If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274272308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.319717,"lon":-113.688009,"icon":""}]} |
Location: 00/08-23-027-27W4/0 | |
Location Alias: 00/08-23-27-27 W4M | |
Location Alias 2: 00/08-23-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 23 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-23-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0421991 | |
License Date: 2010-07-21 | |
License Status: Issued | |
Spud Date: 2010-10-20 | |
Final Drill Date: 2010-11-10 | |
Well Total Depth: 1061.00 m | |
Surface Hole Latitude: 51.319717 | |
Surface Hole Longitude: -113.688009 |
Date | Event |
---|---|
2010-07-21 | Obtained License |
2010-10-20 | Lost Circulation Occurred |
2010-10-20 | Surface Casing Operation Performed |
2010-11-10 | Finished Drilling |
2010-11-10 | Production Casing Operation Performed |
2010-11-10 | Rig Released |
2010-11-10 | Well Mode changed to Drilled and Cased |
2010-11-13 | Well Log Performed |
2011-01-16 | Perforation Treatment Performed - Jet Perforation |
2011-02-04 | Perforation Treatment Performed - Fractured |
2011-02-07 | Well Fluid changed to Gas |
2011-02-07 | Well Mode changed to Testing |
2011-02-17 | Perforation Treatment Performed - Jet Perforation |
2011-02-21 | Perforation Treatment Performed - Fractured |
2011-03-15 | Well Began Production |
2011-03-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-16 | Perforation | 512.00 | 514.00 | 13 |
2011-02-17 | Perforation | 458.50 | 460.50 | 13 |
2011-02-17 | Perforation | 533.50 | 536.50 | 13 |
2011-02-17 | Perforation | 437.00 | 440.00 | 13 |
2011-02-17 | Perforation | 451.00 | 453.50 | 13 |
2011-02-17 | Perforation | 403.00 | 403.50 | 13 |
2011-02-17 | Perforation | 412.30 | 412.80 | 13 |
2011-02-17 | Perforation | 623.00 | 626.00 | 13 |
2011-02-17 | Perforation | 628.00 | 631.00 | 13 |
2011-02-17 | Perforation | 422.50 | 425.50 | 13 |
2011-02-17 | Perforation | 277.00 | 280.00 | 13 |
2011-01-16 | Perforation | 500.00 | 502.00 | 13 |
2011-02-17 | Perforation | 283.00 | 285.00 | 13 |
2011-02-17 | Perforation | 265.50 | 267.00 | 13 |
2011-02-17 | Perforation | 271.50 | 274.00 | 13 |
2011-02-17 | Perforation | 355.50 | 356.50 | 13 |
2011-02-17 | Perforation | 370.50 | 372.00 | 13 |
2011-02-17 | Perforation | 317.50 | 319.00 | 13 |
2011-02-17 | Perforation | 322.00 | 324.00 | 13 |
2011-02-17 | Perforation | 427.90 | 428.40 | 13 |
2011-02-17 | Perforation | 660.70 | 661.20 | 13 |
2011-02-17 | Perforation | 675.60 | 676.10 | 13 |
2011-01-16 | Perforation | 465.50 | 467.50 | 13 |
2011-02-17 | Perforation | 659.80 | 660.30 | 13 |
2011-02-17 | Perforation | 645.90 | 648.40 | 13 |
2011-02-17 | Perforation | 653.50 | 654.00 | 13 |
2011-02-17 | Perforation | 677.60 | 678.60 | 13 |
2011-02-17 | Perforation | 702.50 | 703.50 | 13 |
2011-02-17 | Perforation | 712.00 | 712.50 | 13 |
2011-02-17 | Perforation | 696.10 | 696.60 | 13 |
2011-02-17 | Perforation | 683.80 | 685.30 | 13 |
2011-02-17 | Perforation | 687.80 | 688.80 | 13 |
2011-02-17 | Perforation | 554.80 | 555.30 | 13 |
2011-01-16 | Perforation | 785.00 | 787.00 | 13 |
2011-02-17 | Perforation | 434.20 | 434.70 | 13 |
2011-02-17 | Perforation | 543.20 | 543.70 | 13 |
2011-02-17 | Perforation | 599.50 | 600.00 | 13 |
2011-02-17 | Perforation | 618.20 | 618.70 | 13 |
2011-02-17 | Perforation | 558.10 | 558.60 | 13 |
2011-02-21 | Fracture | 623.00 | 626.00 | 0 |
2011-02-21 | Fracture | 422.50 | 425.50 | 0 |
2011-02-21 | Fracture | 265.50 | 372.00 | 0 |
2011-02-21 | Fracture | 437.00 | 460.50 | 0 |
2011-02-21 | Fracture | 533.50 | 536.50 | 0 |
2011-01-16 | Perforation | 737.00 | 739.00 | 13 |
2011-02-21 | Fracture | 628.00 | 631.00 | 0 |
2011-02-21 | Fracture | 427.90 | 434.70 | 0 |
2011-02-21 | Fracture | 403.00 | 412.80 | 0 |
2011-02-21 | Fracture | 543.20 | 618.70 | 0 |
2011-02-21 | Fracture | 712.00 | 712.50 | 0 |
2011-02-21 | Fracture | 645.90 | 703.50 | 0 |
2011-01-16 | Perforation | 726.50 | 728.00 | 13 |
2011-02-04 | Fracture | 465.50 | 467.50 | 0 |
2011-02-04 | Fracture | 500.00 | 502.00 | 0 |
2011-02-04 | Fracture | 512.00 | 514.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6986 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8751 | 0.0 | 0.0 | 0.0 |
2017 | 8630 | 0.0 | 0.0 | 0.0 |
2018 | 8627 | 0.0 | 0.0 | 0.0 |
2019 | 8701 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-10-20 | Lost Circulation | 17.00 | 20.00 |
For data sources see[6]