If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274272805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.335219,"lon":-113.754765,"icon":""}]} |
Location: 00/05-28-027-27W4/0 | |
Location Alias: 00/05-28-27-27 W4M | |
Location Alias 2: 00/05-28-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 28 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 5-28-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0408423 | |
License Date: 2009-01-23 | |
License Status: Issued | |
Spud Date: 2009-02-04 | |
Final Drill Date: 2009-02-05 | |
Well Total Depth: 899.00 m | |
Surface Hole Latitude: 51.335219 | |
Surface Hole Longitude: -113.754765 |
Date | Event |
---|---|
2009-01-23 | Obtained License |
2009-02-04 | Surface Casing Operation Performed |
2009-02-05 | Finished Drilling |
2009-02-05 | Production Casing Operation Performed |
2009-02-05 | Rig Released |
2009-02-05 | Well Log Performed |
2009-02-05 | Well Mode changed to Drilled and Cased |
2009-02-13 | Well Log Performed |
2009-03-04 | Perforation Treatment Performed - Jet Perforation |
2009-03-11 | Perforation Treatment Performed - Fractured |
2009-03-16 | Well Fluid changed to Gas |
2009-03-16 | Well Mode changed to Testing |
2009-05-07 | Well Began Production |
2009-05-07 | Well Fluid changed to Gas |
2009-05-07 | Well Mode changed to Flowing |
2009-12-17 | Perforation Treatment Performed - Jet Perforation |
2009-12-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-12-21 | Well Mode changed to Flowing |
2009-12-23 | Well Log Performed |
2010-01-10 | Perforation Treatment Performed - Fractured |
2010-05-20 | Well Log Performed |
2010-11-11 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-04 | Perforation | 840.50 | 843.30 | 13 |
2009-12-17 | Perforation | 737.10 | 737.60 | 13 |
2009-12-17 | Perforation | 731.20 | 732.20 | 13 |
2009-12-17 | Perforation | 711.30 | 711.80 | 13 |
2009-12-17 | Perforation | 693.20 | 695.20 | 13 |
2009-12-17 | Perforation | 674.10 | 675.10 | 13 |
2009-12-17 | Perforation | 671.70 | 672.20 | 13 |
2009-12-17 | Perforation | 668.00 | 668.50 | 13 |
2009-12-17 | Perforation | 612.90 | 613.40 | 13 |
2009-12-17 | Perforation | 609.30 | 609.80 | 13 |
2009-12-17 | Perforation | 605.40 | 605.90 | 13 |
2009-03-04 | Perforation | 662.00 | 665.00 | 13 |
2009-12-17 | Perforation | 594.10 | 594.60 | 13 |
2009-12-17 | Perforation | 471.30 | 471.80 | 13 |
2009-12-17 | Perforation | 453.30 | 453.80 | 13 |
2009-12-17 | Perforation | 350.20 | 350.70 | 13 |
2009-12-17 | Perforation | 705.50 | 707.50 | 13 |
2009-12-17 | Perforation | 507.00 | 508.00 | 13 |
2009-12-17 | Perforation | 497.00 | 498.00 | 13 |
2009-12-17 | Perforation | 476.00 | 479.00 | 13 |
2009-12-17 | Perforation | 465.00 | 467.00 | 13 |
2009-12-17 | Perforation | 411.50 | 413.50 | 13 |
2009-03-04 | Perforation | 559.00 | 562.00 | 13 |
2009-12-17 | Perforation | 371.50 | 375.50 | 13 |
2009-12-17 | Perforation | 365.00 | 367.00 | 13 |
2010-01-10 | Fracture | 350.20 | 769.10 | 0 |
2010-01-10 | Fracture | 365.00 | 707.50 | 0 |
2009-03-04 | Perforation | 344.00 | 346.00 | 13 |
2009-03-11 | Fracture | 662.00 | 665.00 | 0 |
2009-03-11 | Fracture | 559.00 | 562.00 | 0 |
2009-12-17 | Perforation | 768.10 | 769.10 | 13 |
2009-12-17 | Perforation | 757.90 | 758.40 | 13 |
2009-12-17 | Perforation | 741.20 | 741.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 5784 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8742 | 0.0 | 0.0 | 0.0 |
2012 | 8662 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8756 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]