If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274280412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.284304,"lon":-113.881422,"icon":""}]} |
Location: 00/12-04-027-28W4/0 | |
Location Alias: 00/12-04-27-28 W4M | |
Location Alias 2: 00/12-04-027-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 04 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 12-4-27-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410037 | |
License Date: 2009-04-06 | |
License Status: Amended | |
Spud Date: 2009-12-20 | |
Final Drill Date: 2009-12-22 | |
Well Total Depth: 1528.00 m | |
Surface Hole Latitude: 51.284304 | |
Surface Hole Longitude: -113.881422 |
Date | Event |
---|---|
2009-04-06 | Obtained License |
2009-12-20 | Direction Drilling Operation Performed - Deviate |
2009-12-20 | Surface Casing Operation Performed |
2009-12-22 | Finished Drilling |
2009-12-22 | Well Mode changed to Drilled and Cased |
2009-12-23 | Production Casing Operation Performed |
2009-12-23 | Rig Released |
2010-01-06 | Well Log Performed |
2010-01-22 | Perforation Treatment Performed - Jet Perforation |
2010-02-12 | Perforation Treatment Performed - Jet Perforation |
2010-02-22 | Perforation Treatment Performed - Fractured |
2010-09-28 | Well Began Production |
2010-09-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-20 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-22 | Perforation | 899.00 | 902.00 | 13 |
2010-02-12 | Perforation | 928.70 | 929.20 | 13 |
2010-02-12 | Perforation | 775.00 | 777.00 | 13 |
2010-02-12 | Perforation | 968.00 | 970.00 | 13 |
2010-02-12 | Perforation | 580.00 | 583.00 | 13 |
2010-02-12 | Perforation | 716.00 | 717.00 | 13 |
2010-02-12 | Perforation | 607.10 | 607.60 | 13 |
2010-02-12 | Perforation | 611.00 | 611.50 | 13 |
2010-02-12 | Perforation | 992.00 | 995.00 | 13 |
2010-02-12 | Perforation | 601.30 | 601.80 | 13 |
2010-02-12 | Perforation | 1093.10 | 1093.60 | 13 |
2010-01-22 | Perforation | 1430.00 | 1433.00 | 13 |
2010-02-12 | Perforation | 1108.30 | 1108.80 | 13 |
2010-02-12 | Perforation | 1085.00 | 1086.00 | 13 |
2010-02-12 | Perforation | 1088.90 | 1089.90 | 13 |
2010-02-12 | Perforation | 1124.50 | 1125.00 | 13 |
2010-02-12 | Perforation | 1132.70 | 1133.20 | 13 |
2010-02-12 | Perforation | 1110.30 | 1111.30 | 13 |
2010-02-12 | Perforation | 1121.40 | 1122.40 | 13 |
2010-02-12 | Perforation | 1012.10 | 1012.60 | 13 |
2010-02-12 | Perforation | 1025.70 | 1026.70 | 13 |
2010-02-12 | Perforation | 982.40 | 982.90 | 13 |
2010-02-12 | Perforation | 678.50 | 679.00 | 13 |
2010-02-12 | Perforation | 1008.90 | 1009.40 | 13 |
2010-02-12 | Perforation | 1045.40 | 1046.40 | 13 |
2010-02-12 | Perforation | 1065.80 | 1066.30 | 13 |
2010-02-12 | Perforation | 1047.00 | 1047.50 | 13 |
2010-02-12 | Perforation | 1055.50 | 1056.00 | 13 |
2010-02-22 | Fracture | 580.00 | 995.00 | 0 |
2010-02-22 | Fracture | 601.30 | 1133.20 | 0 |
2010-02-12 | Perforation | 759.00 | 759.50 | 13 |
2010-02-12 | Perforation | 612.10 | 612.60 | 13 |
2010-02-12 | Perforation | 614.00 | 614.50 | 13 |
2010-02-12 | Perforation | 932.70 | 933.20 | 13 |
2010-02-12 | Perforation | 935.60 | 936.10 | 13 |
2010-02-12 | Perforation | 781.50 | 782.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2280 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8724 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[6]