If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274271613023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.316459,"lon":-113.745727,"icon":""}]} |
Location: 02/13-16-027-27W4/3 | |
Location Alias: 02/13-16-27-27 W4M | |
Location Alias 2: 02/13-16-027-27 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 16 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 13-16-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0381729 | |
License Date: 2007-09-11 | |
License Status: Issued | |
Spud Date: 2007-10-09 | |
Final Drill Date: 2007-10-11 | |
Well Total Depth: 1241.00 m | |
Surface Hole Latitude: 51.316459 | |
Surface Hole Longitude: -113.745727 |
Date | Event |
---|---|
2007-09-11 | Obtained License |
2007-10-09 | Surface Casing Operation Performed |
2007-10-10 | Direction Drilling Operation Performed - Deviate |
2007-10-11 | Finished Drilling |
2007-10-11 | Production Casing Operation Performed |
2007-10-11 | Rig Released |
2007-10-11 | Well Mode changed to Drilled and Cased |
2007-10-21 | Well Log Performed |
2007-11-08 | Perforation Treatment Performed - Jet Perforation |
2007-11-24 | Perforation Treatment Performed - Fractured |
2008-01-09 | Perforation Treatment Performed - Jet Perforation |
2008-01-22 | Perforation Treatment Performed - Fractured |
2008-02-02 | Perforation Treatment Performed - Jet Perforation |
2008-02-06 | Perforation Treatment Performed - Fractured |
2008-02-26 | Well Began Production |
2008-02-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-02-26 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-10-10 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-11-08 | Perforation | 804.00 | 807.00 | 13 |
2008-02-02 | Perforation | 1010.90 | 1011.40 | 13 |
2008-02-02 | Perforation | 1009.20 | 1009.70 | 13 |
2008-02-02 | Perforation | 990.20 | 990.70 | 13 |
2008-02-02 | Perforation | 982.70 | 983.20 | 13 |
2008-02-02 | Perforation | 972.60 | 974.60 | 13 |
2008-02-02 | Perforation | 947.70 | 949.70 | 13 |
2008-02-02 | Perforation | 941.60 | 942.60 | 13 |
2008-02-02 | Perforation | 940.10 | 940.60 | 13 |
2008-02-02 | Perforation | 850.20 | 850.70 | 13 |
2008-02-02 | Perforation | 845.50 | 846.00 | 13 |
2007-11-24 | Fracture | 804.00 | 807.00 | 0 |
2008-02-02 | Perforation | 743.80 | 744.30 | 13 |
2008-02-02 | Perforation | 648.70 | 649.70 | 13 |
2008-02-02 | Perforation | 627.60 | 628.10 | 13 |
2008-02-02 | Perforation | 597.80 | 598.30 | 13 |
2008-02-02 | Perforation | 491.00 | 491.50 | 13 |
2008-02-06 | Fracture | 491.00 | 1064.50 | 0 |
2008-01-09 | Perforation | 429.50 | 432.50 | 13 |
2008-01-22 | Fracture | 429.50 | 432.50 | 0 |
2008-02-02 | Perforation | 1064.00 | 1064.50 | 13 |
2008-02-02 | Perforation | 1050.70 | 1051.20 | 13 |
2008-02-02 | Perforation | 1047.00 | 1048.00 | 13 |
2008-02-02 | Perforation | 1023.50 | 1024.00 | 13 |
2008-02-02 | Perforation | 1017.60 | 1018.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7439 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]