If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274273614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.357429,"lon":-113.674878,"icon":""}]} |
Location: 00/14-36-027-27W4/0 | |
Location Alias: 00/14-36-27-27 W4M | |
Location Alias 2: 00/14-36-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 14-36-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0384339 | |
License Date: 2007-11-07 | |
License Status: Issued | |
Spud Date: 2007-12-13 | |
Final Drill Date: 2007-12-16 | |
Well Total Depth: 834.00 m | |
Surface Hole Latitude: 51.357429 | |
Surface Hole Longitude: -113.674878 |
Date | Event |
---|---|
2007-11-07 | Obtained License |
2007-12-13 | Surface Casing Operation Performed |
2007-12-16 | Finished Drilling |
2007-12-16 | Production Casing Operation Performed |
2007-12-16 | Well Mode changed to Drilled and Cased |
2007-12-17 | Rig Released |
2007-12-20 | Well Log Performed |
2008-01-24 | Perforation Treatment Performed - Jet Perforation |
2008-01-31 | Well Fluid changed to Gas |
2008-01-31 | Well Mode changed to Testing |
2008-02-06 | Perforation Treatment Performed - Jet Perforation |
2008-02-13 | Perforation Treatment Performed - Fractured |
2008-03-27 | Well Began Production |
2008-03-27 | Well Fluid changed to Gas |
2008-03-27 | Well Mode changed to Flowing |
2008-08-09 | Perforation Treatment Performed - Jet Perforation |
2008-08-12 | Perforation Treatment Performed - Fractured |
2008-08-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-08-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-24 | Perforation | 782.00 | 784.00 | 13 |
2008-08-09 | Perforation | 669.70 | 670.20 | 13 |
2008-08-09 | Perforation | 663.70 | 665.70 | 13 |
2008-08-09 | Perforation | 661.30 | 662.30 | 13 |
2008-08-09 | Perforation | 645.50 | 646.00 | 13 |
2008-08-09 | Perforation | 639.50 | 640.00 | 13 |
2008-08-09 | Perforation | 629.70 | 631.70 | 13 |
2008-08-09 | Perforation | 611.20 | 612.20 | 13 |
2008-08-09 | Perforation | 609.90 | 610.40 | 13 |
2008-08-09 | Perforation | 607.50 | 608.00 | 13 |
2008-08-09 | Perforation | 574.40 | 574.90 | 13 |
2008-02-06 | Perforation | 244.00 | 247.00 | 13 |
2008-08-09 | Perforation | 544.40 | 544.90 | 13 |
2008-08-09 | Perforation | 540.70 | 541.20 | 13 |
2008-08-09 | Perforation | 529.20 | 529.70 | 13 |
2008-08-09 | Perforation | 414.60 | 415.10 | 13 |
2008-08-09 | Perforation | 403.10 | 403.60 | 13 |
2008-08-09 | Perforation | 289.30 | 289.80 | 13 |
2008-08-09 | Perforation | 287.80 | 288.30 | 13 |
2008-08-09 | Perforation | 281.20 | 281.70 | 13 |
2008-08-09 | Perforation | 277.20 | 277.70 | 13 |
2008-08-12 | Fracture | 501.50 | 603.50 | 0 |
2008-02-13 | Fracture | 244.00 | 247.00 | 0 |
2008-08-12 | Fracture | 277.20 | 694.00 | 0 |
2008-08-09 | Perforation | 601.50 | 603.50 | 13 |
2008-08-09 | Perforation | 514.00 | 516.00 | 13 |
2008-08-09 | Perforation | 501.50 | 503.50 | 13 |
2008-08-09 | Perforation | 693.50 | 694.00 | 13 |
2008-08-09 | Perforation | 684.60 | 686.60 | 13 |
2008-08-09 | Perforation | 677.10 | 677.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 6768 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8756 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]