X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274272712000

Well Details

Well ID: 0274272712000
Loading map...
Location: 00/12-27-027-27W4/0
Location Alias: 00/12-27-27-27 W4M
Location Alias 2: 00/12-27-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 27
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 12-27-27-27
Operator Name: Ember Resources Inc.
License Number: 0381640
License Date: 2007-09-10
License Status: Issued
Spud Date: 2007-10-22
Final Drill Date: 2007-10-23
Well Total Depth: 1193.00 m
Surface Hole Latitude: 51.332776
Surface Hole Longitude: -113.724759

For data sources see[1][2]

Well History

Date Event
2007-09-10 Obtained License
2007-10-22 Direction Drilling Operation Performed - Deviate
2007-10-23 Finished Drilling
2007-10-23 Surface Casing Operation Performed
2007-10-23 Well Mode changed to Drilled and Cased
2007-10-24 Production Casing Operation Performed
2007-10-24 Rig Released
2007-12-02 Well Log Performed
2008-01-09 Perforation Treatment Performed - Jet Perforation
2008-01-22 Perforation Treatment Performed - Fractured
2008-01-27 Well Fluid changed to Gas
2008-01-27 Well Mode changed to Testing
2008-02-02 Perforation Treatment Performed - Jet Perforation
2008-02-07 Perforation Treatment Performed - Fractured
2008-04-01 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-10-22 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-09 Perforation 760.50 763.50 13
2008-02-02 Perforation 930.50 931.00 13
2008-02-02 Perforation 917.10 919.10 13
2008-02-02 Perforation 890.20 893.20 13
2008-02-02 Perforation 806.10 806.60 13
2008-02-02 Perforation 801.20 802.20 13
2008-02-02 Perforation 777.60 778.10 13
2008-02-02 Perforation 626.90 627.40 13
2008-02-02 Perforation 615.00 615.50 13
2008-02-02 Perforation 611.10 611.60 13
2008-02-02 Perforation 592.80 593.30 13
2008-01-22 Fracture 760.50 763.50 0
2008-02-02 Perforation 425.60 426.10 13
2008-02-07 Fracture 425.60 1011.40 0
2008-02-02 Perforation 1010.90 1011.40 13
2008-02-02 Perforation 999.30 999.80 13
2008-02-02 Perforation 996.60 997.60 13
2008-02-02 Perforation 973.20 974.20 13
2008-02-02 Perforation 967.70 968.70 13
2008-02-02 Perforation 962.10 963.10 13
2008-02-02 Perforation 938.80 939.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 24 0.0 0.0 0.0

For data sources see[6]

References