If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274272014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.329618,"lon":-113.760135,"icon":""}]} |
Location: 00/14-20-027-27W4/0 | |
Location Alias: 00/14-20-27-27 W4M | |
Location Alias 2: 00/14-20-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 20 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 14-20-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0405312 | |
License Date: 2008-12-04 | |
License Status: Issued | |
Spud Date: 2009-01-23 | |
Final Drill Date: 2009-01-25 | |
Well Total Depth: 1467.00 m | |
Surface Hole Latitude: 51.329618 | |
Surface Hole Longitude: -113.760135 |
Date | Event |
---|---|
2008-12-04 | Obtained License |
2009-01-23 | Surface Casing Operation Performed |
2009-01-24 | Direction Drilling Operation Performed - Deviate |
2009-01-25 | Finished Drilling |
2009-01-25 | Well Mode changed to Drilled and Cased |
2009-01-26 | Production Casing Operation Performed |
2009-01-26 | Rig Released |
2009-01-30 | Well Log Performed |
2009-02-19 | Perforation Treatment Performed - Jet Perforation |
2009-03-29 | Well Began Production |
2009-03-29 | Well Fluid changed to Gas |
2009-03-29 | Well Mode changed to Flowing |
2009-06-08 | Perforation Treatment Performed - Jet Perforation |
2009-06-10 | Perforation Treatment Performed - Fractured |
2009-06-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-06-16 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-19 | Perforation | 1405.00 | 1407.00 | 13 |
2009-06-08 | Perforation | 770.50 | 772.50 | 13 |
2009-06-08 | Perforation | 761.50 | 763.50 | 13 |
2009-06-08 | Perforation | 470.60 | 471.10 | 13 |
2009-06-08 | Perforation | 467.80 | 468.30 | 13 |
2009-06-08 | Perforation | 461.60 | 462.10 | 13 |
2009-06-08 | Perforation | 970.60 | 971.10 | 13 |
2009-06-08 | Perforation | 951.20 | 952.20 | 13 |
2009-06-08 | Perforation | 945.70 | 946.70 | 13 |
2009-06-08 | Perforation | 996.00 | 996.50 | 13 |
2009-06-08 | Perforation | 982.60 | 983.10 | 13 |
2009-06-08 | Perforation | 604.30 | 604.80 | 13 |
2009-06-08 | Perforation | 978.40 | 979.40 | 13 |
2009-06-08 | Perforation | 944.30 | 944.80 | 13 |
2009-06-08 | Perforation | 877.90 | 878.90 | 13 |
2009-06-08 | Perforation | 872.60 | 873.10 | 13 |
2009-06-08 | Perforation | 800.20 | 800.70 | 13 |
2009-06-08 | Perforation | 918.00 | 918.50 | 13 |
2009-06-08 | Perforation | 924.40 | 924.90 | 13 |
2009-06-08 | Perforation | 905.90 | 908.90 | 13 |
2009-06-10 | Fracture | 761.50 | 763.50 | 0 |
2009-06-10 | Fracture | 770.50 | 772.50 | 0 |
2009-06-08 | Perforation | 588.50 | 589.50 | 13 |
2009-06-10 | Fracture | 443.80 | 996.50 | 0 |
2009-06-08 | Perforation | 559.00 | 560.00 | 13 |
2009-06-08 | Perforation | 789.80 | 790.30 | 13 |
2009-06-08 | Perforation | 625.10 | 626.10 | 13 |
2009-06-08 | Perforation | 609.60 | 610.10 | 13 |
2009-06-08 | Perforation | 524.40 | 524.90 | 13 |
2009-06-08 | Perforation | 443.80 | 445.80 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6672 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 6737 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8280 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8756 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]