |
2010-11-26 | Well Log Performed |
2011-01-05 | Perforation Treatment Performed - Jet Perforation |
2011-02-02 | Perforation Treatment Performed - Fractured |
2011-02-05 | Well Fluid changed to Gas |
2011-02-05 | Well Mode changed to Testing |
2011-02-17 | Perforation Treatment Performed - Jet Perforation |
2011-02-25 | Perforation Treatment Performed - Fractured |
2011-03-19 | Well Began Production |
2011-03-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-05 | Perforation | 792.00 | 793.50 | 13 |
2011-02-17 | Perforation | 433.20 | 434.20 | 13 |
2011-02-17 | Perforation | 311.00 | 311.50 | 13 |
2011-02-17 | Perforation | 463.10 | 463.60 | 13 |
2011-02-17 | Perforation | 578.50 | 579.00 | 13 |
2011-02-17 | Perforation | 515.60 | 516.10 | 13 |
2011-02-17 | Perforation | 508.30 | 508.80 | 13 |
2011-02-17 | Perforation | 527.00 | 528.50 | 13 |
2011-02-17 | Perforation | 452.00 | 455.50 | 13 |
2011-02-17 | Perforation | 349.50 | 350.50 | 13 |
2011-02-17 | Perforation | 544.50 | 547.50 | 13 |
2011-01-05 | Perforation | 408.00 | 410.00 | 13 |
2011-02-17 | Perforation | 307.00 | 307.50 | 13 |
2011-02-17 | Perforation | 603.00 | 605.00 | 13 |
2011-02-17 | Perforation | 560.50 | 563.00 | 13 |
2011-02-17 | Perforation | 585.90 | 586.40 | 13 |
2011-02-17 | Perforation | 744.50 | 745.00 | 13 |
2011-02-17 | Perforation | 733.80 | 734.80 | 13 |
2011-02-17 | Perforation | 686.10 | 686.60 | 13 |
2011-02-17 | Perforation | 735.70 | 736.20 | 13 |
2011-02-17 | Perforation | 716.80 | 717.30 | 13 |
2011-02-17 | Perforation | 706.90 | 707.90 | 13 |
2011-01-05 | Perforation | 813.50 | 815.00 | 13 |
2011-02-17 | Perforation | 701.00 | 701.50 | 13 |
2011-02-17 | Perforation | 653.40 | 655.40 | 13 |
2011-02-17 | Perforation | 655.60 | 656.10 | 13 |
2011-02-17 | Perforation | 650.80 | 651.30 | 13 |
2011-02-17 | Perforation | 588.40 | 588.90 | 13 |
2011-02-17 | Perforation | 592.20 | 592.70 | 13 |
2011-02-17 | Perforation | 672.10 | 674.60 | 13 |
2011-02-17 | Perforation | 679.60 | 680.10 | 13 |
2011-02-25 | Fracture | 349.50 | 350.50 | 0 |
2011-02-25 | Fracture | 603.00 | 605.00 | 0 |
2011-01-05 | Perforation | 1004.00 | 1005.50 | 13 |
2011-02-25 | Fracture | 527.00 | 563.00 | 0 |
2011-02-25 | Fracture | 452.00 | 455.50 | 0 |
2011-02-25 | Fracture | 578.50 | 592.70 | 0 |
2011-02-25 | Fracture | 650.80 | 717.30 | 0 |
2011-02-25 | Fracture | 733.80 | 745.00 | 0 |
2011-02-25 | Fracture | 307.00 | 311.50 | 0 |
2011-02-25 | Fracture | 433.20 | 449.00 | 0 |
2011-02-25 | Fracture | 463.10 | 516.10 | 0 |
2011-01-05 | Perforation | 930.50 | 932.00 | 13 |
2011-02-02 | Fracture | 408.00 | 410.00 | 0 |
2011-02-02 | Fracture | 813.50 | 815.00 | 0 |
2011-02-02 | Fracture | 930.50 | 932.00 | 0 |
2011-02-17 | Perforation | 448.50 | 449.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6866 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8751 | 0.0 | 0.0 | 0.0 |
2017 | 8630 | 0.0 | 0.0 | 0.0 |
2018 | 8627 | 0.0 | 0.0 | 0.0 |
2019 | 8701 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[5]