If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274272314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.327854,"lon":-113.698595,"icon":""}]} |
| Location: 00/14-23-027-27W4/0 | |
| Location Alias: 00/14-23-27-27 W4M | |
| Location Alias 2: 00/14-23-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 23 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 14-23-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0424091 | |
| License Date: 2010-09-30 | |
| License Status: Issued | |
| Spud Date: 2010-10-22 | |
| Final Drill Date: 2010-11-14 | |
| Well Total Depth: 1068.00 m | |
| Surface Hole Latitude: 51.327854 | |
| Surface Hole Longitude: -113.698595 |
| Date | Event |
|---|---|
| 2010-09-30 | Obtained License |
| 2010-10-23 | Surface Casing Operation Performed |
| 2010-11-14 | Finished Drilling |
| 2010-11-14 | Production Casing Operation Performed |
| 2010-11-14 | Rig Released |
| 2010-11-14 | Well Mode changed to Drilled and Cased |
| 2010-11-18 | Well Log Performed |
| 2011-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-20 | Perforation Treatment Performed - Fractured |
| 2011-01-23 | Well Fluid changed to Gas |
| 2011-01-23 | Well Mode changed to Testing |
| 2011-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-09 | Perforation Treatment Performed - Fractured |
| 2011-02-17 | Well Began Production |
| 2011-02-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-17 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-04 | Perforation | 1036.50 | 1038.50 | 13 |
| 2011-02-04 | Perforation | 637.20 | 637.70 | 13 |
| 2011-02-04 | Perforation | 666.00 | 666.50 | 13 |
| 2011-02-04 | Perforation | 671.90 | 672.40 | 13 |
| 2011-02-04 | Perforation | 639.00 | 641.00 | 13 |
| 2011-02-04 | Perforation | 658.40 | 660.90 | 13 |
| 2011-02-04 | Perforation | 561.90 | 562.40 | 13 |
| 2011-02-04 | Perforation | 418.00 | 418.50 | 13 |
| 2011-02-04 | Perforation | 430.00 | 430.50 | 13 |
| 2011-02-04 | Perforation | 292.60 | 293.10 | 13 |
| 2011-02-04 | Perforation | 294.60 | 295.10 | 13 |
| 2011-01-04 | Perforation | 811.00 | 813.00 | 13 |
| 2011-02-04 | Perforation | 434.40 | 434.90 | 13 |
| 2011-02-04 | Perforation | 448.80 | 449.30 | 13 |
| 2011-02-04 | Perforation | 552.60 | 553.10 | 13 |
| 2011-02-04 | Perforation | 436.80 | 437.30 | 13 |
| 2011-02-04 | Perforation | 443.80 | 444.30 | 13 |
| 2011-02-04 | Perforation | 383.00 | 384.00 | 13 |
| 2011-02-04 | Perforation | 461.50 | 464.50 | 13 |
| 2011-02-04 | Perforation | 306.00 | 308.00 | 13 |
| 2011-02-04 | Perforation | 320.50 | 322.00 | 13 |
| 2011-02-04 | Perforation | 469.50 | 471.00 | 13 |
| 2011-01-04 | Perforation | 518.00 | 520.00 | 13 |
| 2011-02-04 | Perforation | 643.50 | 644.50 | 13 |
| 2011-02-04 | Perforation | 781.00 | 783.00 | 13 |
| 2011-02-04 | Perforation | 477.00 | 480.00 | 13 |
| 2011-02-04 | Perforation | 592.50 | 593.50 | 13 |
| 2011-02-04 | Perforation | 725.10 | 726.10 | 13 |
| 2011-02-04 | Perforation | 689.70 | 690.70 | 13 |
| 2011-02-04 | Perforation | 694.90 | 695.90 | 13 |
| 2011-02-04 | Perforation | 716.60 | 718.10 | 13 |
| 2011-02-04 | Perforation | 699.20 | 699.70 | 13 |
| 2011-02-09 | Fracture | 658.40 | 718.10 | 0 |
| 2011-01-20 | Fracture | 811.00 | 813.00 | 0 |
| 2011-02-09 | Fracture | 605.20 | 641.00 | 0 |
| 2011-02-09 | Fracture | 552.60 | 577.30 | 0 |
| 2011-02-09 | Fracture | 418.00 | 449.30 | 0 |
| 2011-02-09 | Fracture | 292.60 | 295.10 | 0 |
| 2011-02-09 | Fracture | 725.10 | 726.10 | 0 |
| 2011-02-09 | Fracture | 592.50 | 593.50 | 0 |
| 2011-02-09 | Fracture | 643.50 | 644.50 | 0 |
| 2011-02-09 | Fracture | 461.50 | 480.00 | 0 |
| 2011-02-09 | Fracture | 781.00 | 783.00 | 0 |
| 2011-02-09 | Fracture | 306.00 | 384.00 | 0 |
| 2011-01-20 | Fracture | 518.00 | 520.00 | 0 |
| 2011-02-04 | Perforation | 605.20 | 605.70 | 13 |
| 2011-02-04 | Perforation | 634.20 | 634.70 | 13 |
| 2011-02-04 | Perforation | 569.50 | 570.50 | 13 |
| 2011-02-04 | Perforation | 576.80 | 577.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7630 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8746 | 0.0 | 0.0 | 0.0 |
| 2016 | 8319 | 0.0 | 0.0 | 0.0 |
| 2017 | 8630 | 0.0 | 0.0 | 0.0 |
| 2018 | 8627 | 0.0 | 0.0 | 0.0 |
| 2019 | 8701 | 0.0 | 0.0 | 0.0 |
| 2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[5]