X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274273406002

Well Details

Well ID: 0274273406002
Loading map...
Location: 00/06-34-027-27W4/2
Location Alias: 00/06-34-27-27 W4M
Location Alias 2: 00/06-34-027-27 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 34
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 6-34-27-27
Operator Name: Ember Resources Inc.
License Number: 0405752
License Date: 2008-12-09
License Status: Issued
Spud Date: 2009-01-11
Final Drill Date: 2009-01-13
Well Total Depth: 1144.00 m
Surface Hole Latitude: 51.347430
Surface Hole Longitude: -113.723893

For data sources see[1][2]

Well History

Date Event
2008-12-09 Obtained License
2009-01-11 Lost Circulation Occurred
2009-01-12 Surface Casing Operation Performed
2009-01-13 Finished Drilling
2009-01-13 Well Mode changed to Drilled and Cased
2009-01-14 Production Casing Operation Performed
2009-01-14 Rig Released
2009-01-20 Well Log Performed
2009-02-01 Perforation Treatment Performed - Jet Perforation
2009-02-12 Perforation Treatment Performed - Fractured
2009-02-27 Perforation Treatment Performed - Jet Perforation
2009-04-02 Well Began Production
2009-04-02 Well Fluid changed to Gas
2009-04-02 Well Mode changed to Flowing
2009-06-05 Perforation Treatment Performed - Jet Perforation
2009-06-09 Perforation Treatment Performed - Fractured
2009-07-25 Well Structure changed to Commingled
2010-08-03 Perforation Treatment Performed - Jet Perforation
2010-08-16 Perforation Treatment Performed - Fractured
2010-08-26 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-01 Perforation 1060.00 1063.00 13
2009-06-05 Perforation 308.00 308.50 13
2009-06-05 Perforation 400.00 402.00 13
2009-06-05 Perforation 442.50 443.00 13
2009-06-05 Perforation 440.10 440.60 13
2009-06-05 Perforation 649.10 650.10 13
2009-06-05 Perforation 732.30 732.80 13
2009-06-05 Perforation 728.90 729.90 13
2009-06-05 Perforation 751.50 752.00 13
2009-06-05 Perforation 739.60 740.60 13
2009-06-05 Perforation 716.00 716.50 13
2009-02-01 Perforation 1054.00 1057.00 13
2009-06-05 Perforation 682.10 682.60 13
2009-06-05 Perforation 672.00 674.00 13
2009-06-05 Perforation 711.20 712.20 13
2009-06-05 Perforation 706.40 706.90 13
2009-06-09 Fracture 400.00 402.00 0
2009-06-09 Fracture 308.00 740.60 0
2010-08-03 Perforation 902.00 903.00 13
2010-08-03 Perforation 691.00 692.00 13
2010-08-03 Perforation 656.00 658.00 13
2010-08-03 Perforation 631.00 633.00 13
2009-02-12 Fracture 1054.00 1063.00 0
2010-08-03 Perforation 572.00 575.00 13
2010-08-03 Perforation 492.50 494.50 13
2010-08-03 Perforation 454.00 456.00 13
2010-08-03 Perforation 449.00 452.00 13
2010-08-03 Perforation 435.00 437.00 13
2010-08-03 Perforation 426.00 428.00 13
2010-08-03 Perforation 420.00 422.00 13
2010-08-03 Perforation 301.00 303.00 13
2010-08-16 Fracture 301.00 752.00 0
2009-02-27 Perforation 744.00 747.00 13
2009-06-05 Perforation 586.10 586.60 13
2009-06-05 Perforation 567.90 568.90 13
2009-06-05 Perforation 643.80 644.30 13
2009-06-05 Perforation 590.20 590.70 13
2009-06-05 Perforation 460.90 461.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 2160 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-01-11 Lost Circulation 48.00 68.00

For data sources see[6]

References