X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274272014000

Well Details

Well ID: 0274272014000
Loading map...
Location: 00/14-20-027-27W4/0
Location Alias: 00/14-20-27-27 W4M
Location Alias 2: 00/14-20-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 20
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 14-20-27-27
Operator Name: Ember Resources Inc.
License Number: 0405312
License Date: 2008-12-04
License Status: Issued
Spud Date: 2009-01-23
Final Drill Date: 2009-01-25
Well Total Depth: 1467.00 m
Surface Hole Latitude: 51.329618
Surface Hole Longitude: -113.760135

For data sources see[1][2]

Well History

Date Event
2008-12-04 Obtained License
2009-01-23 Surface Casing Operation Performed
2009-01-24 Direction Drilling Operation Performed - Deviate
2009-01-25 Finished Drilling
2009-01-25 Well Mode changed to Drilled and Cased
2009-01-26 Production Casing Operation Performed
2009-01-26 Rig Released
2009-01-30 Well Log Performed
2009-02-19 Perforation Treatment Performed - Jet Perforation
2009-03-29 Well Began Production
2009-03-29 Well Fluid changed to Gas
2009-03-29 Well Mode changed to Flowing
2009-06-08 Perforation Treatment Performed - Jet Perforation
2009-06-10 Perforation Treatment Performed - Fractured
2009-06-16 Well Fluid changed to Coalbed Methane-Coals and Other
2009-06-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-24 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-19 Perforation 1405.00 1407.00 13
2009-06-08 Perforation 770.50 772.50 13
2009-06-08 Perforation 761.50 763.50 13
2009-06-08 Perforation 470.60 471.10 13
2009-06-08 Perforation 467.80 468.30 13
2009-06-08 Perforation 461.60 462.10 13
2009-06-08 Perforation 970.60 971.10 13
2009-06-08 Perforation 951.20 952.20 13
2009-06-08 Perforation 945.70 946.70 13
2009-06-08 Perforation 996.00 996.50 13
2009-06-08 Perforation 982.60 983.10 13
2009-06-08 Perforation 604.30 604.80 13
2009-06-08 Perforation 978.40 979.40 13
2009-06-08 Perforation 944.30 944.80 13
2009-06-08 Perforation 877.90 878.90 13
2009-06-08 Perforation 872.60 873.10 13
2009-06-08 Perforation 800.20 800.70 13
2009-06-08 Perforation 918.00 918.50 13
2009-06-08 Perforation 924.40 924.90 13
2009-06-08 Perforation 905.90 908.90 13
2009-06-10 Fracture 761.50 763.50 0
2009-06-10 Fracture 770.50 772.50 0
2009-06-08 Perforation 588.50 589.50 13
2009-06-10 Fracture 443.80 996.50 0
2009-06-08 Perforation 559.00 560.00 13
2009-06-08 Perforation 789.80 790.30 13
2009-06-08 Perforation 625.10 626.10 13
2009-06-08 Perforation 609.60 610.10 13
2009-06-08 Perforation 524.40 524.90 13
2009-06-08 Perforation 443.80 445.80 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6672 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 6737 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8280 0.0 0.0 0.0
2014 8740 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References