X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274272409000

Well Details

Well ID: 0274272409000
Loading map...
Location: 00/09-24-027-27W4/0
Location Alias: 00/09-24-27-27 W4M
Location Alias 2: 00/09-24-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 24
County/Municipality: Rocky View County
Well Name: EMBER 9A ENTICE 9-24-27-27
Operator Name: Ember Resources Inc.
License Number: 0228683
License Date: 1999-11-15
License Status: Issued
Spud Date: 1999-12-21
Final Drill Date: 2000-01-05
Well Total Depth: 1120.00 m
Surface Hole Latitude: 51.323171
Surface Hole Longitude: -113.662441

For data sources see[1][2]

Well History

Date Event
1999-11-15 Obtained License
1999-12-21 Surface Casing Operation Performed
2000-01-05 Finished Drilling
2000-01-06 Production Casing Operation Performed
2000-01-06 Rig Released
2000-01-06 Well Mode changed to Drilled and Cased
2000-06-28 Well Log Performed
2000-08-10 Perforation Treatment Performed - Jet Perforation
2000-08-22 Perforation Treatment Performed - Jet Perforation
2000-09-15 Perforation Treatment Performed - Jet Perforation
2000-09-28 Perforation Treatment Performed - Fractured
2003-04-23 Well Began Production
2003-04-23 Well Fluid changed to Gas
2003-04-23 Well Mode changed to Flowing
2004-10-29 Perforation Treatment Performed - Jet Perforation
2004-11-16 Perforation Treatment Performed - Fractured
2006-04-01 Well Fluid changed to Gas
2006-04-01 Well Mode changed to Suspended
2017-04-25 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-10 Perforation 985.00 988.00 7
2004-10-29 Perforation 680.80 681.30 13
2004-10-29 Perforation 672.70 673.20 13
2004-10-29 Perforation 665.90 666.40 13
2004-10-29 Perforation 661.00 661.50 13
2004-10-29 Perforation 649.90 650.40 13
2004-10-29 Perforation 636.70 637.20 13
2004-10-29 Perforation 635.70 636.20 13
2004-10-29 Perforation 630.30 630.80 13
2004-10-29 Perforation 623.00 623.50 13
2004-10-29 Perforation 596.50 597.00 13
2000-08-10 Perforation 981.00 984.00 7
2004-10-29 Perforation 590.80 591.30 13
2004-10-29 Perforation 588.30 588.80 13
2004-10-29 Perforation 562.20 562.70 13
2004-10-29 Perforation 527.40 527.90 13
2004-10-29 Perforation 508.80 509.30 13
2004-10-29 Perforation 496.20 496.70 13
2004-10-29 Perforation 411.30 411.80 13
2004-10-29 Perforation 406.50 407.00 13
2004-10-29 Perforation 391.30 391.80 13
2004-10-29 Perforation 265.00 265.50 13
2000-08-22 Perforation 876.00 879.00 7
2004-10-29 Perforation 257.00 257.50 13
2004-10-29 Perforation 238.60 239.10 13
2004-10-29 Perforation 235.00 235.50 13
2004-11-16 Fracture 235.00 700.00 0
2000-09-15 Perforation 771.00 774.00 7
2000-09-15 Perforation 762.50 766.50 7
2000-09-28 Fracture 762.50 774.00 0
2004-10-29 Perforation 699.50 700.00 13
2004-10-29 Perforation 695.20 695.70 13
2004-10-29 Perforation 681.70 682.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2109 0.0 0.0 0.0
2004 4127 0.0 0.0 0.0

For data sources see[5]

References